WorksheetsKBQC Grand Finale Round-1
Total questions: 10
Worksheet time: 5mins
Which QC tool is most effective in visually representing the relationship between two variables with a focus on cause-and-effect relationships?
Cause-and-Effect Diagram
Scatter Diagram
Correlation Diagram
Pareto Chart
Choose the correct option for below mentioned statements
1) In PM Task, Solution is clear and needs focus in implementation.
2) PM Projects requires deeper analysis and usage of QC Story
Only Statement 1 is correct
Only Statement 2 is correct
Both Statements are correct
Neither statement 1 nor statement
In the context of the 7 QC tools, which one is primarily used for analyzing the distribution of defects or issues over time?
Scatter Diagram
Control Chart
Check Sheet
Pareto Chart
MSC fulfills which of the following Objectives?
Having a view of end to end process
Identification of weak areas in the process
Confirmation that we have not missed out & Helps in listing of standards required in a function
All of the above
What does the abbreviation "QFD" stand for in the context of Total Quality Management?
Quality Function Deployment
Quality Flow Diagram
Quick Feedback Development
Quality Feature Design
What is the primary purpose of using an R Chart in control chart analysis?
Monitoring the proportion of non-conforming units
Detecting shifts in the central tendency of a process
Tracking changes in the number of defects per unit
Analyzing variations in subgroup means
The training room temperature during training must be kept between 22 to 26 degrees Celsius. In every 2 hours, the FM coordinator monitors the temperature of the classroom. It was observed that the temperature is maintained at 21 +/- 5% degrees Celsius during the month of September '22. The statement implies that:
The process is stable but not capable
The process is unstable but capable
The process is stable but capable
The Process in unstable and not capable
Out of the following Statements related with Daily Management Vehicle, please select the most correct option:
Statement 1: Daily Management is about managing all work activities which occurs everyday only
Statement 2: No Improvement can sustain over a period of Time if DM is not effective
Statement 3: Daily Management is used for sustenance of the current activities/processes
1-True, 2-True, 3-True
1-True, 2-False, 3-True
1-False, 2-True, 3-True
1-True, 2-False, 3-False
If a sample drawn from the process lies outside the upper control limit or lower control limit, it means the __________
Process is in control
Process is out of control
Process is partially in control
Process is partially out of control
Which TQM Guru advocated for the concept of "Total Employee Involvement" and emphasized the role of employees in quality improvement initiatives?
Joseph Juran
Armand Feigenbaum
Kaoru Ishikawa
W. Edwards Deming