unit NETK3-03 slides 8-16

Total questions: 30

Worksheet time: 15mins

Name
Class
Date
1.

Which UK law requires employers to protect the health, safety, and welfare of employees?

a)

Employment Rights Act

b)

Health and Safety at Work Act (HASAWA)

c)

Equality Act

d)

Data Protection Act

2.

The Electricity at Work Regulations (EWR) apply to:

a)

Domestic installations only

b)

Commercial installations only

c)

All aspects of electricity use in the workplace

d)

Only high-voltage systems

3.

The Construction (Design and Management) Regulations (CDM 2015) require:

a)

Only electricians to be responsible for safety

b)

Roles such as Principal Designer and Principal Contractor

c)

No documentation

d)

The use of only BS EN standards

4.

Which regulation governs the safe design and installation of UK electrical wiring?

a)

CDM 2015

b)

IEC 60617

c)

BS 7671 (The Wiring Regs)

d)

Human Rights Act

5.

Which act protects personal data used by organisations?

a)

Employment Rights Act

b)

Data Protection Act 2018

c)

Equality Act 2010

d)

EWR

6.

Which act protects individuals from unfair dismissal and redundancy issues?

a)

Employment Rights Act

b)

HASAWA

c)

GDPR

d)

BS 3939

7.

What is a key responsibility of apprentices on-site?

a)

To lead all contract discussions

b)

To work responsibly, respectfully, and as part of the team

c)

To sign variation orders

d)

To produce Gantt charts

8.

All staff on-site should strive to be:

a)

Creative, innovative, flexible

b)

Confident, strong, ambitious

c)

Polite, punctual, prepared

d)

Quiet, cautious, careful

9.

When changes are made to contract specifications, they must:

a)

Be ignored unless urgent

b)

Be signed off by relevant parties

c)

Be implemented immediately

d)

Only involve the main contractor

10.

A variation order is defined as:

a)

A delay notice issued to the client

b)

A written agreement to change the original contract

c)

An oral agreement to reduce labour

d)

A financial penalty

11.

Which of these is NOT a typical reason for contract changes?

a)

Incorrect drawings

b)

Client requests

c)

Material shortages

d)

Worker lateness

12.

What is a daywork sheet used for?

a)

Recording health & safety risks

b)

Recording extra work outside the contract

c)

Checking site attendance

d)

Reviewing project deadlines

13.

Hazardous installations include:

a)

Domestic houses

b)

Petrol stations

c)

Small offices

d)

Shops

14.

Which of the following requires specialist installation knowledge?

a)

Garden lighting

b)

Home Wi-Fi systems

c)

X-ray rooms in hospitals

d)

General sockets

15.

A schedule of works is used to:

a)

Monitor site attendance

b)

Capture and price project tasks

c)

Order electrical equipment

d)

Create safety procedures

16.

Work completion means:

a)

Starting electrical work

b)

Agreeing on deadlines

c)

Fulfilment of all contractual obligations

d)

Paying subcontractors

17.

Which of these affects estimated work completion time?

a)

Client reputation

b)

Weather forecasts only

c)

Workforce size and experience

d)

Number of supervisors

18.

Why should work be broken into sets and quantified?

a)

To avoid penalties

b)

To allow concurrent working by teams

c)

To reduce workforce

d)

To reduce costs

19.

Not meeting contract deadlines is considered a:

a)

Safety breach

b)

Breach of contract

c)

Site rule violation

d)

Planning delay

20.

Clients may claim compensation for project delays through:

a)

Variation orders

b)

Liquidated damages

c)

Risk assessments

d)

Daywork sheets

21.

What incentive may contractors have for early completion?

a)

Extra holidays

b)

Bonus payments

c)

Reduced material costs

d)

Shorter working days

22.

The most common method to illustrate work programmes is:

a)

Risk matrix

b)

Gantt chart

c)

Health & safety checklist

d)

Daywork sheet

23.

Critical Path Analysis (CPA) identifies:

a)

Material suppliers

b)

The shortest project completion time

c)

Health & safety hazards

d)

Workforce disputes

24.

Which project tool helps plot progress for meetings?

a)

Equality Act

b)

Programme of work

c)

Variation order

d)

Daywork sheet

25.

Key resource planning considerations include:

a)

Client disputes

b)

Variation orders

c)

Secure storage and welfare facilities

d)

Early completion bonuses

26.

Site welfare facilities should be based on:

a)

Type of wiring system

b)

Number of staff expected on-site

c)

Availability of scaffolding

d)

Capital equipment delivery times

27.

What must be checked at material delivery?

a)

Employee attendance

b)

Quantities, specification, and quality

c)

Workforce disputes

d)

CPA float times

28.

How can material losses on-site be minimised?

a)

Order double stock

b)

Store everything outdoors

c)

Use secure lock-up compounds

d)

Only order from local suppliers

29.

Why should capital equipment be delivered only when the area is ready?

a)

To ensure overtime costs

b)

To allow immediate payment

c)

To prevent damage and delays

d)

To reduce labour needs

30.

Local suppliers are preferred because:

a)

They are always cheaper

b)

They provide better quality

c)

They can deliver quickly and reduce environmental impact

d)

They always include labour