1.

What type of control chart can be used to plot “number of defects in the output of a process for making a machine part” data?

a)

s-chart

b)

u-chart

c)

c-chart

d)

p-chart

2.

In India, the use of Statistical Quality Control started by the efforts of 

a)

Prof. VSP Rao

b)

Dr. W.A. Shewhart

c)

Prof. P.C. Mahalanobis

d)

None of the above

3.

Design for Disassembly (DFD) is;

a)

process that allows for the easy recovery of products, parts and materials.

b)

process that allows for the easy passage of materials

c)

process that allows for the easy disposal of materials

d)

None of the above

4.

Scenario Planning is also known as?

a)

Synergy Planning

b)

Business Level Planning

c)

Ad hoc Planning

d)

contingency planning

5.

What time is not related to PERT analysis?

a)

Optimistic time

b)

Pessimistic time

c)

Most likely time

d)

Least likely time

6.

Critical activities have what kind of float?

a)

Zero float

b)

Negative float

c)

Minimum float

d)

Maximum float

7.

Bills of Materials is;

a)

A list of Quantities of components, ingredients, and material required to produce a product

b)

The list of materials ordered

c)

The list of Quantities of components, ingredients, and material required along the quality specification

d)

none of the above

8.

The MRP system is more helpful for;

a)

Dependent demand scenario

b)

independent demand scenario

c)

realistic demand scanario

d)

stochastic demand scenario

9.

Inventory carrying cost includes;

a)

cost of insurance and taxes

b)

Cost of shortages

c)

Set up cost

d)

Cost of ordering

10.

Reorder point = ___ + ___

a)

Reorder point, lead time demand

b)

lead time

c)

Forecasted daily unit sale

d)

Lead time demand, safety stock

11.

Which of the following is a principle of TQM?

a)

Internal customer focus only

b)

External customer focus only

c)

Product-centered

d)

Process-centered

12.

Quality circle is;

a)

Group of employees who meet regularly to discuss ways to increase quality

b)

Group of people who meet regularly to discuss ways to plan some activity

c)

Group of people who meet regularly to discuss ways to finalize some quality task

d)

None of the above

13.

Indian equivalent of ISO can be;

a)

ISI by BIS

b)

ISI by FSSAI

c)

ISI by DMI

d)

ISI by MNS

14.

ISO 14001:2015 is;

a)

Most recent version of ISO for EMS

b)

Popular EMS emasure

c)

Older EMS standard

d)

None of the above

15.

Calculation for Crashing of Project is done for

a)

Critical Path

b)

Shortest Path 

c)

Normal Path

d)

Abnormal path

16.

Which maintenance method utilizes the DMAIC process?

a)

Lean maintenance

b)

Computer aided maintenance

c)

Preventive maintenance

d)

Six sigma maintenance

17.

The process of dealing with production orders to initiate operations under the production planning and control starts with

a)

Estimating

b)

Dispatching

c)

Scheduling

d)

Routing

18.

When would a company incorporate a capacity cushion?

a)

when demand is uncertain

b)

when the company has very standard products

c)

when the company sales are declining

d)

when demand is certain

19.

Distribution resource planning (DRP) is:

a)

a transportation plan to ship materials to warehouses.

b)

a shipping plan from a central warehouse to retail warehouses.

c)

material requirements planning with a feedback loop from distribution centers.

d)

a time-phased stock replenishment plan for all levels of a distribution network.

20.

JIT does not believe in;

a)

Quality

b)

supplier relations

c)

Overproduction

d)

All of the above

21.

What type of control chart can be used to plot “number of defects in the output of a process for making a machine part” data?

a)

s-chart

b)

u-chart

c)

c-chart

d)

p-chart

22.

The transition from economies of scale to diseconomies of scale:

a)

is more likely to occur in a service operation

b)

is more likely to occur in a manufacturing operation

c)

is more likely to occur when utilization is low

d)

contains the point at which average unit costs are at their lowest

23.

Which of the following does not generate pressure to decrease inventories?

a)

taxes and insurance

b)

inventory holding costs

c)

ordering costs

d)

storage and handling costs

24.

The principle of postponement is employed by a producer using a(n):

a)

make-to-stock strategy

b)

assemble-to-order strategy

c)

make-to-order strategy

d)

engineer-to-order strategy

25.

Responsive supply chain is suitable for

a)

High end auto parts

b)

Toilet soap

c)

Calculator

d)

Watch

26.

Maintenance is tougher in;

a)

Continuous flow

b)

batch flow

c)

Jumbled flow

d)

intermittent flow

27.

Which layout is suitable, when efficiency is the

a)

product

b)

process

c)

group technology

d)

Cellular

28.

which facility layout best suits the mass production scenario?

a)

Process

b)

Product

c)

Cellular

d)

Fixed Position

29.

Gantt chart is used as;

a)

a planning tool

b)

scheduling tool

c)

control mechanism

d)

none of the above

30.

Critical path is

a)

the path with longest duration

b)

the path with shortest duration

c)

path where there is no slack

d)

path with maximum float

31.

Describe in 5o words your overall learning from the course operations management?

4 lines
32.

Three things your liked about the course...

4 lines
33.

Three things that you disliked in the course...

4 lines
34.

Three suggestions for improvement in course delivery for future.

4 lines
35.

Honestly rate your faculty without any BIAS or FEAR for future improvement on the scale of 1-10, where 1 is Poor and 10 is Excellent.

4 lines