Which of the following would NOT be an action to take for low voltages?

a)

Increase generator MW output

b)

Remove reactors from the system

c)

Increase generator MVAR output

d)

Place capacitors in service

2.

PJM operates its 500 kV system so that no post-contingency voltage drop will exceed what minimum value?

a)

1%

b)

3%

c)

5%

d)

7%

3.

The PJM system operator finds that a 230 kV transmission line is over its normal limit. How long does the operator have to return the line to within its normal limit?

a)

Immediately

b)

5 minutes

c)

15 minutes

d)

30 minutes

4.

What action can an operator take to increase its system dynamic reactive reserve?

a)

Increase a generator MW output

b)

Remove a capacitor from service

c)

Place a capacitor in service

d)

Take a generator off-line

5.

The first step that an operator should take following a system separation should be

a)

Clear all buses

b)

Assess the system

c)

Place all quick-start units in service

d)

Notify NERC

6.

PJM Transmission Operators are required to provide PJM with four sets of thermal limits for all facilities monitored by PJM. Which of the following is NOT one of the four?

a)

Actual

b)

Normal

c)

Short-term emergency

d)

Load dump

7.

If a transmission facility is found to be loaded above its short-term emergency, how long does the operator have to correct the problem?

a)

5 minutes

b)

10 minutes

c)

15 minutes

d)

30 minutes

8.

If a shunt reactor is placed in service, the expected result would be

a)

An increase in voltage

b)

A decrease in voltage

c)

An increase in spinning reserve

d)

A decrease in spinning reserve

9.

What would be the expected results from the tripping of a 1,000 MW generator outside of the PJM control area, but within the Interconnection?

a)

Frequency would drop, but the PJM ACE would remain unchanged

b)

Frequency would drop and the PJM ACE would also indicate under-generation

c)

Frequency and PJM ACE would remain the same

d)

Frequency would drop and the PJM ACE would indicate 1,000 MW under-generation

10.

When a discrepancy occurs between PJM’s thermal rating and a transmission owner’s thermal rating, which of the following is always used?

a)

PJM’s rating

b)

Transmission owner's rating

c)

The most conservative rating

d)

The average of the two ratings

11.

Since PJM operates to a 5% voltage drop limit on the 500 kV system, which of the following would be considered a violation?

a)

Pre – 530 kV, Post – 515 kV

b)

Pre – 545 kV, Post – 520 kV

c)

Pre – 535 kV, Post – 512 kV

d)

Pre – 536 kV, Post – 507 kV

12.

According to the PJM Transmission Operation manual, 500 kV lines that trip out of service should

a)

Be immediately manually reclosed by the operator

b)

Be manually reclosed by the operator after 30 minutes

c)

Automatically reclose

d)

Automatically initiate a transmission outage ticket via eDART

13.

The PJM system has phase angle regulators at various locations around the system. The phase angle regulators are there to help

a)

Maintain system VAR flow

b)

Increase overall system voltages

c)

Control MW flows

d)

Reduce overall market price

14.

When would PJM issue a Heavy Load Voltage Schedule?

a)

When loads are heavy and bulk power voltage levels are expected to be low

b)

When Virgina Power or NY-ISO is experiencing high loads

c)

When a PJM member system is experiencing a new system peak load

d)

When PJM has projected that they will experience problems in meeting their CPS criteria

15.

PJM operates with different temperature adjusted ratings during the day and night periods. If the weather forecast indicates that the day period temperature will be 48 degrees, what temperature setting should be utilized?

a)

41 degree day

b)

41 degree night

c)

50 degree day

d)

50 degree night

16.

Which temperature range makes up the PJM “Summer Value” temperature sets?

a)

41° to 77° F

b)

50° to 77° F

c)

68° to 86° F

d)

68° to 95° F

17.

Which of the following actions would most likely result in the reduction of a generator’s MVAR output?

a)

Placing a nearby reactor in service

b)

Increase the generator MW output

c)

Placing a nearby capacitor in service

d)

Removing a nearby capacitor from service

18.

If your system configuration was such that you had three parallel line of the same construction, length, and impedance with a normal rating of 160 MVA. Each of the lines currently has a loading of 120 MVA on each line. If one of the three lines were to trip out of service, what would be the expected flow on the remaining two lines?

a)

120

b)

160

c)

180

d)

240

19.

