Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

ISO 29001:2020 Awareness

Total questions: 34

Worksheet time: 17mins

Name
Class
Date
1.

What is ISO 29001:2020 primarily focused on?

a)

Environmental management

b)

Quality management for the petroleum, petrochemical, and natural gas industries

c)

Occupational health and safety

d)

Financial management

2.

Which international organization developed ISO 29001:2020?

a)

IEC

b)

IEEE

c)

ISO

d)

OSHA

3.

What is the main objective of ISO 29001:2020?

a)

To improve employee health

b)

To ensure consistency in product and service quality 

c)

To reduce greenhouse gas emissions

d)

To regulate financial transactions

4.

Which phase is critical for implementing a risk-based approach in ISO 29001:2020?

a)

Risk identification

b)

Risk assessment

c)

Risk mitigation

d)

All of the above 

5.

Which of the following statements best describes how ISO 29001:2020 integrates with ISO 9001:2015?

a)

ISO 29001:2020 completely replaces ISO 9001:2015 for oil and gas companies.

b)

ISO 29001:2020 builds upon ISO 9001:2015 with sector-specific requirements and additional risk controls. 

c)

ISO 29001:2020 only applies to suppliers, while ISO 9001:2015 applies to manufacturers.

d)

ISO 29001:2020 removes the concept of risk-based thinking introduced in ISO 9001:2015.

6.

In ISO 29001:2020, what is the key requirement regarding contingency planning in supply chain operations?

a)

Companies must document potential disruptions but are not required to take action.

b)

Companies must establish contingency plans and include roles and responsibility for response, communication and immediate actions.

c)

Companies only need contingency plans for critical suppliers.

d)

Contingency planning is a guideline, not a mandatory requirement.

7.

What is the primary benefit of integrating ISO 29001:2020 with API Q1 or API Q2 standards?

a)

Ensuring compliance with financial regulations.

b)

Aligning quality management with American Petroleum Institute (API) requirements for equipment manufacturing and service providers. 

c)

Replacing the need for internal audits.

d)

Eliminating supplier inspections.

8.

Which risk management tool is most appropriate for proactively identifying potential failures in a petroleum refining process?

a)

SWOT Analysis

b)

Failure Mode and Effects Analysis (FMEA)

c)

Balanced Scorecard

d)

Six Sigma

9.

How does ISO 29001:2020 differentiate between corrective actions and preventive actions?

a)

Corrective action is action against cause of non-conformity and preventive action is action against possible cause of non-conformity

b)

Corrective actions focus on compliance, while preventive actions focus on efficiency.

c)

Corrective actions are optional, while preventive actions are mandatory.

d)

Both corrective and preventive actions are identical in implementation.

10.

Why is a documented Management of Change (MoC) process critical under ISO 29001:2020?

a)

To ensure that all changes are recorded for financial audits.

b)

To assess potential risks and impacts before implementing operational changes. 

c)

To increase production output.

d)

To simplify documentation requirements

11.

What is the primary purpose of conformity assessment in ISO 29001:2020?

a)

To ensure only final products are inspected before delivery.

b)

To verify that products, processes, and services meet specified requirements throughout the supply chain. 

c)

To reduce the cost of quality control activities.

d)

To allow suppliers to self-declare compliance without verification.

12.

Which of the following is NOT a valid conformity assessment activity under ISO 29001:2020?

a)

Internal audits.

b)

Third-party certification.

c)

Ignoring nonconformities if they do not affect cost. 

d)

Supplier performance evaluations.

13.

According to ISO 29001:2020, when should conformity assessment activities be conducted?

a)

Only when a customer requests it.

b)

At planned intervals or as required based on risk assessment. 

c)

After a major nonconformance is detected.

d)

Only during product design and development.

14.

During a supplier audit, you find that the external provider has changed their manufacturing process without notifying your organization. According to ISO 29001:2020 conformity assessment requirements, what should you do?

a)

Immediately disqualify the supplier.

b)

Conduct a risk assessment and request new conformity test reports to ensure compliance. 

c)

Accept the change since the supplier is ISO 9001 certified.

d)

Approve the change since not receive reject parts after change implemented

15.

