wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

VSM Process Improvement Quiz

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

What does VSM stand for in the context of process improvement?

a)

Value Stream Mapping

b)

Visual System Management

c)

Variable Supply Method

d)

Verified Service Model

2.

What is the primary purpose of using VSM?

a)

To continuously improve products/services to meet or exceed customer expectations

b)

To increase the number of suppliers

c)

To reduce the number of employees

d)

To eliminate all production planning

3.

Which element is NOT part of the value stream cycle?

a)

Flow

b)

Pull

c)

Value

d)

Delay

4.

What is the formula for Cycle Time (CT) as described in the VSM Dotting Process and Keynotes?

a)

Process Time + Waiting Time

b)

Waiting Time - Process Time

c)

Process Time x Waiting Time

d)

Process Time / Waiting Time

5.

What is the main goal of moving from the Current to the Future state in Value Stream Mapping?

a)

A) To reduce Non-Value Added activities and rework

b)

B) To increase the number of processes

c)

C) To lengthen the lead-time

d)

D) To add more Value Added activities

6.

What does FIFO stand for in the context of supermarket material flow?

a)

First In, First Out

b)

Fast Inventory For Operations

c)

Final Input, Final Output

d)

Frequent Inspection For Organization

7.

In which supermarket type is material controlled by location and there is high part count and build volatility?

a)

High Volume

b)

Box Build/Configuration

c)

Low Volume OR NPI

d)

High Utilization

8.

Compare the replenishment strategies between High Volume and Box Build/Configuration supermarket types.

a)

High Volume replenishes feeders as reels empty; Box Build/Configuration replenishes line areas as required

b)

Both use replenishment cards (Kanban)

c)

Both replenish only at the end of the day

d)

High Volume does not replenish feeders

9.

Which of the following is NOT a principle of Kaizen?

a)

Take action with speed

b)

Pass a defect to the next process

c)

Apply the 3 GEN: Genchi, Genbutsu, Genjitsu

d)

Complete one task at a time

10.

At what level are Kaizen Workshops facilitated by VPs or Functional leaders at one site within a cluster, sub-region, or function?

a)

Champion Kaizen Workshop (CKW)

b)

Internal Kaizen Workshop (IKW)

c)

Small Group Activities (SGA)

d)

External Kaizen Workshop (EKW)