Permit to Work Quiz

Total questions: 102

Worksheet time: 51mins

Name
Class
Date
1.

If the permit issuer must leave the permit control Centre, he must transfer the authority to another authorized person present there.

a)

True

b)

False

2.

The minimum width for one way traffic is meters

a)

2

b)

3

c)

4

d)

5

3.

The permit to work system is intended to ensure________________________

a)

Personnel Safety

b)

Environmental Safety

c)

Plant & equipment integrity

d)

All the above

4.

A Drawing/Sketch of proposed site must be attached with excavation notification.

a)

To identify underground/aboveground service

b)

As a substitute for Excavation checklist

c)

Both a & b

d)

No need to attach a drawing or sketch

5.

Who supervises the work at worksite

a)

Permit Issuer

b)

Permit applicant

c)

Work site Supervisor

d)

Safety officer

6.

Road closure and temporary diversions must be communicated by the team through postmaster at least days in advance

a)

2

b)

5

c)

7

d)

14

7.

How many manual works permit copies are needed?

a)

1

b)

2

c)

3

d)

4

8.

Switching over equipment from operational mode to standby mode is a routine activity

a)

True

b)

False

9.

Which of below is not energy isolating devices

a)

A manually operated electric circuit breaker

b)

A Disconnecting switch

c)

Cut-out Fuse

d)

Push buttons

10.

Koc work permit procedure shall be applicable to contractor owned facilities (such as EPF/GSF)

a)

True

b)

False

11.

What are the hazards that may be encountered while excavating or working inside trench

a)

Cave-in

b)

Accidental fall of personnel

c)

Flammable Gas

d)

All the above

12.

Who ensures the safe preparation of worksite

a)

Work site supervisor

b)

Permit issuer

c)

Permit Applicant

d)

None of the above

e)

Option 3

13.

A zone in which a flammable atmosphere is likely to occur in normal operation (Typically 10 to 1000 hrs./years) is known as

a)

Zone -0 Hazardous Area

b)

Zone -1 Hazardous Area

c)

Zone -2 Hazardous Area

d)

None of the above

14.

The permit issuer does not apply lock on energy isolating device to secure electrical isolation of the equipment or machines.

a)

True

b)

False

15.

The Equipment instrument or Electrical power supply can be isolated by

a)

Any person associated with the work

b)

Work site Supervisor

c)

Nominated and authorized person only

d)

None of the above

16.

How often should you inspect your PPE to ensure it's in good condition and functioning properly

a)

Before each use

b)

Once a week

c)

Once a month

d)

Once in year

17.

Gas tests area mandatory prior to authorizing

a)

Hot work

b)

Confined space entry

c)

vehicle/mobile plant entry -permits

d)

All the above

18.

..........is the device that uses a positive means such as lock to hold an energy isolating device in a safe position

a)

Lock out device

b)

Isolation Device

c)

De-energized device

19.

Maximum LEL (Lower explosive Limit) permissible for authorized hot work is

a)

25%

b)

50%

c)

0%

d)

10%

20.

Facility inspection equipment testing and maintenance are non-routine activities

a)

True

b)

False

21.

For which permit can the worksite supervisor leave the worksite if the permit applicant & permit issuer agrees to it?

a)

Radiograph work

b)

confined Space

c)

Cold work

d)

Hot work

22.

Identify a manual handling activity from the following

a)

Forklift operation

b)

Manual Lifting

c)

Lifting by crane

d)

using hand tools

23.

On completion of work, is it to be ensured that?

a)

All tools and equipment have been removed as well as housekeeping competed, and work site has been visited by permit issuer & permit applicant

b)

All isolation is removed, system/equipment purged and commissioned as necessary

c)

Both above

d)

None of the above

24.

For excavation deeper than ____ a Confined Space entry permit is required

a)

1000mm

b)

1200mm

c)

1500mm

d)

2000mm

25.

An authorized entrant is person stationed outside to confined space to monitor activities

a)

True

b)

False

26.

Oxygen cylinders in storage shall be separated from fuel-gas cylinder or combustible materials (Especially oil or grease) to a minimum distance of or by a noncombustible barrier at least 5 feet (1.5m) high having a fire resistance rating of at least one-half hour

a)

2 meters

b)

6.1 meters

c)

10 meters

d)

20 meters

27.

Who shall also keep a record of person entering/exciting the confined space

a)

Worksite Supervisor

b)

Foreman

c)

Banksman

d)

Standby man

28.

When should a fire watch be assigned

a)

For gas testing

b)

For high-Risk job

c)

For any hot job

d)

During emergencies at site

29.