Under ISO 29001:2020 clause 7.1.3.2, which of the following sets of documented information is mandatory for ensuring the reusability of service-related infrastructure?

a)
  • -Maintenance cost summary

  • -List of previous suppliers

  • -Calibration records only

b)
  • -Operator training logs

  • -Preventive maintenance schedule

  • -Insurance certificate

c)
  • -Usage history, repair/redress records, modifications

  • -Test and inspection activity records

  • -Critical spare parts list and OEM recommendations

d)
  • -Environmental risk assessment

  • -Organizational KPIs

  • -Material traceability records

16.

Under ISO 9001:2015 and ISO 29001:2020 (Clause 7.2 and 7.2.1), which of the following best fulfills the organization’s obligations for ensuring competence in roles that affect quality?

a)

The organization evaluates personnel competence through work experience and retains training attendance records for traceability.

b)

The organization ensures all employees have relevant qualifications or technical certifications before hiring, and reassesses them if nonconformities occur.

c)

The organization develops a structured competence model based on risk, applies assessments to validate proficiency levels, and keeps documented evidence of evaluation, training, and results.

d)

The organization allows department heads to approve personnel for tasks based on informal interviews, documented team experience, and familiarity with the company’s procedures.

17.

According to ISO 29001:2020 Clause 8.1, which of the following best describes the purpose of a quality plan, service quality plan, or inspection and test plan?

a)

They serve as general guidelines for the quality policy and objectives of the organization and are used during audits and management reviews.

b)

They are forms of documented information that outline the organization's strategic direction and are primarily used for internal resource planning.

c)

They specify the QMS processes and resources to be applied to a particular product, service, project, or contract, and act as operational-level quality control documentation.

d)

They are detailed descriptions of inspection tool calibrations and personnel qualifications, applied across all departments regardless of the contract or project.

18.

According to ISO 29001:2020 Clause 8.2.3.1.1, what is the organization required to maintain regarding requirements related to products or services?

a)

A documented list of customer complaints to identify gaps in service delivery.

b)

Documented evidence of design reviews and project-specific inspection plans.

c)

A documented procedure that defines how customer, statutory, and contractual requirements are reviewed before committing to supply.

d)

Meeting minutes from sales and operations planning (S&OP) reviews where pricing and logistics are discussed.

19.

Which of the following best demonstrates compliance with quality management expectations during the design and development of a product or service?

a)

Design activities are reviewed periodically by qualified personnel, and final results are archived for future reference.

b)

ustomer requirements are reviewed at contract award, and any risks identified are handled during production.

c)

Design and development activities are planned and controlled through documented processes, and relevant risks and opportunities are addressed throughout the design stages.

d)

Design inputs are discussed informally between departments, and corrective actions are taken if issues arise post-deployment.

20.

Which of the following best demonstrates effective control over external providers in a quality management system?

a)

The organization conducts annual supplier audits and keeps scorecards on file, regardless of the nature of the goods or services.

b)

The organization assesses supplier performance at defined intervals and tailors control measures based on the level of risk or opportunity involved.

c)

The organization approves all suppliers before purchase orders are issued and maintains a list of approved vendors updated yearly.

d)

The organization relies on procurement teams to monitor supplier issues informally and only involves quality management when problems escalate.

21.

The Quality Supervisor at a drilling contractor collects weekly NCR reports, internal audit findings, and maintenance downtime logs. These are compiled into a monthly report submitted during management review.

a)

To create training records for auditors

b)

To demonstrate QMS suitability and effectiveness

c)

To maintain supplier qualification history

d)

To prepare budgets for capital purchases

22.

The quality team at a gas plant schedules internal audits for warehouse activities every 12 months. However, after a series of delays and NCRs related to spare part inventory, they decide to audit the warehouse every quarter. What principle guided the change in audit frequency?

a)

Auditor availability

b)

Stakeholder pressure

c)

Performance results and risk level of the process

d)

Compliance with customer satisfaction surveys

23.

