Which of the following would NOT be an action to take for low voltages?
Increase generator MW output
Remove reactors from the system
Increase generator MVAR output
Place capacitors in service
PJM operates its 500 kV system so that no post-contingency voltage drop will exceed what minimum value?
1%
3%
5%
7%
The PJM system operator finds that a 230 kV transmission line is over its normal limit. How long does the operator have to return the line to within its normal limit?
Immediately
5 minutes
15 minutes
30 minutes
What action can an operator take to increase its system dynamic reactive reserve?
Increase a generator MW output
Remove a capacitor from service
Place a capacitor in service
Take a generator off-line
The first step that an operator should take following a system separation should be
Clear all buses
Assess the system
Place all quick-start units in service
Notify NERC
PJM Transmission Operators are required to provide PJM with four sets of thermal limits for all facilities monitored by PJM. Which of the following is NOT one of the four?
Actual
Normal
Short-term emergency
Load dump
If a transmission facility is found to be loaded above its short-term emergency, how long does the operator have to correct the problem?
5 minutes
10 minutes
15 minutes
30 minutes
If a shunt reactor is placed in service, the expected result would be
An increase in voltage
A decrease in voltage
An increase in spinning reserve
A decrease in spinning reserve
What would be the expected results from the tripping of a 1,000 MW generator outside of the PJM control area, but within the Interconnection?
Frequency would drop, but the PJM ACE would remain unchanged
Frequency would drop and the PJM ACE would also indicate under-generation
Frequency and PJM ACE would remain the same
Frequency would drop and the PJM ACE would indicate 1,000 MW under-generation
When a discrepancy occurs between PJM’s thermal rating and a transmission owner’s thermal rating, which of the following is always used?
PJM’s rating
Transmission owner's rating
The most conservative rating
The average of the two ratings
Since PJM operates to a 5% voltage drop limit on the 500 kV system, which of the following would be considered a violation?
Pre – 530 kV, Post – 515 kV
Pre – 545 kV, Post – 520 kV
Pre – 535 kV, Post – 512 kV
Pre – 536 kV, Post – 507 kV
According to the PJM Transmission Operation manual, 500 kV lines that trip out of service should
Be immediately manually reclosed by the operator
Be manually reclosed by the operator after 30 minutes
Automatically reclose
Automatically initiate a transmission outage ticket via eDART
The PJM system has phase angle regulators at various locations around the system. The phase angle regulators are there to help
Maintain system VAR flow
Increase overall system voltages
Control MW flows
Reduce overall market price
When would PJM issue a Heavy Load Voltage Schedule?
When loads are heavy and bulk power voltage levels are expected to be low
When Virgina Power or NY-ISO is experiencing high loads
When a PJM member system is experiencing a new system peak load
When PJM has projected that they will experience problems in meeting their CPS criteria
PJM operates with different temperature adjusted ratings during the day and night periods. If the weather forecast indicates that the day period temperature will be 48 degrees, what temperature setting should be utilized?
41 degree day
41 degree night
50 degree day
50 degree night
Which temperature range makes up the PJM “Summer Value” temperature sets?
41° to 77° F
50° to 77° F
68° to 86° F
68° to 95° F
Which of the following actions would most likely result in the reduction of a generator’s MVAR output?
Placing a nearby reactor in service
Increase the generator MW output
Placing a nearby capacitor in service
Removing a nearby capacitor from service
If your system configuration was such that you had three parallel line of the same construction, length, and impedance with a normal rating of 160 MVA. Each of the lines currently has a loading of 120 MVA on each line. If one of the three lines were to trip out of service, what would be the expected flow on the remaining two lines?
120
160
180
240
If your system configuration was such that you had three parallel line of the same construction, length, and impedance with a normal rating of 155 MVA and an emergency rating of 170 MVA. Each of the lines currently has a loading of 130 MVA on each line. If one of the three lines were to trip out of service, what limits, if any, would be exceeded?
Normal and Emergency
Normal only
Neither due to the surge impedance loading of the line
Emergency only
What is the first task that an operator should perform following a system disturbance that has caused a complete system shutdown?
Restore all available load
Contact priority customers
Determine system status
Review the restoration plan
PJM utilizes four sets of thermal limits that should be submitted for all of the equipment that they are responsible to monitor. Which of the following is not one of the four limits?
Normal
Long-term emergency
Load dump
Temperature
What impact would a transmission line that is loaded below its surge impedance loading have on system voltage?
Lower the voltage
Increase the voltage
Lower the voltage limits
Increase the voltage limits
Your system had two busses that were connected with a 345 kV line. The voltage at bus A is 349 kV and the voltage at bus B is 343 kV. Which direction would the MVAR flow?