Cold work permit has checklist for filling by issuer for?

a)

Protective and safety equipment

b)

Hazards

c)

Precautions required

d)

All the above

30.

Any person can advise to stop the work if they observe any hazard or potentially hazardous condition.

a)

True

b)

False

31.

What are the potential hazards while performing lifting operation?

a)

Falling object

b)

Collapse lift equipment due to overload

c)

Overturning of the crane

d)

All the above

32.

Paint spraying and hand painting are not allowed during performance of the _______

a)

Cold work

b)

Hot Work

c)

Vehicle/mobile plant entry

d)

All the above

33.

Cold work permits never required gas testing

a)

True

b)

False

34.

Work permits that may interact or affect one another are cross-referenced clearly by

a)

Worksite Supervisor

b)

Permit Applicant

c)

Permit Issuer

d)

All the Above

35.

At what decibels or more hearing protection devices are used?

a)

80

b)

85

c)

90

d)

100

36.

Operator - II is authorized to issue cold work permit only

a)

True

b)

False

37.

On completion of work the de-isolation must be carried out by nominated & authorized personnel only

a)

True

b)

False

38.

Ventilation of confined space can be achieved by means of

a)

Air Blowers

b)

Blinding

c)

Draining

d)

All the above

39.

What is the TLV of carbon monoxide (CO)?

a)

10 PPM

b)

20 PPM

c)

25 PPM

d)

0.5 PPM

40.

What is the PPE required for grinding other than mandatory PPE

a)

Face mask

b)

Face Shield & Googles

c)

SCBA

d)

Earmuff

41.

Grinding wheel can be stored in

a)

Moisture area

b)

Dry Atmosphere

c)

Sandy Area

d)

Oily Area

42.

Who should understand the limitations and restrictions of the work permit in order that work may proceed safely?

a)

Permit Applicant

b)

Worksite Supervisor

c)

Permit Issuer

d)

All the above

43.

An appropriate Landing Place of adequate size and strength shall be provided at every ______of vertical climb for the means of access when working at height

a)

1.8 feet

b)

2 feet

c)

9 feet

d)

20 feet

44.

Access & egress to excavation can be provided by means of

a)

Ladder

b)

Ramp

c)

Stairway

d)

All the above

45.

What is the maximum supply voltage allowed for a portable hand lamp inside confined space

a)

24V

b)

12V

c)

36V

d)

48V

46.

In which situation is a chin strap for a helmet compulsory?

a)

In high windy weather

b)

Working at height

c)

C) Option b)

d)

All the above

47.

Prior to Authorizing or starting Radiography work?

a)

three-dimensional control area shall be designated and marked by barriers

b)

All non-Affected people must vacate the area

c)

All Other permits within the controlled area or as specified by permit issuer shall be suspended

d)

All the above

48.

What is the minimum distance required to place excavated material from the edge of the excavation (for excavation up to 1.2 meter)

a)

1m

b)

1.2m

c)

1.8m

d)

2m

49.

Who issues the work permit authorization card

a)

Safety Team

b)

Concerning Controlling Team

c)

Asset/Directorate HSE Team

d)

None of the above

50.

-------- is responsible for satisfactory handover of the worksite.

a)

Permit Applicant

b)

Permit issuer

c)

Work site supervisor

d)

All the above

51.

In oil & gas Industry, gas tests are carried out to determine the presence of the following gases

a)

Oxygen

b)

Flammable gas

c)

H2S

d)

All the above

52.

All work permits associated with the same work or equipment must not be cross referenced by mentioning the work permit in the box provided on each permit

a)

True

b)

False

53.

What is an eWP

a)

It is an electronic workflow system for the permit to work progress

b)

It is electronic management of material stock

c)

Is only database of work permit

d)

None of the above

54.

A Hot Work Permit is required for:

a)

Welding

b)

Cutting

c)

Grinding

d)

Any work involving a source of ignition, or a spark potential

55.

Paint Spraying or Hand Painting is not permitted during:

a)

A Dangerous situation within the Plant

b)

Radiography Work

c)

Hot Work

d)

All the above

56.

Equipment and Vessels must be.......................... before entering:

a)

Gas freed & purged

b)

Drained & vented

c)

Isolated and blinded.

d)

All the above

57.

Equipment to be worked on must be properly prepared, such as:

a)

Positively isolated from all sources of energy

b)

Depressurized, Decontaminated, Flushed or Purged as per the work requirements

c)

Valves Isolated and Vents / Drains kept open / closed must be marked on the P&ID

d)

All the above

58.

A person working inside a vessel must wear a .......................so that man Standby Man outside the vessel can keep in contact with him:

a)

Mask

b)

Lifeline

c)

Helmet

d)

Boiler Suit

59.

