unit 22 final revision

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

what is the process involve planning, managing and organizing resources to achieve a goal?

a)

project

b)

project management

c)

project planning

d)

project organizing

2.

what is the stage in which the Scope, Tasks, and Schedule are highlighted to the project team??

a)

Planning

b)

Executing

c)

Monitoring and Controlling

d)

Closing

3.

what is the document that is prepared to be shown to the sponsor for approval?

a)

business case

b)

feasibility study

c)

project brief

d)

project plan

4.

what is the forth stage in managing any project?

a)

planning

b)

Execution

c)

Monitor and Control

d)

Closing

5.

what is the project document that shows the responsibilities and the tasks of each team member?

a)

project’s scope

b)

Statement of contract

c)

project brief

d)

Project summary

6.

what is the project document that shows that tasks of the project in divided format?

a)

Project plan or summary

b)

Project brief

c)

Project scope

d)

Work Breakdown Structure

7.

A stack holder who uses the outcomes of the project??

a)

client

b)

end-user

c)

project manger

d)

project member

8.

what is the project parameter that ensure the project is within the planned sources of funds?

a)

Legislative and quality standards

b)

Physical, human and technical resources standards

c)

Critical path method

d)

Finances for project

9.

what is the project parameter that is related to how provide services and materials from outside the project??

a)

Procurement requirements associated with project.

b)

Project risk

c)

Reporting requirements

d)

Finances for the project

10.

what is the project tool that shows a visual view of the tasks of the project??

a)

CPM

b)

Gantt chart

c)

Life Cycle Cost Analysis

d)

Logistics support analysis

11.

what is the project requirements that are not written by the government and show how a job is performed?

a)

Regulations

b)

Standards

c)

Codes of practice

d)

Legislation

12.

it is an established procedure that confirm the compliance of the practices of the project with health and safety principles?

a)

Conformity notices

b)

Design specifications

c)

Job plans

d)

Job safety analysis

13.

It is a document that ensure that there is a hazard identification to effectively manage workplace.

a)

Project risk

b)

Permissions to work

c)

Risk assessment documentation

d)

Standard operating procedures

14.

what is the project requirement that shows the product is installed and produced?

a)

Codes of practice

b)

Manufacturer’s specifications

c)

Policy and/or guidelines, government and/or industry

d)

Standards

15.

what is the critical path method?

a)

A project parameter

b)

A project tool

c)

A project requirement

d)

A project document