From bus A to bus B
From bus B to bus A
MVAR would not flow
Bus voltage has no influence on MVAR flow
Your system had two busses that were connected with a 345 kV line. The phase angle at bus A is –7o and the phase angle at bus B is 2o. Which direction would the MW flow?
From bus A to bus B
From bus B to bus A
MW would not flow
Phase angle has no influence on MW flow
If your system is equipped with 500 kV capacitors that have automatic switching capability, what would be the expected operation of the capacitor if the voltage were between 545 kV and 550 kV for 1 to 15 minutes?
The capacitor would be connected to the system
The capacitor would be disconnected from the system
There are no 500 kV automatically controlled capacitors
The capacitor should remain unchanged
PJM operates the bulk electric system in order that any single facility failure will not cause any other system facility to exceed which of the following limits?
Actual
Normal
Emergency
Load Dump
Which type of relays protection measures and compares the current entering and the current existing the area of protection?
Impedance relay
Differential relay
Distance relay
Out-of-step relay
What is the voltage drop that PJM controls to for the reactive transfer interfaces?
3%
5%
8%
10%
Under the PJM control criteria, if the system experiences an equipment failure and another transmission facility is loaded beyond its short-term emergency rating, how long does PJM have to correct the problem?
10 minutes
15 minutes
20 minutes
30 minutes
If the problem identified in the previous question was not corrected within the allotted time period, which of the following actions would PJM implement
Shift generation
Dump load
Connect capacitors
Issue a warning
If a 500 kV transmission line is loaded to 300 MW, what would the line be doing with regards to MVAR?
Nothing
Providing MVAR to the system
Absorbing MVAR from the system
Calculating
If the Eastern Interconnection experiences a severe system event that causes the frequency to decline to 58.7 Hz in the PJM East Region. What percentage of load should be shed from the operation of under-frequency relay protection?
5%
10%
20%
25%
If a shunt reactor were connected to the system, what would be the expected system response?
Voltage would increase
Voltage would decrease
MW flow would increase
MW flow would decrease
If the frequency indication identifies a drop in system frequency and the PJM ACE remains unchanged, what would be the expected system event that occurred?
PJM lost a block of load
PJM lost a generator
A generator was lost outside of PJM
PJM placed a 500 kV capacitor in service
If your system was experiencing low voltages, which of the following actions would you implement to correct the problem?
Connect a reactor to the system
Connect a capacitor to the system
Increase interchange across your system
Disconnect a capacitor from the system
When PJM is monitoring the 500 kV system for volt drop violations, they control the system to ensure that a voltage drop will not exceed 5%. What is the reason for operating under this criteria?
Maintain economics
Prevent voltage collapse
Minimize generator MVAR support
Reduce capacitor switching
Which of the following options would not be used to increase the transmission voltages?
Place a distribution capacitor in service
Adjust transformer tap changers
Place a reactor in service
Trip a generator
Many companies utilize different ratings to monitor for transmission facilities, some monitor MW, while others monitor MVA. If you are faced with a line that is carrying 30 MVAR and 40 MW, the conversion to MVA would be which of the following?
5 MVA
35 MVA
50 MVA
70 MVA
What is the time requirement for a PJM member to submit a planned transmission outage for a facility that is expected to be out of service for more than 5 working days?
3 days in advance of the outage
1 week in advance of the outage
1 month in advance of the outage
1 year in advance of the outage
If a 500 kV transmission line is scheduled to be removed from service for a daily maintenance job, what is the minimum notification time to get final approval from the PJM operator?
15 minutes
30 minutes
24 hours
72 hours
What is the outage request submission criteria for a transmission outage to receive the status of “On Time”?
30 minutes
3 business days
1 week
1st day of the month prior to the month of outage
Your outage scheduling group has scheduled a planned outage to start today at 0800. Unfortunately due to weather, the outage will not start until tomorrow at 0700. What must you do in order to update the outage in the eDart application?
Leave the start time unchanged
Enter a new outage ticket for the equipment with the new start time
Request that PJM unlock the ticket in eDart and revise the ticket
Cancel the outage ticket
All of the following information should be submitted with a transmission outage request EXCEPT
Facility
Emergency restoration time
Description of work
Cost of the maintenance work
When it is determined that a transmission outage will impact another LCC area with the PJM footprint, the system operator should coordinate the outage with which of the following?
1. PJM Operators
2. Distribution Operators within their LCC
3. Affected LCC Operators
4. Switchmen of the Affected LCC
1 & 2
1 & 3
3 & 4
2 & 3
What tool is used by PJM operators for providing verbal alerts to PJM Transmission and Generation dispatchers?
Burst Fax Machine
PJMNet
All-Call
eMKT
According to PJM requirements, which of the following is NOT required by PJM in providing adequate and reliable telecommunications?