If your system configuration was such that you had three parallel line of the same construction, length, and impedance with a normal rating of 155 MVA and an emergency rating of 170 MVA. Each of the lines currently has a loading of 130 MVA on each line. If one of the three lines were to trip out of service, what limits, if any, would be exceeded?

a)

Normal and Emergency

b)

Normal only

c)

Neither due to the surge impedance loading of the line

d)

Emergency only

20.

What is the first task that an operator should perform following a system disturbance that has caused a complete system shutdown?

a)

Restore all available load

b)

Contact priority customers

c)

Determine system status

d)

Review the restoration plan

21.

PJM utilizes four sets of thermal limits that should be submitted for all of the equipment that they are responsible to monitor. Which of the following is not one of the four limits?

a)

Normal

b)

Long-term emergency

c)

Load dump

d)

Temperature

22.

What impact would a transmission line that is loaded below its surge impedance loading have on system voltage?

a)

Lower the voltage

b)

Increase the voltage

c)

Lower the voltage limits

d)

Increase the voltage limits

23.

Your system had two busses that were connected with a 345 kV line. The voltage at bus A is 349 kV and the voltage at bus B is 343 kV. Which direction would the MVAR flow?

a)

From bus A to bus B

b)

From bus B to bus A

c)

MVAR would not flow

d)

Bus voltage has no influence on MVAR flow

24.

Your system had two busses that were connected with a 345 kV line. The phase angle at bus A is –7o and the phase angle at bus B is 2o. Which direction would the MW flow?

a)

From bus A to bus B

b)

From bus B to bus A

c)

MW would not flow

d)

Phase angle has no influence on MW flow

25.

If your system is equipped with 500 kV capacitors that have automatic switching capability, what would be the expected operation of the capacitor if the voltage were between 545 kV and 550 kV for 1 to 15 minutes?

a)

The capacitor would be connected to the system

b)

The capacitor would be disconnected from the system

c)

There are no 500 kV automatically controlled capacitors

d)

The capacitor should remain unchanged

26.

PJM operates the bulk electric system in order that any single facility failure will not cause any other system facility to exceed which of the following limits?

a)

Actual

b)

Normal

c)

Emergency

d)

Load Dump

27.

Which type of relays protection measures and compares the current entering and the current existing the area of protection?

a)

Impedance relay

b)

Differential relay

c)

Distance relay

d)

Out-of-step relay

28.

What is the voltage drop that PJM controls to for the reactive transfer interfaces?

a)

3%

b)

5%

c)

8%

d)

10%

29.

Under the PJM control criteria, if the system experiences an equipment failure and another transmission facility is loaded beyond its short-term emergency rating, how long does PJM have to correct the problem?

a)

10 minutes

b)

15 minutes

c)

20 minutes

d)

30 minutes

30.

If the problem identified in the previous question was not corrected within the allotted time period, which of the following actions would PJM implement

a)

Shift generation

b)

Dump load

c)

Connect capacitors

d)

Issue a warning

31.

If a 500 kV transmission line is loaded to 300 MW, what would the line be doing with regards to MVAR?

a)

Nothing

b)

Providing MVAR to the system

c)

Absorbing MVAR from the system

d)

Calculating

32.

If the Eastern Interconnection experiences a severe system event that causes the frequency to decline to 58.7 Hz in the PJM East Region. What percentage of load should be shed from the operation of under-frequency relay protection?

a)

5%

b)

10%

c)

20%

d)

25%

33.

If a shunt reactor were connected to the system, what would be the expected system response?

a)

Voltage would increase

b)

Voltage would decrease

c)

MW flow would increase

d)

MW flow would decrease

34.

If the frequency indication identifies a drop in system frequency and the PJM ACE remains unchanged, what would be the expected system event that occurred?

a)

PJM lost a block of load

b)

PJM lost a generator

c)

A generator was lost outside of PJM

d)

PJM placed a 500 kV capacitor in service

35.

If your system was experiencing low voltages, which of the following actions would you implement to correct the problem?

a)

Connect a reactor to the system

b)

Connect a capacitor to the system

c)

Increase interchange across your system

d)

Disconnect a capacitor from the system

36.

When PJM is monitoring the 500 kV system for volt drop violations, they control the system to ensure that a voltage drop will not exceed 5%. What is the reason for operating under this criteria?

a)

Maintain economics

b)

Prevent voltage collapse

c)

Minimize generator MVAR support

d)

Reduce capacitor switching

37.

Which of the following options would not be used to increase the transmission voltages?

a)

Place a distribution capacitor in service

b)

Adjust transformer tap changers

c)

Place a reactor in service

d)

Trip a generator

38.

