Total questions: 118
Worksheet time: 59mins
Onset of plastic deformation will result due to Hardening
a. Hardening
b. Ductility
c. Necking
d. Yielding
Strain Unit?
a. Dimension less
b. ¼ PI
c. Pa
d. N/mm2
You discover violation of specification at nearly end of the project, what you will do…
a. Inform to Client and ask what to do
b. You will try to find some loophole to escape from the problem arisen
c. Do nothing , its Boss problem ,he will handle it later
d. Punish the violator
What is the function of the barometer?
a. Measure the pressure differential
b. Related to tube measurement
c. Measure the atmospheric pressure
d. All of above
Some devices to be installed (don’t remember-may fire sprinkler ) related to distance from the Centre of elevator
a. 6.4 meter
b. 4.6 meter
c. 3 meter
d. 1.5 meter
Fire resistance of the vertical wall
a. Less than 15 min resistance
b. Less than 30 min resistance
c. Less than 1 hour resistance
d. Less than 2 hour resistance
Efficiency of a power plant if the efficiencies of the boiler, turbine and generator are 88, 40 and 98%, respectively.
a. 35 % { E power plant = [E boiler] [E turbine] [E generator] = (0.88) (0.40) (0.98) = 0.35 }
b. 42%
c. 90%
d. 15%
Activity B has 4 days LAG compare to A what does it mean
a. Activity B start 4 days before A completion
b. Activity A and B both will start on 4th day
c. 4 day waiting time between Activities A & B
d. None of above
If you are going to start with oil pipeline construction which is the following engineer you are going to choose:
a. Petroleum
b. Mechanical
c. Civil
d. Chemical
Molecular formula of refrigerant R410a
a. CH2FCF3
b. 50%CH2F2/50%CH2CF3
c. CHF2CF3
d. None of these
Fast tracking to be performed in the project
a. Compress the schedule without changing the scope of project
b. Compress the schedule without changing the cost of the project
c.
d. All of above
Project is awarded , what you will do next
a. Plan the work
b, Develop project charter
a. Develop schedule
b. Define scope
Testing of heat detector( NFPA 72)
a. Quarterly
b. Annually
c. Monthly
d. Semiannually
Isolated system is a system that:
a. Mass is not entering or leaving the system while the energy can be transfer
b. Neither mass nor the energy enter or leaves the system
c. Mass leave and enters the system while energy don’t
d. None of the above
Coefficient of performance of a refrigerator that consumes 800 watts of power to remove heat at a rate of 5 BTU per second.
a. 4.6
b. 6.6 ( 5 x 1055/800 = 6.6) ( where 1BTU=1055 j) & ( 1 watt = 1j/s)
c. 8.2
d. 3.5
One of the following is not process of the project:
a. Concept
b. Initiating
c. Planning
d. Executing
Which test generally performs after installation of fire damper?
a. Fire test
b. Smoke test
c. Both A& B
d. All of above
In context of Ideal Gases , following is true
a. PV= nRT
b. PR= nVT
c. n=RT/PV
d. None of above
Software programming flow
a. Plan,Do,Check,Act
b. Plan,Do,Act,Check
c. Plan,Act,Do,Check
d. Non of these
When need high pressure with low discharge
a. Centrifugal pump
b. Axial pump
c. Propeller pump
d. Reciprocating pump
Enclosed parking area ventilation need the capacity at normal time
a. 47 L/min for the square meter area
b. 300 L/min for the square meter area
c. 6 L/min for the square meter area
d. 87 L/min for the square meter area
As per NFPA supervisory control valve inspection frequency
a. Monthly
b. Quarterly
c. Semi –annually
d. Annually
As per NFPA supervisory control valve testing frequency
a. Monthly
b. Quarterly
c. Semi –annually
d. Annually
Which kind of wall keep between two building blocks to avoid spreading of fire from one to another
a. Shear wall
b. Retainer wall
c. Fire wall
d. None of above
Without using photo voltaic cell solar power used for which air conditioning
a. Vapor compression
b. Vapor absorption
c. Using battery
d. Hot pipe
Heat stress happen in the metal due to
a. Temperature
b. Temperature gradient
c. Molecular arrangement
d. Cooling
As per NFPA water sprinkler testing frequency
a. Monthly
b. Semi – annually
c. Weekly
d. Annually
Inspection for the manual call point done
a. Monthly
b. Semi – annually
c. Annually
d. Quarterly
First step of Scope planning starts with
a. Budgeting
b. Current earning estimation
c. Objectives and requirements to satisfy customer
d. Non of these
In network which point getting more inward flow
a. Float
b. Critical path
c. Slack
d. Merging point
Car bumper purpose
a. High speed impact
b. Low speed impact
c. a & b
d. Non of the above
Brake lining have character of
a. Wear resistance
b. Temperature dissipation
c. Resistance to heat
d. All above
Intersecting point for WBS and OBS
a. Cost account
b. Intersect matrix
c. Project matrix
d. None of above
What is the least level of WBS
a. Deliverable
b. Cost
c. Work package
d. Lowest sub deliverable
NFPA trained person takes minimum time for investigation and reset fire preventive system
a. 3 min
b. 30 min
c. 1 hour
d. 3 hour
What is the rating of fire wall required for four story or more?
