WorksheetsD32 quiz of the day
Total questions: 25
Worksheet time: 25mins
Name
Class
Date
1.
What is the measuring unit for site clearance?
a)
m³
b)
m²
c)
Running meter
d)
Each
2.
How many modular bricks are required for 1 m³ of brickwork?
a)
400
b)
500
c)
600
d)
550
3.
How many laterite stones are required for 1 m³ of wall?
a)
50
b)
55
c)
60
d)
65
4.
What is the painting coefficient for a panelled door per side?
a)
1.3
b)
1.2
c)
0.5
d)
2.0
5.
What is the dry volume of mortar for 1 m³ of brick masonry?
a)
0.25 m³
b)
0.30 m³
c)
0.45 m³
d)
0.15 m³
6.
What is the weight of cement needed for 1 m³ of PCC in 1:3:6 mix?
a)
228 kg
b)
330 kg
c)
137 kg
d)
432 kg
7.
What is the standard deduction rule for plastering openings up to 0.5 m²?
a)
No deduction
b)
One side deducted
c)
Both sides deducted
d)
Double area deducted
8.
What is the dry volume factor used for converting wet concrete volume?
a)
1.25
b)
1.52–1.54
c)
1.40
d)
1.66
9.
Which unit is used for measuring felling of trees?
a)
m²
b)
m³
c)
Each
d)
Lump Sum
10.
What is the volume of coarse aggregate in 1 m³ of PCC (1:3:6)?
a)
0.90 m³
b)
0.85 m³
c)
0.95 m³
d)
0.80 m³
11.
Which of the following is the standard size of a laterite stone?
a)
30 × 20 × 15 cm
b)
44 × 24 × 14 cm
c)
45 × 20 × 12 cm
d)
40 × 25 × 15 cm
12.
Which layer of roof covering requires 11.5 m² of sheet for 10 m² of area?
a)
GI Sheet
b)
Plain Sheet
c)
AC Sheet
d)
Aluminium Sheet
13.
What is the unit weight of 6 mm diameter steel bar?
a)
0.30 kg/m
b)
0.20 kg/m
c)
0.22 kg/m
d)
0.25 kg/m
14.
Calculate the number of bricks required for 5 m³ brick wall.
a)
2000
b)
2500
c)
5000
d)
3000
15.
How many cement bags are needed for 10 m³ wet concrete in 1:3:6 mix?
a)
40 bags
b)
50 bags
c)
45 bags
d)
60 bags
16.
Which of the following is not deducted in concrete measurement?
a)
Opening > 0.1 m³
b)
Beam intersection < 0.05 m²
c)
Wall plates > 10 cm
d)
Chajjas
17.
Which roof tile requires 160 nos. for covering 10 m²?
a)
Mangalore Tile (340 mm)
b)
AC Sheet
c)
Mangalore Tile (320 mm)
d)
GI Sheet
18.
Which term defines the abstract of quantities multiplied by respective rates?
a)
Schedule of rates
b)
Abstract estimate
c)
Rate analysis
d)
Measurement book
19.
In rate analysis, which factor is **not** considered?
a)
Labour cost
b)
Material cost
c)
Architect’s salary
d)
Overhead charges
20.
Find the cost of 10 m² of plastering at Rs. 140 per m².
a)
Rs. 1140
b)
Rs. 1400
c)
Rs. 1200
d)
Rs. 1000
21.
Which estimate is prepared without detailed drawings?
a)
Detailed estimate
b)
Abstract estimate
c)
Revised estimate
d)
Preliminary estimate
22.
What is added to the cost estimate to account for unexpected items?
a)
Overhead
b)
Contingency
c)
Labour rate
d)
Profit
23.
Which method is used to calculate quantity of brickwork in a wall?
a)
Center line method
b)
Cross-section method
c)
Plinth area method
d)
Bay method
24.
Which software is widely used for preparing estimates and billing?
a)
AutoCAD
b)
STAAD Pro
c)
MS Excel
d)
Revit
25.
Which estimate is required when the actual cost exceeds 10% of sanctioned amount?
a)
Revised estimate
b)
Supplementary estimate
c)
Detailed estimate
d)
Preliminary estimate
100 %