Many companies utilize different ratings to monitor for transmission facilities, some monitor MW, while others monitor MVA. If you are faced with a line that is carrying 30 MVAR and 40 MW, the conversion to MVA would be which of the following?

a)

5 MVA

b)

35 MVA

c)

50 MVA

d)

70 MVA

39.

What is the time requirement for a PJM member to submit a planned transmission outage for a facility that is expected to be out of service for more than 5 working days?

a)

3 days in advance of the outage

b)

1 week in advance of the outage

c)

1 month in advance of the outage

d)

1 year in advance of the outage

40.

If a 500 kV transmission line is scheduled to be removed from service for a daily maintenance job, what is the minimum notification time to get final approval from the PJM operator?

a)

15 minutes

b)

30 minutes

c)

24 hours

d)

72 hours

41.

What is the outage request submission criteria for a transmission outage to receive the status of “On Time”?

a)

30 minutes

b)

3 business days

c)

1 week

d)

1st day of the month prior to the month of outage

42.

Your outage scheduling group has scheduled a planned outage to start today at 0800. Unfortunately due to weather, the outage will not start until tomorrow at 0700. What must you do in order to update the outage in the eDart application?

a)

Leave the start time unchanged

b)

Enter a new outage ticket for the equipment with the new start time

c)

Request that PJM unlock the ticket in eDart and revise the ticket

d)

Cancel the outage ticket

43.

All of the following information should be submitted with a transmission outage request EXCEPT

a)

Facility

b)

Emergency restoration time

c)

Description of work

d)

Cost of the maintenance work

44.

When it is determined that a transmission outage will impact another LCC area with the PJM footprint, the system operator should coordinate the outage with which of the following?

1. PJM Operators

2. Distribution Operators within their LCC

3. Affected LCC Operators

4. Switchmen of the Affected LCC

a)

1 & 2

b)

1 & 3

c)

3 & 4

d)

2 & 3

45.

What tool is used by PJM operators for providing verbal alerts to PJM Transmission and Generation dispatchers?

a)

Burst Fax Machine

b)

PJMNet

c)

All-Call

d)

eMKT

46.

According to PJM requirements, which of the following is NOT required by PJM in providing adequate and reliable telecommunications?

a)

Exclusive channels

b)

Dispatch radio systems

c)

Satellite phones

d)

Secure networks

47.

When emergency procedures are implemented, the information is disseminated to Members via the All-Call system and which of the following?

a)

eMarket

b)

Individual phone calls to all

c)

Selected PJM web pages

d)

PJM morning report

48.

Which of the following actions does PJM require when communication links with 500 kV station RTUs are lost?

a)

Take the facility out of service

b)

Wait for the communication to be restored

c)

Issue a Communication Failure Alert

d)

Dispatch field personnel to the facility

49.

When SCADA data points are out of service for an extended period of time, data should be updated manually by the operator at least every

a)

10 minutes

b)

20 minutes

c)

30 minutes

d)

60 minutes

50.

Which of the following items would NOT be reported to PJM upon the request for a Reactive Reserve Check (RRC)?

a)

Spinning units’ MVAR reserve

b)

Quick-start units’ MVAR reserve

c)

Spinning units’ MW reserve

d)

Transmission capacitor MVAR reserve

51.

Which of the following PJM eTools is used for PJM members to submit transmission outage requests?

a)

eMKT

b)

eGADS

c)

eDART

d)

eData

52.

Which of the following information would you NOT report on a Reactive Reserve Check?

a)

MVAR reserve on generators that are synchronized

b)

MVAR output of generators that are synchronized

c)

MVAR available on quick-start generators

d)

Unconnected transmission capacitors’ MVAR capability

53.

PJM requires that LCCs that are starting an outage on reportable transmission facilities must obtain PJM approval prior to removing the facility from service. How many minutes prior to the commencement of switching must be provided for PJM to study and give final approval?

a)

15

b)

30

c)

45

d)

60

54.

How many MVAR of reserve would your report to PJM if you were presented with the following information?

a)

195 MVAR

b)

200 MVAR

c)

370 MVAR

d)

570 MVAR

55.

What control mode would an operator utilize during a system restoration event if the major concern was maintaining tie-lines to schedule?

a)

Tie-line Bias

b)

Flat Frequency

c)

Flat Tie-line

d)

Constant Frequency

56.

Which of the following actions must PJM member operators do during severe weather conditions?

a)

Remove reclosing relays schemes from service

b)

Ensure automatic reclosing schemes are activated

c)

Remove all generators loaded below 20% from service

d)

Ensure that underfrequency relays are disabled

57.

