Font size
WorksheetsHOA, TOA and PROFPRAC
Total questions: 83
Worksheet time: 42mins
Which principle of design refers to a line, plane or volume of reference to which other elements in a composition can relate?
Axis
Symmetry
Heirarchy
Datum
Which term means “putting together” or the organization of the architectural elements using the principles ofdesign?
Composition
Datum
Symmetry
Hue
Which term refers to a unified configuration, pattern or field of specific properties that cannot be derived from the summation of the component parts?
Axis
Composition
Datum
Gestalt
Which organization of spaces is based on proximity or the sharing of a common visual trait or relationship
Radial
Centralized
Clustered
Linear
Which of the following is NOT a responsibility of an architect to colleagues and subordinates?
He shall strive to improve the environment, life and habitat.
He shall not maliciously criticize other architects or architects’ works.
He shall not enter an ADC if he has direct connection with the competition program.
He shall not render services without written agreement.
Which of the following is NOT a responsibiliy of an architect to the public?
He shall not deceive others regarding his architectural competence and experience.
He shall not undertake paid advertisements to promote his services.
He shall promote the interest of his professional organization.
He shall file a complaint on any violations of the Code of Ethical Conduct.
Which is a color to which white is added?
Shade
Tint
Tone
Value
What is the maximum years of imprisonment for a person coercing an architect for design services without executing a service agreement?
2 years
4 years
6 years
8 years
The standard length term of office for the members of the Board?
2 years
3 years
4 years
6 years
An architect signing and sealing his drawings and specifications assume ___ years of civil liability.
15
20
30
10
Using the comparative selection, the project owner starts the process by
Evaluation and Ranking
Negotiation
Pre-Qualification
Invitation
Which method of compensation is appropriate for government projects?
Per Diem
Multiple of Direct Personnel Expenses
Percentage of Construction Cost
Lump Sum or Fixed Fee
Which of the following is NOT prepared during design development phase?
Initial line drawings
Plans and elevations
Outline specifications
Diagrammatic layout of construction systems
Which set of drawings is used to articulate a design concept?
Feasibility studies
Contract documents
Presentation drawings
Specifications
Which drawing refers to the structural, mechanical, electrical or other construction systems of the project?
Schematic drawings
Contract documents
Engineering drawings
Feasibility drawings
Where is this church located?
Designed by Oscar Niemeyer
Portugal
USA
Brazil
India
Where is this remodeled house located?
Designed by Antoni Gaudi
Barcelona, Spain
Paris, France
Florence, Italy
London, England
Where is this school located?
Designed by Walter Gropius
Barcelona, Spain
Paris, France
Dessau, Germany
Chicago, USA
Who designed this building?
Frank Lloyd Wright
Philip Johnson
Mies Van de Rohe
Walter Gropius
Which of the following element marks a position in space?
Point
Arrow
Line
Volume
Which primary element of form is three dimensional?
Point
Line
Plane
Volume
Which is perceived by the visual contrast of the figure outline against its background?
Form
Shape
Texture
Space
Which is perceived by the feel of the surface of a figure, object or form?
Shape
Texture
Form
Tactile
Which solid is generated by the revolution of a rectangle about one of its sides?
Sphere
Cone
Pyramid
Cylinder
As of 2020, who was the last National Artist for Architecture?
Ildefonso Santos Jr.
Francisco Manosa
Juan Felipe Nakpil
Leandro V. Locsin
Who designed the Manila City Hall, Cebu Provincial Capitol, the former Agriculture Building and former Finance Building?
Tomas Mapua
Pablo Antonio
Antonio Toledo
Fernando Ocampo
Who was the second National Artist for Architecture?
Leandro Locsin
Pablo Antonio
Juan Felipe Nakpil
Ildefonso Santos Jr.
Who designed the first reinforced concrete government structure in 1907?
Andres Luna de San Pedro
Carlos Arguelles
William Parsons
Edgar K. Bourne
Which church has a dome designed by Filippo Brunelleschi in 1436?
Reims Cathedral
Florence Cathedral
Amiens Cathedral
Pisa Cathedral
Where did Renaissance start before it spread in other countries?
Italy
India
Germany
Egypt
Which architectural event did NOT directly help in the flourishing of Renaissance Architecture?
Discovery of Ten Books on Architecture
Development of true arches
Architects and artisans were supported by patrons
Increased interest on classical forms
Which is type of masonry where the face of stones were not dressed and squared, usually used as a massive and rugged stone work of lower floors in Italy?
Ashlar
Rough
Hollow
Rustification
Which palace is a great example of Renaissance palace in Florence, Italy?
Palace of Minos
Palazzo Medici Riccardi
Parthenon
Clunny Abbey
Which architect said “Architecture should speak of its time and place, but yearn for timelessness.”
Rem Koolhas
Frank Gehry
Leonardo Da Vinci
Frank Lloyd Wright
Which architect said “My work is not about “form follows function”, but “form follows beauty” or, even better, “form follows feminine”?
Rem Koolhas
Frank Lloyd Wright
Oscar Niemeyer
Mies van der Rohe
Which architect said “Architecture is the learned game, correct and magnificent, of forms assembled in the light.”?
