The _ is the Law institutionalizing the Architecture profession in the Philippines.
PD 1096
RA 8266
RA 9266
RA 7276
The _ can order changes in the construction on technical difficulties.
owner
architect
consultant
contractor
For Building Administration projects, the Architect is compensated on the basis of:
% of Cons. Cost
MDPE
Salary
Fixed Fee
Building Administrators are compensated based on:
% of Const. Cost
% of Gross monthly rentals
Lump Sum
% of Income
Substantial completion shall mean the value of the work completed not less than _ .
100%
98%
90%
95%
The _ is the penalty for every day of delay in the contract time.
Fine
Liquidated Damages
Surcharge
Interest Payment
The _ is the penalty for every day of delay in any payment due.
Fine
Liquidated Damages
Surcharge
Interest Cost
The _ is the payment for services rendered.
Account
Wage
Remuneration
Check
The _ are printed documents stipulating the procedural & administrative aspects of the contract.
Specification
Memo of Agreement
General Conditions
Contract
The Architect releases the _ 365 days after the acceptance of the project.
Retention fee
Guarantee bond
Liability
Contract
Which of the following is not considered in the assessment of building permit fees?
Lot area
occupancy/building use
floor area
height
How many years can a suspended license be reinstated under the new Architecture Law?
1 year
2 years
3 years
4 years
Within what period of time can a contractor after giving due notice to the owner/architect suspend work or terminate a contract?
10 days
15 days
30 days
60 days
For planning projects, the Civil works is compensated on the basis of:
% of Const. cost
MDPE
Cost per Hectare
Fixed Fee
The _ are legal documents defining the relationship of the contractor and the owner.
Specifications
Memo of Agreement
General Conditions
Contract
Payment for Design Services must be accomplished within _.
Immediately
7 days
15 days
20 days
The Architect releases the _ 90 days after the acceptance of the project.
Retention fee
Guarantee bond
Surety
Contract
The Contractor must request for drawings and construction materials _ days before its actual need:
Immediately
7 days
10 days
15 days
IMMEDIATELY means how many days to comply?
1 days
3 days
5 days
10 days
When Drawing and Text arises the _ prevails:
Text
Drawings
Gen.Conditions
Contract
The Government can order a work stoppage on public construction projects for a maximum of _ days.
30 days
60 days
90 days
120 days
The _ created the Professional Regulation Commission (PRC) in the Philippines.
BP 223
PD 233
PD 232
PD 223
The _ is required by the Bureau of Fire for Design of Buildings.
Fire Safety Inspection Certificate
Fire Safety Evaluation Certificate
Fire Safety Report
None of the above
The _ is required by the Bureau of Fire for Business Permits for Existing Buildings.
Fire Safety Inspection Certificate
Fire Safety Evaluation Certificate
Fire Safety Report
None of the above
Temporary Facilities are paid for by the _ .
owner
architect
project manager
contractor
Under RA 9514, automatic sprinkler system shall be provided in buildings with heights over:
10 m.
15 m.
25 m.
30 m.
All Interior Lots must have a minimum _ % open spaces?
5%
10%
20%
50%
All Corner Lots must have a minimum _ % open spaces?
5%
10%
20%
50%
All Inside Lots must have a minimum _ % open spaces?
5%
10%
20%
50%
All of the following are part of the scope of the full-time supervision service except for:
Quality control
Evaluation of construction work
Cost and time control
Filing of documents
SPP Document 205 contains the standards for:
Post-construction services
Specialized allied services
Post-design services
Regular design services
The construction management service is covered by which SPP Document?
SPP 202
SPP 204a
SPP 204b
SPP 205
The orderly arrangement within a piece of land on which vertical structures such as buildings, monuments and the like, as well as horizontal developments such as rights-of-way, open spaces, and activity spaces are to be proposed
Site planning
Physical planning
Comprehensive planning
Environmental planning
In design-build services where the architect guarantees the project construction cost, the cost is guaranteed to not exceed how much of the estimated project construction cost?
5%
10%
15%
20%
The intellectual property rights retained by an architect over any architectural documents/work that he/she prepares unless there is a written stipulation to the contrary.
Copyright
Ownership
Authorship
Property
The UAP can revoke any Professional License for cause anytime.
TRUE
FALSE
Interest payment of 2% per year is assessed on all accounts due.
TRUE
FALSE
Cathedrals are not exempted from the payment of building permit fees.
TRUE
FALSE
All Architects are qualified to teach in an academic institution for Architecture.
TRUE
FALSE
The Contractor is responsible for the payment of Building Permit Fees.
TRUE
FALSE
Which UAP-IAPOA SPP document deals with pre-design services?
201
203
202
204-a
Which section of RA 9266 states that a program of continuing professional development shall be maintained?
Section 27
Section 18
Section 28
Section 30
Which is filed every April 15?
Professional Tax Receipt
IAPOA
PRC Renewal
Income Tax Return
If an architect registers for sole proprietorship, which agency is he required to register to?
SEC
DTI
DOLE
DPWH
TCT means _?
Technical Certificate of Title
Transfer Certificate of Title
True Certificate of Title
Temporary Certificate of Title