According to PJM emergency procedures, if PJM requests a 300 MW load dump, a PJM East Region member company operator is obligated to

a)

Get management approval to dump load

b)

Dump 300 MW of load

c)

Dump load in accordance with the allocation table

d)

Dump 10% of the 300 MW

58.

If a PJM neighbor is experiencing emergency conditions and request PJM to lend assistance by implementing a 5% voltage reduction, PJM will comply with the request provided the neighboring system has

a)

already implemented the same action

b)

dumped firm load

c)

received NERC approval

d)

a signed agreement in place for compensation

59.

According to PJM emergency procedures, what two types of reserves are monitored during a system restoration?

a)

spinning and regulating

b)

primary and secondary

c)

dynamic and regulating

d)

dynamic and spinning

60.

What are the underfrequency relay settings for PJM member companies located in the PJM Eastern region?

a)

59.30 Hz, 58.90 Hz, 58.50 Hz

b)

59.50 Hz, 58.50 Hz, 57.50 Hz

c)

59.00 Hz, 58.00 Hz, 57.00 Hz

d)

59.70 Hz, 59.50 Hz, 59.30 Hz

61.

During restoration, two PJM members preparing to connect their systems should ensure that which of the following are matched?


1. Voltage

2. Frequency

3. Reserves

4. Load

a)

1 & 2

b)

2 & 3

c)

3 & 4

d)

1 & 4

62.

During severe Geomagnetic activity, PJM observes an indication of > 10 amperes at Missouri Avenue faciltiy that is confirmed by a second source. The PJM operator should immediately implement

a)

conservative operation

b)

spinning reserve

c)

Cold Weather alert

d)

market suspension

63.

PJM issues a Cold Weather Alert when the forecasted temperature in any of the Control Zones is expected to be less than or equal to:

a)

0 Degree F

b)

5 Degree F

c)

10 Degree F

d)

32 Degree F

64.

Which of the following facilities would be given a priority in restoring auxiliary power following a PJM system blackout?

a)

A generator that was on-line and tripped but has a ruptured turbine disc

b)

A drum-type oil fired unit that tripped during the event and has no damage

c)

A combustion turbine that is remote and has a 30% dependability rating

d)

A cold fired generator that was off-line, but can be on in <12 hours

65.

What two components make-up Primary Reserve?

a)

Spinning and quick-start

b)

Quick-start and secondary

c)

Spinning and secondary

d)

Quick-start and regulation

66.

Following a system shut-down, which of the following would have the highest priority in the retoration effort?

a)

Load restoration of residential customers

b)

Auxiliary power to a nuclear facility

c)

Company critical loads

d)

Auxiliary power to transmission substation

67.

When PJM issues a Voltage Reduction Alert, which of the following is NOT an appropriate action for a Member dispatcher to take?

a)

Take steps to expedite the reduction, if needed

b)

Advise all station and key personnel

c)

Notify management

d)

Proceed on the basis that a voltage reduction will not be required

68.

What is PJM’s regulation requirement during a system restoration?

a)

1.0% of the forecasted peak

b)

1.1% of the forecasted peak

c)

2.0% of the forecasted peak

d)

2.0% of the current load

69.

Generation is supposed to be disconnected from the system at which of the following frequencies?

a)

57.5 Hz

b)

58.5 Hz

c)

58.9 Hz

d)

59.3 Hz

70.

What is the PJM prescribed frequency bandwidth where frequency should be maintained during restoration situations?

a)

57.5 Hz and 61.5 Hz

b)

59.5 Hz and 61.5 Hz

c)

59.75 Hz and 61.0 Hz

d)

59.9 Hz and 61.1 Hz

71.

All of the following actions would be implemented by Transmission LCCs when PJM issues a heavy load voltage schedule EXCEPT

a)

Place all reactors are in service

b)

Ensure all capacitors are in service, when voltages permit

c)

Request generators to increase MVAR output to maintain voltage schedules

d)

Ensure all generator voltage regulators are in service

72.

If PJM request a 5% voltage reduction, the voltage should be reduced on which of the following?

a)

Distribution System

b)

115 kV System

c)

239 kV System

d)

500 kV System

73.

Due to the data irregularities that may occur during a restoration event, whenever possible, substation equipment status should be verified by who?

a)

Network Apps

b)

Field Personnel

c)

State Estimator

d)

System Operators

74.

PJM monitors DC current flow as an indication of solar magnetic activity on the PJM system. What is the Missouri Avenue threshold used to initiate steps for verification at other parts of the system?

a)

1 ampere

b)

5 amperes

c)

10 amperes

d)

15 amperes

75.

