wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Unit 312 - Electrical authority, legislation and safety

Total questions: 45

Worksheet time: 23mins

Name
Class
Date
1.

Which of the following is an example of an electrical procedure a plumber may perform?

a)

Earth bonding

b)

Painting walls

c)

Installing carpets

d)

Baking bread

2.

Under the Approved Document Part P regulation, when is a plumber not required to be Part P qualified?

a)

When replacing a like-for-like component

b)

When working in a danger zone

c)

When installing new electrical systems

d)

When working on a swimming pool

3.

Who must undertake work in a danger zone according to Building Regulations Part P?

a)

A plumber

b)

A fully qualified electrician

c)

A general contractor

d)

A building inspector

4.

Which of the following is considered a danger zone under Building Regulations Part P?

a)

A kitchen

b)

A room with a bath or shower

c)

A living room

d)

A bedroom

5.

According to the Health and Safety at Work Act 1974 (HASAWA), what must a plumber do while working on site?

a)

Use tools and equipment incorrectly

b)

Ignore damaged equipment

c)

Work safely and consider those around them

d)

Disregard employer instructions

6.

What is essential regarding damaged equipment according to the responsibilities outlined?

a)

Leave it in service

b)

Ignore it

c)

Remove it from service and report to employer

d)

Use it until it breaks

7.

What should a plumber always do in relation to their employer?

a)

Disobey instructions

b)

Cooperate with them

c)

Work independently

d)

Avoid communication

8.

What do the EAW (Electricity at Work) Regulations cover?

a)

Installation, testing, and maintenance of commercial electrical systems

b)

Design and construction of residential buildings

c)

Manufacturing of electrical appliances

d)

Sales and marketing of electrical products

9.

According to the EAW Regulations, what must be done with damaged equipment?

a)

It should be repaired immediately

b)

It should be taken out of service

c)

It should be sold at a discount

d)

It should be used with caution

10.

What is required of an engineer under the EAW Regulations?

a)

They must work independently at all times

b)

They should only do tasks they are qualified for or be suitably supervised

c)

They must supervise all tasks on site

d)

They should perform all tasks regardless of qualification

11.

What do the CDM (Construction Design and Management) Regulations emphasize?

a)

The importance of architectural design

b)

The duty of care for health and safety on a construction site

c)

The need for rapid construction

d)

The focus on cost reduction

12.

What should be in place according to the CDM Regulations?

a)

A financial plan for the project

b)

An appropriate safety plan for site work

c)

A marketing strategy for the construction

d)

A timeline for project completion

13.

What do the CDM (Construction Design and Management Regulations) require for a construction site?

a)

Aesthetic design plans

b)

Financial management plans

c)

An appropriate safety plan

d)

Marketing strategies

14.

Which aspect of building construction is NOT covered by Building Regulations?

a)

Electrical safety

b)

Fire safety

c)

Landscaping

d)

Ventilation

15.

What does Approved Document Part P of the Building Regulations cover?

a)

Energy efficiency

b)

Electrical work

c)

Plumbing systems

d)

Structural integrity

16.

Why should manufacturers' instructions be followed?

a)

To ensure aesthetic appeal

b)

To ensure correct installation and operation

c)

To reduce costs

d)

To increase sales

17.

What is the requirement for electrical installations according to the document?

a)

BS 7671 (design, installation, and testing)

b)

BS 1234 (safety and maintenance)

c)

BS 4321 (installation and repair)

d)

BS 6789 (design and safety)

18.

What are the 18th edition IET Wiring Regulations also known as?

a)

British Standard BS 7671

b)

British Standard BS 1234

c)

British Standard BS 4321

d)

British Standard BS 6789

19.

In what year did the IEE Wiring Regulations become British Standard BS 7671?

a)

1992

b)

1985

c)

2000

d)

1978

20.

What is the purpose of a minor works certificate?

a)

To install a new circuit

b)

To indicate responsibility for design, construction, inspection, and testing

c)

To replace major electrical systems

d)

To certify large-scale electrical projects

21.

Which tasks should a competent person be able to carry out for a minor works certificate?

a)

Insulation resistance, earth loop impedance, polarity, and RCD operation

b)

Circuit design, installation, and maintenance

c)

Major electrical system overhauls

d)

New circuit installations

22.