a. 1 hour
b. 2 hour
c. 30 min
d. 45 min
Priming the pump means:
a. To paint the pump casing with primer to avoid pump rusting
b. Remove air from pump casing and impeller
c. Remove air from pump piping
d. Non of these
If your boss has already assigned a new project and you are the project manager what is the first thing to do
a. Make a report about project processes
b. Make a report about project cost needed
c. Ask your boss about the team work
d. Make Modification about Planning Process.
If we increase the Insulation around the pipe heat will transfer due to
a. Increase of conduction and decrease of convection
b. Decrease of conduction and increase of convection
c. Increase both of conduction and convection
d. Decrease both of conduction and convection
Total angles inside the Hexagonal shape
a. 360
b. 720
c. 900
d. Non of these
System used for car park for hazard detection
a. NFPA88A
b. NFPA170
c. ICP
d. Not recall
The opening in structural car parking should be --------from all building
a. 5%
b. 10%
c. 15%
d. Above 40%
Inspection of heat detector according to NFPA
a. Monthly
b. Semi Annually
c. Weekly
d. Annually
Visual Inspection of zone control value as per NFPA
a. Semiannually
b. Quarterly
c. Monthly
d. Weekly
Which of these devices used to control the hazards?
a. Fire damper
b. Smoke controls
c. Stack dumper
d. Not recall
Turbulent flow can be determining by
a. Reynold's number
b. Weber's number
c. Mole number
d. Specific weight
Centripetal force acts at the radius of circle
a. From the Centre of the circle
b. To the Centre of the circle
c. Outside the circle
d. None of these
Frictional gear at automobile cars used to
a. Reduced speed
b. Turn around
c. To stop speed
d. None of these
Hooke’s laws holds good up to
a. Yield point
b. Limit of proportionality
c. Breaking point
d. Electric limit
when heat is Transferred by molecular collision, it is referred to as heat transfer by
a. conduction
b. radiation
c. convection
d. Correction and radiation
In convection heat transfer from hot flue gases to water tube, even though flow may be turbulent, a laminar flow region (boundary layer of film) exist close to the tube. The heat transfer through this film takes place by.
a. Convection
b. Radiation
c. Conduction
d. Both convection and conduction
Architecture visit the site gypsum board wall team work with very poor quality, what should do?
a. Stop work immediately
b. Call superintendent responsible for work and inform him
c. Call the owner and tell him
d. Contact main General Contractor
Government need to build new library, where should contrast
a. Near recreation & garden areas
b. Near bus station
c. Near school
d. Near jobs office & Government areas
Your boss gives new assignment which you don’t know about it, what you should do?
a. Inform him the truth
b. Get help from good Engineer to support you
c. Study it & do his effort to do it
d. None of these
The tendency of a liquid surface to contract is due to the following property
a. Cohesion
b. adhesive
c. viscosity
d. surface tension
Buoyant force is
a. The result force acting on a floating body
b. The resultant force on a body due to the fluid surrounding it.