If two islands wish to interconnect during a system restoration event, which of the following must be completed in order to synchronize the two islands?

a)

Loads in the islands must be equal

b)

Tie-lines must be established

c)

Generation capacity must be within 10% between the islands

d)

Phase shifters must be in neutral

76.

During restoration situations, dynamic reserve generator load pick-up factors are defined as which of the following?

a)

Steam capacity – 5%, Combustion Turbine capacity – 15%, and hydro capacity – 25%

b)

Steam capacity – 5%, Combustion Turbine capacity – 10%, and hydro capacity – 15%

c)

Steam capacity – 5%, Combustion Turbine capacity – 25%, and hydro capacity – 15%

d)

Steam capacity – 10%, Combustion Turbine capacity – 15%, and hydro capacity – 25%

77.

What is the typical concern that the system operator should have during restoration when restoring transmission facilities with little or no connected load?

a)

low voltage

b)

high voltage

c)

low frequency

d)

high frequency

78.

What is the spinning reserve requirement for two islands that have interconnected when the individual island spinning requirements were 300 MW and 500 MW prior to the synchronizing of the islands?

a)

200 MW

b)

300 MW

c)

500 MW

d)

800 MW

79.

Which of the following actions would a Transmission Operator implement if PJM issues a Primary Reserve Alert?

a)

Reduce voltage on the distribution system

b)

Defer or cancel equipment maintenance or testing

c)

Reduce power use in their control center facility

d)

Convert generator secondary reserve to primary reserve

80.

If a system event cause a complete PJM system shutdown, what is the first thing that the system operator should do?

a)

Develop restoration plan

b)

Assess system status

c)

Start all quick-start CTs

d)

Restore all critical customers

81.

During restoration, if 500 kV transmission lines is being restored, what are the minimum source requirements for load and generation?

a)

10 MW of load/mile and 15 MW of generation/mile

b)

20 MW of load/mile and 30 MW of generation/mile

c)

25 MW of load/mile and 50 MW of generation/mile

d)

30 MW of load/mile and 50 MW of generation/mile

82.

If two islands want to interconnect during a system restoration, with Island #1 operating at a frequency of 59.5 Hz and Island #2 is operating at a frequency of 60.3 Hz. What should the system operators do in order to prepare for successful synchronization of the islands?

a)

raise load in Island #1

b)

raise generation in Island #2

c)

raise generation in Island #1

d)

reduce load in Island #2

83.

If the rule of thumb for dumping load to increase frequency during system restoration is 6-10% per Hz, how many MW should the operator shed to restore frequency to 60.0 Hz if their current system load is 2000 MW and the current system frequency is 59.0 Hz?

a)

60 to 100

b)

120 to 200

c)

180 to 300

d)

240 to 400

84.

If PJM request a 500 MW manual load dump across the entire PJM system, how many MW would you expect to shed if your company’s allocation is 20%?

a)

20

b)

50

c)

100

d)

500

85.

What would be an appropriate action for a transmission system operator to implement during a PJM issued cold weather alert?

a)

Man all combustion turbines

b)

Man all transmission facilities

c)

Defer or cancel facility maintenance and testing

d)

Open all SF6 circuit breakers

86.

PJM restoration procedures stress the importance of restoring station light and power to substations. This is important for providing AC power to all of the following EXCEPT

a)

Station battery chargers

b)

Communication facilities

c)

SF6 heaters

d)

Power house lighting

87.

If the system operator is restoring load during a restoration event, which of the following is the most desired frequency to have prior to restoring the load?

a)

58.9 Hz

b)

59.5 Hz

c)

60.0 Hz

d)

60.7 Hz

88.

What should the LCC Transmission Operator do if they are informed that one of their transmission lines has lost its relay protection?

a)

Remove line breakers auto-reclosers

b)

Schedule a carrier test ASAP

c)

Monitor the line more closely

d)

Request approval from PJM to remove line from service

89.

According to PJM procedures, who is responsible for coordinating and restoring 500 kV lines during restoration?

a)

The transmission operator who operates the line

b)

The PJM System Operator

c)

The owner of the transmission facility

d)

The owner or operator of the facility

90.

If a company’s system has remained connected to the Interconnection following a system disturbance, who has responsibility for establishing an interchange schedule with the system external to PJM?

a)

PJM RTO

b)

The PJM company the is connected to the external system

c)

The external system

d)

No one since it is during restoration