Exclusive channels
Dispatch radio systems
Satellite phones
Secure networks
When emergency procedures are implemented, the information is disseminated to Members via the All-Call system and which of the following?
eMarket
Individual phone calls to all
Selected PJM web pages
PJM morning report
Which of the following actions does PJM require when communication links with 500 kV station RTUs are lost?
Take the facility out of service
Wait for the communication to be restored
Issue a Communication Failure Alert
Dispatch field personnel to the facility
When SCADA data points are out of service for an extended period of time, data should be updated manually by the operator at least every
10 minutes
20 minutes
30 minutes
60 minutes
Which of the following items would NOT be reported to PJM upon the request for a Reactive Reserve Check (RRC)?
Spinning units’ MVAR reserve
Quick-start units’ MVAR reserve
Spinning units’ MW reserve
Transmission capacitor MVAR reserve
Which of the following PJM eTools is used for PJM members to submit transmission outage requests?
eMKT
eGADS
eDART
eData
Which of the following information would you NOT report on a Reactive Reserve Check?
MVAR reserve on generators that are synchronized
MVAR output of generators that are synchronized
MVAR available on quick-start generators
Unconnected transmission capacitors’ MVAR capability
PJM requires that LCCs that are starting an outage on reportable transmission facilities must obtain PJM approval prior to removing the facility from service. How many minutes prior to the commencement of switching must be provided for PJM to study and give final approval?
15
30
45
60
How many MVAR of reserve would your report to PJM if you were presented with the following information?
195 MVAR
200 MVAR
370 MVAR
570 MVAR
What control mode would an operator utilize during a system restoration event if the major concern was maintaining tie-lines to schedule?
Tie-line Bias
Flat Frequency
Flat Tie-line
Constant Frequency
Which of the following actions must PJM member operators do during severe weather conditions?
Remove reclosing relays schemes from service
Ensure automatic reclosing schemes are activated
Remove all generators loaded below 20% from service
Ensure that underfrequency relays are disabled
According to PJM emergency procedures, if PJM requests a 300 MW load dump, a PJM East Region member company operator is obligated to
Get management approval to dump load
Dump 300 MW of load
Dump load in accordance with the allocation table
Dump 10% of the 300 MW
If a PJM neighbor is experiencing emergency conditions and request PJM to lend assistance by implementing a 5% voltage reduction, PJM will comply with the request provided the neighboring system has
already implemented the same action
dumped firm load
received NERC approval
a signed agreement in place for compensation
According to PJM emergency procedures, what two types of reserves are monitored during a system restoration?
spinning and regulating
primary and secondary
dynamic and regulating
dynamic and spinning
What are the underfrequency relay settings for PJM member companies located in the PJM Eastern region?
59.30 Hz, 58.90 Hz, 58.50 Hz
59.50 Hz, 58.50 Hz, 57.50 Hz
59.00 Hz, 58.00 Hz, 57.00 Hz
59.70 Hz, 59.50 Hz, 59.30 Hz
During restoration, two PJM members preparing to connect their systems should ensure that which of the following are matched?
1. Voltage
2. Frequency
3. Reserves
4. Load
1 & 2
2 & 3
3 & 4
1 & 4
During severe Geomagnetic activity, PJM observes an indication of > 10 amperes at Missouri Avenue faciltiy that is confirmed by a second source. The PJM operator should immediately implement
conservative operation
spinning reserve
Cold Weather alert
market suspension
PJM issues a Cold Weather Alert when the forecasted temperature in any of the Control Zones is expected to be less than or equal to:
0 Degree F
5 Degree F
10 Degree F
32 Degree F
Which of the following facilities would be given a priority in restoring auxiliary power following a PJM system blackout?
A generator that was on-line and tripped but has a ruptured turbine disc
A drum-type oil fired unit that tripped during the event and has no damage
A combustion turbine that is remote and has a 30% dependability rating
A cold fired generator that was off-line, but can be on in <12 hours
What two components make-up Primary Reserve?
Spinning and quick-start
Quick-start and secondary
Spinning and secondary
Quick-start and regulation
Following a system shut-down, which of the following would have the highest priority in the retoration effort?
Load restoration of residential customers
Auxiliary power to a nuclear facility
Company critical loads
Auxiliary power to transmission substation
When PJM issues a Voltage Reduction Alert, which of the following is NOT an appropriate action for a Member dispatcher to take?
Take steps to expedite the reduction, if needed
Advise all station and key personnel
Notify management
Proceed on the basis that a voltage reduction will not be required
What is PJM’s regulation requirement during a system restoration?
1.0% of the forecasted peak
1.1% of the forecasted peak
2.0% of the forecasted peak
2.0% of the current load
Generation is supposed to be disconnected from the system at which of the following frequencies?
57.5 Hz
58.5 Hz
58.9 Hz
59.3 Hz
What is the PJM prescribed frequency bandwidth where frequency should be maintained during restoration situations?