c. Equal to the volume of liquid dis‐placed
d. None of the above
According to Bernoulli’s equation for steady ideal fluid flow
a. Principal of conservation of mass holds
b. velocity and pressure are inversely proportional
c. Total energy constant throughout
d. The energy is constant along a stream line but may vary stream lines but may a cross streamline
At the Center line of pipe flowing under pressure where the velocity gradient zero, the shear will be
a. Minimum
b. Maximum
c. Zero
d. Could be any value
Which part stop spark & fire inside duct
a. Spark arrestor
b. Fire dumper
c. Grills
d. None of these
Insert smoke inside HVAC Duct to check
a. Leak
b. Air velocity
c. Density
d. Oxygen level
Inspections for heat detector as per NFPA could be
a. Weekly
b. Semi Annually
c. Monthly
d. Quarterly
Which parameters affect the fluid speed?
a. Density
b. Viscosity
c. Homogenouslye
d. None of these
If you were awarded a project, you will start work:
a. One week before the approval of the authorities
b. After the approval of the authorities
c. One day before the approval of the authorities
d. None of these
Project Scope Management:
a. Define scope and control scope
b. Executing scope and verify scope
c. Closing process and Create work breakdown structure
d. All of the above
Scope Management starts with is:
a. To identify the client requirements
b. Meet the team
c. Review strategic plan
d. None of these
Final as built drawings for what purpose
a. To keep record for later maintenance
b. To give more work to architect
c. To be used for further renovation
d. None of these
Control department work starts
a. From the beginning of the project
b. During construction
c. After construction
d. None of these
Project management is ideally suited except
a. Accountability
b. Flexibility
c. Innovation
d. Repeatability
e. Speed
A critical path is the ----------------------in the project management:
a. longest
b. shortest
c. a & b
d. none
The forward pass review of the project management will indicate the following:
a. The earliest start of the task
b. The earliest finish of the task
c. Critical path (longest path)
d. All of the above
The back pass review of the project will indicate the following:
a. The latest start of the task.
b. The earliest finish of the task.
a. The critical path..
b. All of the above
Intersecting point for WBS and OBS
a. Cost account
b. Intersect matrix
c. Project matrix
d. None of above
For operation and designed auto mobile factory
a. Mechanical Engineer
b. Civil Engineer
c. Chemical Engineer
d. Petroleum Engineer
Which of the following discipline is most suitable for doing a natural gas pipeline work?
a. Mechanical Engg
b. Petroleum Engg
c. Chemical Engg
d. Civil Engg
Gypsum board at residence and industrial building used except
a. Low cost
b. Ease of installation
c. Recyclability
d. None of these
Which one of the following is suitable in engineering manner? “Decision shall be based on reason than situation’’.
a. Quantity Thinking.
b. Logical Thinking.
c. Interpersonal Skills.
d. Honesty.
An activity in a project network can be represented by which of the following?
a. Arrow
b. Line
c. Node
d. All of the above
Before starting work at site, the major factor has to be checked is?
a. Access to site (EFE)
b. Storage of Water, tools & equipment
c. Safety
d. Approval from MMUP / Civil / Defense etc.
Software programming flow
a. Plan, Do, Check, Act
b. Plan, Do, Act, Check
c. Plan, Act, Do, Check
d. None of these
First step of Scope planning starts with
a. Budgeting
b. Current earning estimation
c. Objectives and requirements to satisfy customer
d. None of these
In network which point getting more inward flow
a. Float
b. Critical path
c. Slack
d. Merging point
Molal ideal gas specific heat depends on
a. Temperature
b. Pressure
c. Both temperature and pressure
d. Molecular counting
Car bumper purpose
a. High speed impact
b. Low speed impact
a & b
None of these
Brake lining have character of
a. Wear resistance
b. Temperature dissipation
c. Resistance to heat
d. All above
Intersecting point for WBS and OBS
a. Cost account
b. Intersect matrix
c. Project matrix
d. None of above
What is the least level of WBS
a. Deliverable
b. Cost
c. Work package
d. Lowest sub deliverable
NFPA trained person takes minimum time for investigation and reset fire preventive system
a. 3 min
b. 30 min
c. 1 hour
d. 3 hour
What is the rating of fire wall required for four story or more?
a. 1 hour
b. 2 hour
c. 30 min
d. 45 min
Priming the pump means:
a. To paint the pump casing with primer to avoid pump rusting
b. Remove air from pump casing and impeller
c. Remove air from pump piping
d. None of these
If your boss has already assigned a new project and you are the project manager what is the first thing to do
a. Make a report about project processes
b. Make a report about project cost needed
c. Ask your boss about the team work
d. Make Modification about Planning Process.
