Total questions: 17

Worksheet time: 9mins

Name
Class
Date
1.

During Design and development changes, The Organization shall retain documented information on:

a)

design and development changes

b)

the authorization of the changes

c)

the actions taken to prevent adverse impacts

d)

All of the above

2.

During Project execution, identified risks and response plan are required to be documented using the Tool:

a)

Gensuite

b)

Unifier

c)

NCM

d)

MTA

3.

As per Hydro Risk Management Procedure, the Response Plan strategy for Risks may consist of the following options:

a)

Avoid, Transfer, Mitigate

b)

Plan, Check, Act

c)

Analyze, Improve, Control

d)

Enhance, Share, Control

4.

ISO 9001:2015 International Standard (QMS) employs the process approach, which incorporates the Plan-Do-Check-Act (PDCA) cycle and risk-based thinking

a)

True

b)

False

5.

Cost of Quality Management Instruction aims to drive compliance to

a)

Vouchering Policy

b)

Income tax Policy

c)

ASC 606 Revenue Recognition Policy

d)

MOB Policy

6.

What is Rule# 10 in GE Hydro Golden Rules Policy HG-LS-2-B-P-001

a)

Zero tolerance for delay

b)

Right first time -Every time

c)

No Design Freeze without Supply Chain involvement

d)

Specific monthly Risk and Opportunity review

7.

Which of the following KPI is not part of Golden Rule #5 – Monthly project reviews and weekly project deliverables reviews?

a)

Engineering drawing OTD

b)

Voice of Customer

c)

Sourcing PO OTD

d)

Equipment delivery to site OTD

8.

What HIN Monthly objective of CoNQ ( (Excl. Warranty, LD's) for 2021 ?

a)

67K$

b)

35 K$

c)

97 K$

d)

none of the above

9.

Which of the following is not part of 11 elements of Cost of Quality ?

a)

Field Modifications

b)

Engineering Redesign

c)

Premium Transportation

d)

None of the above

10.

Which major 5 ‘’M’’ to be considered during Fish bone diagram of RCA for Cause Identification?

a)

Man, Machine, Method, Material, Measurement

b)

Make, Motion, Machine, Method, Material

c)

Major, Magic, Method, Material, Motion

d)

None of the above

11.

Action taken to eliminate the root cause of Nonconformity to prevent re-occurrence is called:

a)

Correction

b)

Correction Action

c)

Firming

d)

Containment Action

12.

Where can You find Standards like ASME, ISO, ASTM, IEEE, DIN etc in GE Hydro?

a)

HMS

b)

TRS

c)

Gensuite

d)

NCM

13.

Customers answering 5 rating are………as per Hydro Voice of Customer Procedure. (VoC survey scoring range of 0-10)

a)

Promoter

b)

Detractor

c)

Neutral

d)

None of the above

14.

Where can You find Cost of Quality Instruction HG-LS-2-Q-I-021 ?

a)

HMS

b)

TRS

c)

Gensuite

d)

NCM Database

15.

As per RE Quality Policy- We succeed by ……………………. our employees to share, learn and work together as ONE team

a)

telling

b)

coaching

c)

empowering

d)

pushing

16.

Which process is in place to insure the full recovery of the costs incurred by GE due to supplier non conformances?

a)

Cost of Non Quality

b)

Vendor Rating

c)

Vendor Bill back

d)

Non conformity Management

17.

Often when you are interviewing your auditee, he/she might say/show something that you have to record at the time. This is called :

a)

Non-conformance

b)

Audit Trail

c)

Audit log

d)

None of the above