A Self-Contained Breathing Apparatus (SCBA) shall be used where there may be:

a)

High concentrations of a toxic substance

b)

An Oxygen deficient atmosphere

c)

An Environment considered hazardous to life

d)

All the above

60.

Heavy lifting with Cranes in a hazardous area will require:

a)

No permit

b)

A Hot Work permit

c)

A Cold Work permit

d)

All the above

61.

Scaffolding work in a hazardous area will require:

a)

No permit

b)

A Hot Work permit

c)

A Cold Work permit

d)

All the above

62.

Work involving the use of a Radioactive source will require:

a)

No permit

b)

A Hot Work permit

c)

A Cold Work permit

d)

A Radiography permit

63.

In the event of a dangerous situation occurring at the Worksite or adjacent facilities:

a)

The work must stop immediately

b)

The workers shall report to their designated Assembly Points, after making the worksite safe

c)

The work will not be re-commenced until cleared to do so by the Permit Issuer

d)

All the above

e)

There is no need to stop working

64.

When noticing a potential hazard, the work can be stopped by:

a)

The Permit Applicant or the Permit Issuer

b)

Personnel from the Fire Team, HSE Team or Safety Team

c)

Any person can advise stopping work on noticing a hazard or potentially hazardous condition

d)

No one can stop the work

65.

The Equipment, Instrumentation or Electrical Power supply can be isolated by:

a)

Any person associated with the work

b)

A nominated and authorized person only

c)

There is no need to carry out such isolation

d)

The Worksite Supervisor

66.

Gas Tests shall be conducted using:

a)

An appropriate, duly calibrated and reliable gas detector

b)

By observing the smell of gas in the work area

c)

Any gas detector irrespective of its duty

d)

None of the above

67.

Gas Tests shall be carried out prior to authorizing:

a)

Hot Work / Cold Work Permit

b)

A Confined Space Entry Permit

c)

A Vehicle or Mobile Plant Entry Permit

d)

All the above

68.

The Worksite where Hot Work is to be carried out shall have a minimum of:

a)

2 Fire Extinguishers (9 kg capacity if Monnex, 12 kg capacity if DCP)

b)

A 2.5-inch diameter Fire Hose, connected to a Fire Hydrant and pressurized

c)

Both above

d)

Any of the above

69.

Excavation Work below 1.2 meters in depth will additionally require a Confined Space Entry Permit:

a)

True

b)

False

70.

A drawing / sketch of a proposed worksite must be attached to the Excavation Notification:

a)

To identify underground / aboveground services

b)

To specify the required precautions

c)

To assess the potential hazards

d)

All the above

e)

There is no need to attach a drawing / sketch

71.

A Confined Space must be positively isolated from all processes & utility systems by:

a)

Blanking or Spading

b)

Disconnecting lines and blanking open ends

c)

Any of the above

d)

There is no need to isolate

72.

Prior to authorizing or starting Radiography Work:

a)

A three-dimensional control area shall be designated and marked by Barriers and Radiation signs

b)

All non-classified people must vacate the area

c)

All other Work Permits within the controlled area, or as specified by the Permit Issuer, shall be suspended

d)

All the above

73.

Work Permit can be authorized by:

a)

Any person associated with the work

b)

The Permit Applicant

c)

The Permit Issuer / Asset Owner (as instructed in the Fire & Safety Regulations)

d)

The Worksite Supervisor

74.

An authorized Work Permit can be endorsed by:

a)

Any person associated with the work

b)

The Person (Shift Controller / Asset Owner) as instructed in the Fire & Safety Regulations

c)

An authorized Gas Tester

d)

There is no need to endorse the Permit

75.

On completion of the work, it is to be ensured that:

a)

All Tools and Equipment have been removed as well as housekeeping completed, and the worksite has been visited by the Permit Issuer and Permit Applicant

b)

All Isolations have been removed, and the system / equipment purged and commissioned as necessary

c)

Both above

d)

None of the above

76.

Hot Work Permit is required for-

a)

Welding

b)

Burning

c)

Grinding

d)

Any work involving source of ignition or spark potential work

77.

Spray Painting or hand painting is not permitted during:

a)

Dangerous situation in the plant

b)

Radiography Work

c)

Hot Work

d)

All the above

78.

Equipment to be worked must be prepared properly such as -

a)

Positively isolated from all sources of energy.

b)

Depressurized, de-contaminated, flushed or purged as per job requirement

c)

Isolated Valves, spades & Vent or Drain kept open / close must be marked on P&ID

d)

All the above

79.

Which of the following is/are true regarding the gas test for permitting the work-

a)

Prior to starting work activity in each shift.

b)

Prior to work start after any break or interruption of work.

c)

Gas test as per frequency mentioned in the work permit.

d)

All the above

e)

A and C only

80.

