wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

MOS CALIBRATION - QUIZ

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

IN WHAT PHASE WE ACHIEVE "KPI EXCELLENCE" FOR MOS CALIBRATION ASSESSMENT?

a)

0

b)

3

c)

2

d)

4

2.

WHICH BELOW SUB PILLAR IS BELONGS TO OPERATIONAL STABILITY?

a)

5S, VISUAL MANAGEMENT, KAIZEN ACTIVITY

b)

MATERIAL PULL, NPI, QCO

c)

NPI, QCO, ERROR PROOFING

d)

AUTONOMOUS MAINTENANCE, NPI, PULL SYSTEM

3.

3. WHICH STATEMENT BELOW IS TRUE FOR NUMBER 3 OF 8 STEP PROBLEM SOLVING?

a)

SET THE TARGET

b)

DEVELOP COUNTER MEASURE

c)

CLARIFY THE PROBLEM

d)

SEVEN WASTE

4.

BELOW ARE SUB PILLAR UNDER KAIZEN MINDSET?

a)

NPI, KAIZEN ACTIVITY, VISUAL MANAGEMENT

b)

KAIZEN ACTIVITY, KAIZEN MINDSET, PERFORMANCE METRIC

c)

ERROR PROOFING, QMS, SPS

d)

JIT, BIQ, POLICY DEPLOYMENT

5.

WHICH COUNTRY OLYMPIC 2021 HELD?

a)

MUMBAI, INDIA

b)

COLOMBO, SRILANKA

c)

TOKYO, JAPAN

d)

JAKARTA, INDONESIA

6.

WHAT IS THE ACTIVITY FROM MUTUAL TRUST AND RESPECT THAT ALIGN WITH KAIZEN MINDSET?

a)

GOT TALENT COMPETITION

b)

TLGL FLIPCHART

c)

SUGGESTION CULTURE

d)

PROBLEM SOLVING

7.

HOW MUCH PILLAR DO WE HAVE AT MOS CALIBRATION ?

a)

5

b)

8

c)

6

d)

4

8.

WHAT MAP WE CREATE TO UNDERSTAND OUR END TO END PROCESS WITH BIRD EYE POINT OF VIEW?

a)

PROCESS MAPPING

b)

M AND I MAPPING

c)

VSM MAPPING

d)

SWIMLANE MAPPING

9.

M AND I FLOW, QSM, GREEN BOARD, ARE TOOLS THAT ARE MUCH MENTION IN WHICH PILLAR?

a)

BIQ

b)

PD

c)

JIT

d)

OS

10.

WHICH DOCUMENT WERE COMPULSARY REFER TO UNDERSTAND OUR PROJECT/PILLAR CONTRIBUTION INTO PLANT KPI STRUCTURALLY?

a)

A3

b)

PO MATRIX

c)

GLOBAL IMPACT

d)

SWOT