wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

IT QUIZ

Total questions: 15

Worksheet time: 5mins

Name
Class
Date
1.

Which of these is not an Agile framework? (Aurélien)

a)

Scrum

b)

Kubernetes

c)

Kanban

d)

SAFe

2.

Which tool is used by Business Analyst for the business process modeling? (Aurélien)

a)

Visio

b)

Confluence

c)

Jira

d)

UML

3.

Which of these is not a responsibility of the Product Owner? (Aurélien)

a)

Prioritizing of the backlog

b)

Representating of stakeholders’ needs

c)

Removing impediments

d)

Maximizing of the product’s value

4.

True or false. A business analyst often has a degree in business administration. (Julie G.)

a)

True

b)

False

5.

UML is: (Julie G.)

a)

A modeling language in the field of software engineering that is intended to provide a standard way to visualize the design of a system

b)

A framework for developing, delivering, and sustaining products in a complex environment

c)

A development method

d)

A graphical representation for specifying business processes in a business process model.

6.

Prince 2 is: (Julie G.)

a)

A development method

b)

A framework for developing, delivering, and sustaining products in a complex environment

c)

A structured project management method and practitioner certification programme

d)

Bug-tracking, issue-tracking and project-management software application

7.

What is not an example of an ERP system? (Julie D.)

a)

SAP

b)

Objective

c)

Microsoft Dynamics

d)

ODOO

8.

Objective is an example of a MES system, but what is that? (Julie D.)

a)

A Microsoft Education System

b)

A Manufacturing Execution System

c)

A Monitoring Entity System

9.

What is the focus/time/objective of a program manager (Marina)

a)

Context- short term – Benefits

b)

Content- short term – specific/product

c)

Context - long term – Benefits

d)

Program- Middle term- Hybrid

10.

Which one of the following is not a characteristic of a Project ? (Marina)

a)

Temporary

b)

Risk

c)

Uniqueness

d)

Familiarity

11.

When can a sprint be canceled? (Sabrine)

a)

The Sprint items are no longer needed

b)

Sprint can never be cancelled

c)

When Development is unable to complete the work

d)

Whenever the Product Owner says

12.

Who is responsible to measure the Project’s performance? (Sabrine)

a)

The Scrum Master

b)

The Delivery Manager

c)

The Product Owner

d)

The Development Team

13.

What are the tasks and responsibilities of a Project Manager? Select more than one. (Sabrine)

a)

Defining the scope

b)

Resource planning

c)

Cost and budget estimation

d)

Risk analysis

14.

Which one of these skillsets would NOT necessarily be seen as experiences on the CV of a Business Analyst? (Lot)

a)

Change management with exposure to Business Process Re-engineering.

b)

Dry Prototyping in an Agile or DevOps environment.

c)

Object Oriented develpment with Java or C#

d)

Creating data models with either Visio or UML.

15.

Which of the following are aspects of project performance that need to be managed according to PRINCE2? (Lot)

a)

Time, Costs, Quality, Scope, Risks, Benefits

b)

Scope, Tolerance, Stakeholder, Controlling, Monitoring

c)

Planning, reviewing, Tracking, Reporting

d)

Risks, Costs, Quality, Benefits, Soft skills