PPT 11 - Decommission systems and components

Total questions: 11

Worksheet time: 6mins

Name
Class
Date
1.

What is decommissioning in the context of plumbing?

a)

The process of installing a new system

b)

The isolation of a system for repair, extension, renewal, or removal

c)

The maintenance of a system to ensure efficiency

d)

The upgrading of a system to a newer model

2.

What happens during temporary decommissioning?

a)

The system is permanently removed

b)

The system is isolated and then put back into operation

c)

The system is upgraded to a new version

d)

The system is left unused indefinitely

3.

What is a characteristic of permanent decommissioning?

a)

The system is temporarily isolated

b)

The system is upgraded and reused

c)

The system is isolated, drained, and pipework is capped

d)

The system is left operational but unused

4.

What is important to ensure when decommissioning a building?

a)

The occupier is unaware of your actions.

b)

The occupier is aware of your actions.

c)

The building is left unattended.

d)

The work is done during peak hours.

5.

What should be done to minimize disruption to the user during decommissioning?

a)

Isolate the entire system.

b)

Isolate only part of the system.

c)

Ignore user needs.

d)

Work without any isolation.

6.

What action should be taken regarding existing pipework during decommissioning?

a)

Leave it as it is.

b)

Cap off existing pipework.

c)

Remove all pipework.

d)

Ignore the pipework.

7.

What should be placed against stop valves and service valves during decommissioning?

a)

Warning signs.

b)

Decorative signs.

c)

No signs are needed.

d)

Signs indicating permanent closure.

8.

What is a passive dead leg in plumbing?

a)

A section of pipework where water cannot be drawn off or flow

b)

A section of pipework where cold water must be drawn off first

c)

A section of pipework that is always in use

d)

A section of pipework that is used for gas flow

9.

What is an active dead leg in plumbing?

a)

A section of pipework where water cannot be drawn off or flow

b)

A section of pipework where cold water must be drawn off before hot water

c)

A section of pipework that is always in use

d)

A section of pipework that is used for gas flow

10.

When draining cold water systems, from where should you always start draining?

a)

From the highest point of the system

b)

From the lowest point of the system

c)

From the middle of the system

d)

From any random point

11.

What is the purpose of isolating the rest of the system during maintenance or replacement?

a)

To increase water flow

b)

To prevent water contamination

c)

To ensure safety and efficiency

d)

To reduce noise