The frequency of inspection and certification of the erected Scaffold should be-

a)

One month from the day of earlier inspection and certification

b)

Every day

c)

Once a week

d)

No need for further inspection and certification

81.

A work involving use of radioactive sources will require -

a)

No permit

b)

Hot work permit

c)

Cold Work permit

d)

Radiography Permit

82.

In case of dangerous situation at worksite or adjacent facilities -

a)

The work must stop immediately

b)

The workers shall report to the designated Assembly Point after making the worksite safe.

c)

The work will not commence until it is cleared up to do so by the Permit Issuer.

d)

All the above

e)

No need to stop working

83.

Noticing a potential hazard, the work can be stopped by -

a)

Permit Applicant or Permit Issuer

b)

Personnel from Fire Team, HSE Team or Safety Team

c)

Any person can stop working, noticing a potentially hazardous condition.

d)

No one can stop the work

84.

The equipment, instrumentation or electrical power supply can be isolated by -

a)

Any person associated with work.

b)

Nominated & authorized person only

c)

No need to carry out such isolation.

d)

Worksite Supervisor

85.

Gas test shall be carried out prior to authorizing -

a)

Hot work permit / Cold Work Permit

b)

Confined Space Entry

c)

Vehicle or Mobile Plant Entry

d)

Process override

e)

a), b) and c) above

86.

The worksite where hot work is to be carried out should have minimum -

a)

Two fire extinguishers of 9 Kg capacity. Monnex / 12 Kg. DCP

b)

2 %" diameter duly pressurized water hose connected to fire hydrant.

c)

a trained and certified Fire watch

d)

only a) and b)

e)

a), b) and c)

87.

Excavation work below 1.2-meter depth will additionally require 'Confined Space Entry Permit'

a)

True

b)

False

88.

The Confined space must be positively isolated from all processes & utility system by -

a)

Blanking or spading

b)

Disconnecting the lines and blanking open end

c)

Only shutting the valve

d)

a) and b) above

e)

All the above

89.

The confined space must be tested prior to entry into any vessel:

a)

Oxygen

b)

Flammable vapors

c)

Toxic gases

d)

b) and c) only

e)

a), b) and c) only

90.

Work Permit can be authorized by –

a)

Any person associated with work

b)

Permit Applicant

c)

Permit Issuer / Asset Owner as instructed in KOC Permit to Work Procedure.

d)

Worksite Supervisor

91.

An authorized work permit can be endorsed by

a)

Any person associated with work

b)

Person (shift controller / asset owner) as instructed in KOC Permit to Work Procedure.

c)

By authorized gas tester

d)

No need to endorse the permit

92.

On Completion of Work - it is to be ensured that

a)

All tools & equipment have been removed as well as housekeeping completed, and worksite has been visited by Permit Issuer & Permit Applicant.

b)

All isolations are removed, system / equipment purged and commissioned as necessary.

c)

Work permit signed off.

d)

a) and c)

e)

a), b) and c)

93.

What is the validity period of a vehicle entry permit?

a)

Valid for one day/shift.

b)

Valid for a maximum of seven days.

c)

Valid for the same period the associated Cold or Hot PTW is valid for.

d)

Validity is determined by PTW Applicant.

94.

What is the validity period of a mobile plant entry permit?

a)

Valid for one day/shift.

b)

Valid for 7 consecutive working days from the date of issue

c)

Valid for the same period the associated Cold or Hot PTW is valid for.

d)

Validity is determined by PTW Applicant.

95.

Gas testing required for coldwork permit

a)

True

b)

False

96.

Who is responsible for making changes /closing permits?

a)

PTW Issuer.

b)

PTW Applicant.

c)

PTW Holder

d)

Safety Engineer

97.

If changes or modification in PTW will the PTW closed

a)

True

b)

False

98.

Who is the authority in PTW other than permit applicants and issuer?

a)

PTW Holder (WSS)

b)

Safety officer

c)

PTW coordinator

d)

Safety engineer

99.

PPE is required other than mandatory PPE for grinding works.

a)

Coverall

b)

Face Shield/Goggles.

c)

Earmuff.

d)

Helmet

100.

Radiography allowable limit for whole body is.

a)

20 mSv/year

b)

10msv/year

c)

2000 mrem

d)

Both (a) and (c)

101.

How many fire extinguishers are kept along with equipment (air compressor, welding machine etc.,

a)

1

b)

2

c)

3

d)

4

102.

Safe distance maintains during hot work

a)

5 meters.

b)

1 meter.

c)

6 meters.

d)

10 meters.