1 kWh equals to
A) 36 Lakh Joule
B) 3.6 Joule
C) 3.6 KJ
C) 3.6 KJ
Which year energy conservation act is implemented
A) 2014
A) 2014
C) 1991
D) 2001
50 mmWC leads how energy loss in air power in 500 kWh cement mill bag filter fan with total pressure of 500 mmWC and 97 m3/s flow (V). Use Formula: Pressure Loss/Total Pressure* Power
A) 70 kW
B) 30 kW
C) 50 kW
D) 120 kW
What is target year for GHG emission reduction taken by UTCL
A) 2050
B) 2032
C) 2017
D) 2022
1000 traditional lights of 60 watts have been changed to 12 watt LED in our colony & plant in this FY. How much power has been saved in Rs/Yr. with 12 Hrs lighting. Power cost is 0.0035 Rs/Watt.
A) 7.36 Lac Rs/Yr.
B) 5.36 Lac Rs/Yr.
C) 8.35 Lac Rs/Yr.
D) 8.40 Lac Rs/Yr.
Capacity of in DLCW TPP & WHRS
A) 25 MW & 13 MW
B) 20 MW & 12 MW
C) 27 MW & 13 MW
D) 27 MW & 12 MW
Reduction of 5% false air from 15% to 10% in VRM raw mill, resulting the reduction of power in….
A) Raw Mill Fan
B) Raw Mill Bag House fan
C) In Both fans
D) No any power reduction.
A office consuming 1050 kWh in a day due to air conditioning, during winder the fridge mode changed and power consumption reduced to by 150 kWh/Day for 120 days (4 Months) what how much cost has been saved in those days if power cost is 4 Rs/KW.
A) 504000 Rs
B) 42000 Rs
C) 72000 Rs.
D) 600 Rs.
Which is the gate to gate energy consumption of our unit in FY 2021-22
A) 702 kcal/MT Cement Eq.
B) 682 kcal/MT Cement Eq.
A) 730 kcal/MT Cement Eq.
B) 703 kcal/MT Cement Eq.
Which is the gate to gate energy consumption target for present assessment year
A) 682 kcal/MT Cement Eq.
B) 730 kcal/MT Cement Eq.
C) 703 kcal/MT Cement Eq.
D) 702 kcal/MT Cement Eq.
What is mean by PAT
A) Perform Achieve and Transit Scheme (PAT)
B) Perform Achieve and Trade Scheme (PAT)
C) Power Achieved to Trade Scheme (PAT)
C) Perform power Achieved to Trade Scheme (PAT)
How much percentage of our energy consumption is replaced by WHRS installation
A) 10%
B) 15.55%
C) 30%
D) 60%
By FY2025-26 how much GHG emission can be reduced from electrical energy consumption in pre clinkerisation
A) 1,15,141 MT
B) 8118 MT
C) 10616 MT
D) 22140 MT
That is our group level target for green energy in total power mix
A) 13.8 percent
B) 30 percent
C) 65 percent
D) 34 percent
Energy conservation is
A) Same as energy efficiency
B) Different from energy efficiency
C) Energy efficiency and renewable energy
A) A & C
What is best temperature range for solar energy
A) 15 to 50 Deg.C
B) 15 to 35 Deg.C
C) 5 to 35 Deg.C
D) 15 to 50 Deg.C
What is the boiler type of DLCW CPP
A) CFBC
B) AFBC
C) PFBC
A and B
How many stages in Line-2 preheater
A) 4 Stage
B) 14 Stage
C) 6 Stage
D) 9 Stage
What is target of GHG emission reduction at group level
A) 27% from 2017
B) 12% from 2017
C) 25% from 2017
D) 35% from 2017
Which modification done in Line-2 cooler in last FY
A) WHRS system
B) OLBC project
C) ABC inlet
D) AFR feeding