If you were awarded a project, you will start work
a. After the approval of the authorities
b. One day before the approval of the authorities
c. One week before the approval of the authorities
d. None of these
Project Scope Management
a. Executing scope and verify scope
b. Define scope and control scope
c. Closing process and Create work breakdown structuree
d. All of the above
Scope Management starts with is
a. To identify the client requirements
b. Review strategic plan
c. Meet the team
d. None of these
Final as built drawings for what purpose
a. To give more work to architect
b. To keep record for later maintenance
c. To be used for further renovation
Control department work starts
a. After construction
b. During construction
c. From the beginning of the project
Project management is ideally suited except
a. Speed
b. Accountability
c. Flexibility
d. Repeatability
A critical path is the ----------------------in the project management:
a. Longest
b. Shortest
c. None
The forward pass review of the project management will indicate the following:
a. The earliest start of the task
b. Critical path (longest path)
c. The earliest finish of the task
d. All of the above
Intersecting point for WBS and OBS
a. Project matrix
b. Intersect matrix
c. None of above
d. Cost account
Gypsum board at residence and industrial building used except
a. Low cost
b. Ease of installation
c. Recyclability
Acceptable reasons for project stopping, except?
a. Frustration
b. Labor dispute
c. Natural calamities
d. None of above
Before starting work at site, the major factor has to be checked is?
a. Approval from MMUP / Civil / Defense etc.
b. Access to site (EFE)
c. Storage of Water, tools & equipment
d. All of the above
Software programming flow
a. Plan, Do, Act, Check
b. Plan, Act, Do, Check
c. Plan, Do, Check, Act
In network which point getting more inward flow?
a. Slack
b. Float
c. Critical path
d. Merging point
What is the least level of WBS
a. Deliverable
b. Work package
c. Cost
d. None of above
The most important end state of project initiation is
a. Management provides the budget required
b. Management assigns a project manager
c. Management approves the project charter
d. Management agrees to the details of works to be done
What is the duration of the project?
a. 45weeks
b. 46weeks
c. 47weeks
d. 44weeks
The main activity in project scope definition is to
a. Select team members
b. Define the work breakdown structure
c. Analyze the current budget plan
d. Set up the meeting on project
e. Meet with team members
Project Control will be:
a. Before construction
b. During construction
c. Throughout the process
d. After construction
Which is not part of Scope Management?
a. Execute Scope
b. Define scope
c. Verify Scope
d. None of the above
Process to identify, study, analyze, and rectify root cause of incidents is called:
a. Quality Control Procedures
b. Cause and Effect Analysis
c. Pareto Analysis
d. Risk Opportunity Management
In the context of time management, which is not a typical type of activity dependency:
a. Mandatory dependency
b. Discretionary dependency
c. Multiple dependency
d. External dependency
Which is not a resource related to activities
a. Material
b. Time
c. Manpower
d. Machinery
Process of decomposing deliverables into smaller, more manageable components is complete when
a. Each work element can be found in the WBS
b. Project justification has been established
c. Change request have occurred
d. Cost and duration estimates can be developed
Project life cycle is different than product life cycle in that project life cycle:
a. Is different for each industry
b. Covers different project
c. Describes project management activities
d. Does not incorporate methodology
Best time to assign a project manager to a project is during:
a. Closing
b. Monitoring and Controlling
c. Execution
d. Initiation
The final step in the definition of a work breakdown structure is to
a. Develop the responsibility matrix
b. Assign the cost account to a manager
c. Assign the work package to a manager
d. Assign codes for each activity of the work package
What are the most important components of sustainability?
a. Environmental
b. Social
c. Economical
d. All are equally important