Frank Lloyd Wright
Louis Sullivan
Eileen Gray
Zaha Hadid
Which architect said “To provide meaningful architecture is not to parody history but to articulate it.”?
Eileen Gray
Frank Lloyd Wright
Oscar Niemeyer
Daniel Libeskind
Which architect said “There are 360 degrees, so why stick to one?"
Zaha Hadid
Frank Gehry
Renzo Piano
Daniel Libeskind
Which of the following is non-renewable energy source?
Wind
Hydraulic
Geothermal
Coal
Which of the following is renewable energy source?
Coal
Petroleum
Biomass
Fossil Fuels
Which activity is not sustainable?
Reforestation
Deforestation
Unpaving of Grounds
Water recycling
Which of the following is passive sustainable design strategy?
Good building orientation
High-efficiency appliances
Automated HVAC
Low energy loss mechanical systems
Which of the following is active sustainable design strategy?
High efficiency HVAC system
Good building siting
Proper wind orientation
Sun-shading trees
OCT means
Original Certificate of Title
Original Certificate of Transfer
Official Certificate of Title
Official Certification of Training
Which of the following is NOT a public property?
River easement
Commercial Parking lot
Community park
Public RROW
Which of the following laws governs medium cost housing?
PD223
BP344
PD957
BP220
Which survey is acquired to determine positions of existing site improvements or structures?
Air Survey
National Survey
As-built Survey
Topographic Survey
According to the building code, what is NOT allowed to be built in a waterway easement?
Promenade
Esplanade
Sidewalk
Private Parking Lot
Which UAP-IAPOA SPP document deals with pre-design services?
201
203
202
204-a
Which is not shown in an Architect’s professional seal?
Name
Registration Number
"Architect"
Expiration
Which is not included in the scope of practice of architects?
Structural
Conceptualization
Architectural specifications
Construction supervision
Structural design
In the application for ALE, a masters degree is credited as _______ of diversified experience.
6 months
12 months
24 months
48 months
Which section of RA 9266 states that a program of continuing professional development shall be maintained?
Section 8
Section 18
Section 28
Section 38
Which is filed every April 15?
Professional Tax Receipt
Income Tax Return
IAPOA
PRC Renewal
If an architect registers for sole proprietorship, which agency is he required to register to?
DOLE
DPWH
DTI
SEC
Business permits usually expire in the month of ____________.
December
January
April
September
A business permit is secured from
Mayor's Office
DTI
Barangay Hall
SEC
On providing architectural services, how much is the general VAT percentage?
None
10
12
20
The typical office table height is
850mm
750mm
1050mm
650mm
The average eye level of adult is
1650mm
1450mm
1350mm
1800mm
The height of water closet is
50cm
45cm
40cm
55cm
What is the mattress size for a typical crib?
710mm x
1320mm
800mm x
1500mm
650mm x
1250mm
540mm x
1600mm
What is the maximum height of threshold?
13mm
25mm
45mm
70mm
Early Christian churches evolved from
Roman palaces
Greek temples
Roman basilica
Chinese pagoda
Which is the central axial space connecting the narthex and bema in a basilica?
Nave
Aisle
Apse
Ambulatory
Which is not present in the early Christian churches?
Simple timber roof
Nave and aisles
Rectangular hall
Tracery windows
What church is considered the “mother of all Roman catholic churches” or the seat of the Roman catholic pope?
St. Peter's Basilica
St. John Latheran's Basilica
Hagia Sophia
Florence Cathedral
A church that is also built over a tomb of a Christian martyr is called
Basilica
Cathedral
Martyrium
Abbey
Which type flooring is appropriate for industrial flooring?
Porcelain tiles
Epoxy floor
Concrete tiles
Granite
Thickness of fluid-applied membrane waterproofing are specified in
Inches
Mils
Gauge number
Grit
Which of the following information is NOT included in specifications?
Materials
Installation Method
Non-guarantee of estimates
Quality of workmanship
The effectiveness of roofing insulation is determined by its
SRI
S-value
R-value
Thickness
What does PNS mean?
Philippine National Specifications
Philippine Natural Society
Philippine National Society
Philippine National Strandards
Which space to space relationship is where spaces share a common border?
Interlocking
Adjacent
Space within a Space
Linked
Which spatial organization has a central dominant space about which secondary spaces are grouped?
Linear
Radial
Clustered
Centralized
What do you call a long roofed porch lined with railings?
Pathwalk
Alley
Veranda
Balcony
Which of the following spaces is considered public?
Living Room
Bedroom
Dirty Kitchen
Comfort Room
In a typical house, which of the following space has a door that swings out?
Bedroom
Maid's room
Storage
Comfort Room
What type of specifications is prepared during the Contract Document Phase?
Outline Specifications
Rough Specifications
Technical Specifications
Open Specifications
Which is NOT provided in a specification?
Blow-up detail
Installation method
Material brand or trade name
Finish quality
Scope of work, method and amount of compensation are provided in which document?
Technical Specifications
Owner-Building Official Agreement
Bid Proposal
Service Agreement
Certificate of Occupancy is issued by
Barangay Hall
OBO
City Hall
Bureau of Fire Protection
According to UAP-IAPOA SPP Document 202, how many sets of contract documents are to be given to the owner after its completion?
5 sets
7 sets
8 sets
10 sets
