Chapter 2: Description of Discontinuities

Total questions: 20

Worksheet time: 11mins

Name
Class
Date
1.

The followings are the types of discontinuities, EXCEPT:

a)

Joint

b)

Cleavage

c)

Fault

d)

Rock mass

2.

Following statement are referring to:

"Repetitive layering in metamorphic rocks.

Each layer may be as thin as a sheet of paper, or over a meter in thickness.

Caused by shearing forces (pressures pushing different sections of the rock in different directions), or differential pressure (higher pressure from one direction than in others)."

a)

Schistosity

b)

Fault

c)

Foliation

d)

Cleavage

3.

Fracture or crack are:

a)

Divides the rock into two or more pieces

b)

Any separation in a geologic formation

c)

Caused by stress exceeding the rock strength, causing the rock to lose cohesion along its weakest plane

d)

ALL of the above.

4.

What is borehole?

a)

The state of rock cores recovered is largely a function of the drilling method, and the amount of core employed by the driller during a core run and extraction of core from the core barrel

b)

An excavation of ground in order to study or sample the composition and structure of the subsurface

c)

A deep vertical hole of small diameter bored into the earth to ascertain the nature of the underlying strata or to obtain water.

d)

All of the above.

5.

The following was the purposes of drilling borehole, EXCEPT:

a)

Monitoring

b)

Drilling for water and water abstraction

c)

Access to a tunnel or underground structure, also as an escape route

d)

Mineral exploration, including sand and gravel

6.

Trial pit usually safely excavated to a depth of about 1.2m using hand tools assuming the sides of the trial pit are stable.

a)

True

b)

False

7.

Weathering is a process of breakdown of rocks at the Earth’s surface, by physical, chemical and biological activity.

a)

True

b)

False

8.

Many data relating to discontinuities can be obtained from photographs of exposure.


Photographs may be taken looking by all of the following EXCEPT:

a)

Vertically from the air.

b)

Direct measurement on the ground.

c)

Horizontally at the rock mass from the ground.

d)

Obliquely, down at the outcrop.

9.

Measurements of discontinuity survey should be taken over distances of about 10 m and to ensure the survey is representative, the measurements should be continuous over that distance.

a)

True

b)

False

10.

What type of discontinuities is this?

a)

Fracture

b)

Cleavage

c)

Foliation

d)

Fault

11.

Name this..

a)

Normal fault

b)

Reverse fault

c)

Strike fault

d)

Fault plane

12.

Identify the engineering applications for rock mass classification.

a)

Foundations

b)

Tunnels

c)

Slopes

d)

All of the answer are correct

13.

What is the objectives of rock mass classification?

a)

As a ventilation of a tunnel or underground structure

b)

Relate the experience of rock conditions at one site to the others.

c)

Control the engineering performance of a rock mass and not the rock material

14.

Name this method of drilling borehole.

a)

Hand auger

b)

Shell & auger rig

c)

Air flush drilling

d)

Small scale rotary drilling

15.

Shafts construction can be temporary ONLY.

a)

True

b)

False

16.

What is the difference between a joint and a fracture?

a)

Joints have no displacement across the fault plane, fractures do.

b)

}Formed through failure of rock masses in tension, in shear or through some combination of both.

c)

No different at all.

17.

What is a strike slip fault?

a)

the motion is perpendicular to the strike line of the fault plane

b)

the motion is parallel to the strike line of the fault plane.

18.

All the followings are the records of borehole EXCEPT

a)

Geotechnical data

b)

Samples

c)

In situ testing

d)

Weathering

19.

What is core recovery state?

a)

A deep vertical hole of small diameter bored into the earth to ascertain the nature of the underlying strata or to obtain water.

b)

largely a function of the drilling method, and the amount of core employed by the driller during a core run and extraction of core from the core barrel

c)

An excavation of ground in order to study or sample the composition and structure of the subsurface.

20.

Solid core in core recovery is

a)

> 0.15 m in width

b)

< 0.15 m in width

c)

> 0.1 m in length

d)

< 0.1 m in length