CQI-9

Total questions: 31

Worksheet time: 16mins

Name
Class
Date
1.

Which of the following best explains why heat treatment is considered a "special process" under CQI-9?

a)

It requires specialized equipment only

b)

Its results can be verified by visual inspection

c)

The final product quality cannot be fully verified by inspection alone

d)

It does not require operator training

2.

Who is responsible for defining authorization to establish heat treat process specifications?

a)

Operators

b)

Quality Manager

c)

A responsible person defined in Section 1

d)

Customers

3.

What is the maximum allowed time for cascading newly received and reviewed customer standards?

a)

1 week

b)

2 weeks

c)

3 weeks

d)

1 month

4.

What type of problem-solving approach is required by CQI-9 for addressing customer concerns?

a)

Trial-and-error method

b)

Brainstorming only

c)

Disciplined problem-solving approach

d)

Customer audit review

5.

Internal assessments using AIAG HTSA must be performed at least:

a)

Monthly

b)

Quarterly

c)

Annually

d)

Bi-annually

6.

What is the role of backup or secondary personnel in management documentation?

a)

To replace operators

b)

To ensure continuity in case primary responsible is unavailable

c)

To supervise maintenance work only

d)

To train auditors

7.

The organization must have documented ______ to define management and supervisory functions in heat treatment.

a)

Training records

b)

Job descriptions

c)

Work instructions only

d)

Customer contracts

8.

In CQI-9, training effectiveness must be demonstrated through:

a)

Attendance records

b)

Competence evidence in performing tasks

c)

Management review notes

d)

Customer scorecards

9.

What is the main requirement for process specifications?

a)

They must exist as verbal instructions

b)

They must identify all process steps and parameters with tolerances

c)

They must be reviewed only during audits

d)

They must be approved by customers directly

10.

A major rebuild or modification that impacts product characteristics requires:

a)

A simple operator note

b)

Process validation on production loads

c)

No validation if equipment is new

d)

Customer audit

11.

Process validation should be performed under:

a)

Laboratory conditions only

b)

Full production loads with intended fixtures

c)

Simulation tests without actual parts

d)

Customer demonstration only

12.

What is the acceptable guideline for selecting test samples during load testing?

a)

Random locations only

b)

Locations used for Temperature Uniformity Surveys

c)

Customer-preferred locations only

d)

Operator-selected parts

13.

Which indices can be used to demonstrate process compliance?

a)

Cp, Cpk

b)

RPN only

c)

OEE only

d)

MTBF

14.

The procedure for rework/reprocessing must include:

a)

New process control sheet with modified parameters

b)

Verbal instructions from supervisors

c)

Customer PPAP waiver only

d)

Operator confirmation

15.

Before any rework using an unapproved method, the Tier 1 supplier must:

a)

Notify the OEM

b)

Approve internally only

c)

Ask operator permission

d)

Skip rework entirely

16.

In-process and final test frequencies are defined by:

a)

Operators

b)

Process Tables

c)

Management reviews

d)

Customer audits

17.

Thermocouples must be calibrated:

a)

After each use

b)

Before first use and within the range they will be used

c)

Every 10 years

d)

Only if customers request

18.

SAT (System Accuracy Test) checks apply to:

a)

Furnaces only

b)

Control, monitoring, and recording thermocouples

c)

Operators

d)

Safety systems only

19.

Temperature uniformity surveys (TUS) must be conducted:

a)

Daily

b)

Per requirements in Process Tables

c)

Once per furnace lifetime

d)

Only after maintenance

20.

Which alarms must be checked at least quarterly?

a)

Non-safety alarms

b)

Alarms listed as high probability of causing non-conformance

c)

All alarms every day

d)

Operator alarms only

21.

Protection tubes for thermocouples must be:

a)

Painted yearly

b)

Checked or replaced per PM schedule

c)

Ignored until failure

d)

Verified by customer

22.

Job Audit requires reviewing actual production jobs against:

a)

Management expectations

b)

Documented process control plan and PFMEA

c)

Customer audits only

d)

Maintenance procedures

23.

Which of the following is checked in a job audit?

a)

Operator qualifications

b)

Actual compliance of the job with process specs

c)

Supplier PPAP submission

d)

Plant financial budget

24.

How often must Job Audits be performed?

a)

Monthly

b)

Annually at minimum

c)

Daily

d)

When a problem occurs only

25.

Aluminum heat treatment processes fall under:

a)

Process Table A

b)

Process Table C

c)

Process Table D

d)

Process Table H

26.

Process Tables define:

a)

Furnace supplier contracts

b)

Minimum frequency for process checks

c)

Marketing costs

d)

Customer complaints

27.

If a heat treater skips a required frequency in process tables, what must be obtained?

a)

Customer written approval

b)

Supplier verbal approval

c)

Operator agreement

d)

HR confirmation

28.

Your organization performs nitriding using plasma (ion) technology. Which process table should be referenced?

a)

Table B

b)

Table H

c)

Table G

d)

Table E

29.

In Process Table D (Induction Heat Treating), which of the following is critical to ensure repeatable hardening depth?

a)

Coil design and positioning

b)

Operator shift schedule

c)

Packing density of the parts

d)

Batch size only

30.

A customer requires powder metallurgy gears with high hardness directly from sintering, without quenching. Which process table applies?

a)

Table G

b)

Table E

c)

Table I

d)

Table H

31.

Which process table would cover hot stamping of structural automotive parts (e.g., B-pillars)?

a)

Table H

b)

Table I

c)

Table B

d)

Table D