A maintenance team introduces a new lubrication method for rotating equipment to reduce failure rates. However, they implement it without evaluating the risks or updating procedures. What critical process did the team overlook?

a)

Preventive maintenance scheduling

b)

Supplier re-qualification

c)

Management of change process for improvements

d)

Calibration of measuring equipment

24.

During a third-party audit, a regulator asks for maintenance records tied to specific legal equipment requirements. The company has maintenance procedures but lacks records to prove compliance with the regulator’s expectations. What key requirement may not have been adequately addressed?

a)

Regular management reviews

b)

Ensuring staff competence

c)

Determining the documented information needed to meet relevant interested parties’ requirements

d)

Conducting risk assessments before operations

25.

During a project review, a nonconforming chemical valve is discovered. The site engineer assumes the QA officer will handle the incident, while QA expects operations to initiate corrective action. As a result, no one addresses the issue promptly. Which requirement was most likely not properly implemented?

a)

Defining and documenting roles, responsibilities, and authorities

b)

Performing internal audits

c)

Validating design inputs

d)

Evaluating supplier change requests

26.

A drilling services company identifies the risk of equipment failure but does not document how risks are assessed or treated. During an audit, they are unable to show the methods used to prioritize or control these risks. Which requirement is most clearly missing?

a)

Retaining audit schedules

b)

Defining techniques and tools for risk identification and mitigation

c)

Performing internal calibration

d)

Identifying learning needs of personnel

27.

An offshore maintenance supervisor changes the inspection frequency of lifting equipment without notifying the quality or safety departments. No documented risk assessment is performed. Which requirement has most clearly been violated?

a)

Supplier qualification process

b)

Calibration traceability

c)

Managing risks associated with changes

d)

Review of internal audit schedules

28.

A welding shop performs regular inspection and testing of its ventilation system. However, no one is assigned to oversee or approve maintenance records. Which required information is not properly defined?

a)

Test report format

b)

Maintenance schedule

c)

Responsible personnel for infrastructure upkeep

d)

Root cause analysis team

29.

An offshore pump fails unexpectedly. The company relied only on routine preventive maintenance but ignored performance data that showed vibration patterns worsening over time. What maintenance strategy could have prevented this failure?

a)

Corrective maintenance

b)

Predictive maintenance

c)

Reactive maintenance

d)

Random inspection

30.

An oilfield service team uses a torque wrench brought from a personal toolbox. There’s no record of its calibration or inclusion in the company’s instrument register. What is the primary issue?

a)

Unauthorized use of supplier tools

b)

Uncontrolled measurement resource not covered under documented process

c)

Failure to perform material traceability

d)

Lack of supplier communication

31.

A torque wrench used in assembling pressure vessels fails calibration one week after a batch of products was released. No one checks if affected units are impacted. What must the organization do under ISO 29001?

a)

Recalibrate the tool and log it internally

b)

Notify the customer and retain documented action taken

c)

Only document tool failure if the customer complains

d)

Destroy all product records related to the batch

32.

A subcontractor crew is assigned to install high-pressure valves on an offshore platform. They are not briefed on specific safety mitigations for the risk of over-torquing. According to ISO 29001, what is missing from the organization’s process?

a)

Provision of torque limiters

b)

Awareness of regulated and risk mitigation requirements

c)

Traceability of measurement tools

d)

Identification of external providers

33.

A design engineer finalizes the drawing for a pressure vessel using ASME Section VIII. However, recent errata published by ASME modifies the calculation method — and it was not reviewed or applied. What is the most likely consequence of not addressing the errata?

a)

Poor change control

b)

Failure to maintain design traceability

c)

Failure to integrate external specification changes into processes

d)

Incorrect equipment tagging

34.

An organization applies the same low-level controls to all suppliers — regardless of whether they are critical (e.g., wellhead OEMs) or non-critical (e.g., office suppliers). What ISO principle is being violated?

a)

Principle of impartiality

b)

Principle of impartiality

c)

Risk-based adjustment of external provider controls

d)

Internal audit rotation