57.5 Hz and 61.5 Hz
59.5 Hz and 61.5 Hz
59.75 Hz and 61.0 Hz
59.9 Hz and 61.1 Hz
All of the following actions would be implemented by Transmission LCCs when PJM issues a heavy load voltage schedule EXCEPT
Place all reactors are in service
Ensure all capacitors are in service, when voltages permit
Request generators to increase MVAR output to maintain voltage schedules
Ensure all generator voltage regulators are in service
If PJM request a 5% voltage reduction, the voltage should be reduced on which of the following?
Distribution System
115 kV System
239 kV System
500 kV System
Due to the data irregularities that may occur during a restoration event, whenever possible, substation equipment status should be verified by who?
Network Apps
Field Personnel
State Estimator
System Operators
PJM monitors DC current flow as an indication of solar magnetic activity on the PJM system. What is the Missouri Avenue threshold used to initiate steps for verification at other parts of the system?
1 ampere
5 amperes
10 amperes
15 amperes
If two islands wish to interconnect during a system restoration event, which of the following must be completed in order to synchronize the two islands?
Loads in the islands must be equal
Tie-lines must be established
Generation capacity must be within 10% between the islands
Phase shifters must be in neutral
During restoration situations, dynamic reserve generator load pick-up factors are defined as which of the following?
Steam capacity – 5%, Combustion Turbine capacity – 15%, and hydro capacity – 25%
Steam capacity – 5%, Combustion Turbine capacity – 10%, and hydro capacity – 15%
Steam capacity – 5%, Combustion Turbine capacity – 25%, and hydro capacity – 15%
Steam capacity – 10%, Combustion Turbine capacity – 15%, and hydro capacity – 25%
What is the typical concern that the system operator should have during restoration when restoring transmission facilities with little or no connected load?
low voltage
high voltage
low frequency
high frequency
What is the spinning reserve requirement for two islands that have interconnected when the individual island spinning requirements were 300 MW and 500 MW prior to the synchronizing of the islands?
200 MW
300 MW
500 MW
800 MW
Which of the following actions would a Transmission Operator implement if PJM issues a Primary Reserve Alert?
Reduce voltage on the distribution system
Defer or cancel equipment maintenance or testing
Reduce power use in their control center facility
Convert generator secondary reserve to primary reserve
If a system event cause a complete PJM system shutdown, what is the first thing that the system operator should do?
Develop restoration plan
Assess system status
Start all quick-start CTs
Restore all critical customers
During restoration, if 500 kV transmission lines is being restored, what are the minimum source requirements for load and generation?
10 MW of load/mile and 15 MW of generation/mile
20 MW of load/mile and 30 MW of generation/mile
25 MW of load/mile and 50 MW of generation/mile
30 MW of load/mile and 50 MW of generation/mile
If two islands want to interconnect during a system restoration, with Island #1 operating at a frequency of 59.5 Hz and Island #2 is operating at a frequency of 60.3 Hz. What should the system operators do in order to prepare for successful synchronization of the islands?
raise load in Island #1
raise generation in Island #2
raise generation in Island #1
reduce load in Island #2
If the rule of thumb for dumping load to increase frequency during system restoration is 6-10% per Hz, how many MW should the operator shed to restore frequency to 60.0 Hz if their current system load is 2000 MW and the current system frequency is 59.0 Hz?
60 to 100
120 to 200
180 to 300
240 to 400
If PJM request a 500 MW manual load dump across the entire PJM system, how many MW would you expect to shed if your company’s allocation is 20%?
20
50
100
500
What would be an appropriate action for a transmission system operator to implement during a PJM issued cold weather alert?
Man all combustion turbines
Man all transmission facilities
Defer or cancel facility maintenance and testing
Open all SF6 circuit breakers
PJM restoration procedures stress the importance of restoring station light and power to substations. This is important for providing AC power to all of the following EXCEPT
Station battery chargers
Communication facilities
SF6 heaters
Power house lighting
If the system operator is restoring load during a restoration event, which of the following is the most desired frequency to have prior to restoring the load?
58.9 Hz
59.5 Hz
60.0 Hz
60.7 Hz
What should the LCC Transmission Operator do if they are informed that one of their transmission lines has lost its relay protection?
Remove line breakers auto-reclosers
Schedule a carrier test ASAP
Monitor the line more closely
Request approval from PJM to remove line from service
According to PJM procedures, who is responsible for coordinating and restoring 500 kV lines during restoration?
The transmission operator who operates the line
The PJM System Operator
The owner of the transmission facility
The owner or operator of the facility
If a company’s system has remained connected to the Interconnection following a system disturbance, who has responsibility for establishing an interchange schedule with the system external to PJM?
PJM RTO
The PJM company the is connected to the external system
The external system
No one since it is during restoration