WorksheetsPT716A_Day2_Gourab Kolay_108_Pilot Plant Scale Up Technique
Total questions: 10
Worksheet time: 6mins
which of the following areas are fall under the 'space requirement' in pilot plant scale up techniques?
Administration and Information processing Area
Physical Testing Area
Standard Equipment Floor Space
Storage Area
Same areas should provided for the storage of the in-process materials, finished bulk products from the pilot-plant & materials from the experimental scale-up batches made in the production.
True
False
purpose/responsibility of the pilot-plant is (a) .
which of the following statements is/are false about equipment?
The most economical and the simplest & efficient equipment which are capable of producing product within the proposed specifications are used
The size of the equipment should be such that the experimental trials run should be relevant to the production sized batches
If the equipment is too small the process developed will scale up.
if equipment is too big then the wastage of the expensive active ingredients occurs.
According to Pilot Plant scale Up Technique, what Is/are the following aspect of Master Manufacturing Procedures?
Weight Sheet
Processing Direction
Manufacturing Procedures
All of the above option are the aspects
which are the following factors that should be examined during the Process Evaluation Studies under Pilot Plant Scale Up Techniques?
Mixing Speed and Time
Rate of addition of granulating agents and solvents
heating and cooling rates,filter sizes,screen sizes
drying temperature,drying time
each pilot batch representing the final formulation and manufacturing procedure should be studied for (a) .
The primary objective of the pilot plant is the physical as well as chemical stability of the products.
true
false
The knowledge of the effects of various process parameters are the basis for -
process optimization
validation
This area should provide permanent (a) for routinely used physical- testing equipment.