What does the signing of the minor works form confirm?

a)

The installation of a new circuit

b)

The safety of the existing installation is not impaired

c)

The completion of a major electrical project

d)

The need for further inspections

23.

Who is authorized to issue a minor works certificate?

a)

Any electrician

b)

A Part P qualified operative

c)

A construction manager

d)

A building inspector

24.

What does Part P usually require before electrical work can be carried out on domestic premises?

a)

Notification of works to the planning department

b)

Approval from a registered competent person

c)

Installation of a new boiler

d)

Completion of a safety course

25.

When is electrical work considered non-notifiable under Part P?

a)

When it is carried out by a registered competent person or is minor work

b)

When it involves installing a new circuit

c)

When it requires a new power supply

d)

When it is done in a commercial building

26.

Which of the following is an example of minor work?

a)

Installation of a spur outlet for a boiler

b)

Installation of a new electrical panel

c)

Rewiring an entire house

d)

Installing a new lighting system

27.

What should be recorded on the minor electrical installation works certificate?

a)

Type and rating of the protective supply device

b)

The color of the wires used

c)

The brand of the equipment installed

d)

The name of the electrician

28.

What must be satisfied according to Part P for electrical safety?

a)

All fundamental principles as specified in British Standard 7671:2018

b)

The installation of new safety devices

c)

Approval from the local council

d)

Completion of a safety training program

29.

What should be considered when referring to the method statement in a risk assessment?

a)

Access to the worksite and others working there

b)

The color of the equipment

c)

The time of day

d)

The weather conditions

30.

What should be included in a risk assessment regarding systems and equipment?

a)

The brand of the equipment

b)

The integrity and working conditions

c)

The color of the equipment

d)

The age of the equipment

31.

What is a necessary step in identifying hazards on a site?

a)

Walking around the site and listing them

b)

Asking the manager

c)

Reading a manual

d)

Watching a video

32.

What should be included in a risk assessment regarding environmental factors?

a)

The presence of tripping hazards and excessive noise

b)

The color of the walls

c)

The type of flooring

d)

The number of windows

33.

What should be assessed regarding other contractors in a risk assessment?

a)

Their lunch breaks

b)

Their operations and any COSHH concerns

c)

Their uniforms

d)

Their transportation

34.

What guideline should be followed in a risk assessment?

a)

The HSE five steps to risk assessment

b)

The company's dress code

c)

The local weather report

d)

The employee handbook

35.

What is the first step in the HSE's five-step guide to completing a risk assessment?

a)

Evaluate the risks and decide on precautions.

b)

Identify the hazards.

c)

Record your findings and implement them.

d)

Review your risk assessment and update, if necessary.

36.

What should you do after recording your findings in a risk assessment?

a)

Identify the hazards.

b)

Decide who might be harmed and how.

c)

Implement them.

d)

Evaluate the risks and decide on precautions.

37.

What is the final step in the HSE's risk assessment guide?

a)

Record your findings and implement them.

b)

Review your risk assessment and update, if necessary.

c)

Identify the hazards.

d)

Evaluate the risks and decide on precautions.

38.

What is the responsibility of an engineer working on site?

a)

To ignore risk assessments

b)

To focus only on their own safety

c)

To recognize the importance of carrying out a risk assessment

d)

To work without cooperating with others

39.

Why is it essential for engineers to cooperate with their employer?

a)

To avoid working safely

b)

To comply with HASAWA

c)

To increase personal risk

d)

To ignore potential hazards

40.

What should engineers continually reassess on site?

a)

The number of workers

b)

The design of the building

c)

The risks of new potential hazards

d)

The cost of materials

41.

What should a plumber's responsibility regarding electrical work not exceed?

a)

Their level of competence

b)

Their level of interest

c)

Their level of experience

d)

Their level of education

42.

What should you do if you are not confident in carrying out electrical installations?

a)

Proceed with caution

b)

Ask a friend for help

c)

Do not carry out the work

d)

Try it anyway

43.

What can a plumber replace without being Part P registered?

a)

A like-for-like component

b)

A new circuit

c)

A significant part of an installation

d)

An entire electrical system

44.

Who must be Part P qualified?

a)

Anyone installing a new circuit

b)

Anyone replacing a light bulb

c)

Anyone painting a wall

d)

Anyone cleaning a fan

45.

What should you do when in doubt about electrical work?

a)

Continue working

b)

Contact an electrician

c)

Ask a neighbor

d)

Search online