PT716A_Day2_Gourab Kolay_108_Pilot Plant Scale Up Technique

Total questions: 10

Worksheet time: 6mins

Name
Class
Date
1.

which of the following areas are fall under the 'space requirement' in pilot plant scale up techniques?

a)

Administration and Information processing Area

b)

Physical Testing Area

c)

Standard Equipment Floor Space

d)

Storage Area

2.

Same areas should provided for the storage of the in-process materials, finished bulk products from the pilot-plant & materials from the experimental scale-up batches made in the production.

a)

True

b)

False

3.

purpose/responsibility of the pilot-plant is (a)   .

4.

which of the following statements is/are false about equipment?

a)

The most economical and the simplest & efficient equipment which are capable of producing product within the proposed specifications are used

b)

The size of the equipment should be such that the experimental trials run should be relevant to the production sized batches

c)

If the equipment is too small the process developed will scale up.

d)

if equipment is too big then the wastage of the expensive active ingredients occurs.

5.

According to Pilot Plant scale Up Technique, what Is/are the following aspect of Master Manufacturing Procedures?

a)

Weight Sheet

b)

Processing Direction

c)

Manufacturing Procedures

d)

All of the above option are the aspects

6.

which are the following factors that should be examined during the Process Evaluation Studies under Pilot Plant Scale Up Techniques?

a)

Mixing Speed and Time

b)

Rate of addition of granulating agents and solvents

c)

heating and cooling rates,filter sizes,screen sizes

d)

drying temperature,drying time

7.

each pilot batch representing the final formulation and manufacturing procedure should be studied for (a)   .

8.

The primary objective of the pilot plant is the physical as well as chemical stability of the products.

a)

true

b)

false

9.

The knowledge of the effects of various process parameters are the basis for -

a)

process optimization

b)

validation

10.

This area should provide permanent (a)   for routinely used physical- testing equipment.