wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Post Session Quiz

Total questions: 10

Worksheet time: 3mins

Name
Class
Date
1.

No.of LTHE quality objectives as applicable for engineering deliverables upon award of the Project.

a)

5

b)

10

c)

7

d)

3

2.

What does ISO stand for ?

a)

International Organisation for Standardization

b)

International standardization of Organisation.

3.

LTHE QMS comprises of following

a)

Discipline Procedures

b)

Work Procedures

c)

Work instructions

d)

All of the above

4.

This procedure covers the purpose, inputs, contents and activities involved in generation of Instrumentation documents / deliverables.

a)

DP-7603

b)

DP-5400

c)

DP-7300

d)

DP-7500

5.

This procedure describes the organisation structure, responsibilities and activities of

Engineering for Contracts execution, Proposals and Developmental work.

a)

DP – 5005

b)

DP- 5001

c)

DP- 5003

d)

None of the above

6.

The 'holds' that are generated during the contract / project execution shall be recorded and reviewed for clearing them from time to time. Which Company procedure defines the method

a)

CP-5006

b)

CP-5007

c)

CP-5003

d)

CP-5009

7.

What is the frequency to re-validate software used to design and produce deliverables as per CP-5008?

a)

Every 5 years

b)

After external audit by Surveillance auditor.

c)

When there is change in version of software.

d)

Every alternate years.

8.

Document/deliverable shall be checked as per DP5009.

a)

True

b)

False

9.

The scope of CP-5007 procedure is to provide minimum requirements for 3D Model Review both on a regular basis as well as during formal stage reviews.

a)

false

b)

true

10.

The prime objective of this CP-5007 procedure is to

a)

describe a predefined methodology in reviewing the 3D Model

b)

to provide guidelines on when and how to conduct 3D Model Reviews as standard procedure.

c)

Both a and b

d)

Only b