Business Agility Quiz
Quiz
•
Professional Development
•
Professional Development
•
Practice Problem
•
Hard
sunita samanta
Used 23+ times
FREE Resource
Enhance your content in a minute
15 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
The maximum length of the Sprint review (its time box) is :
2 hours
4 hours for a monthly Sprint.For shorter Sprints it is usually shorter
As long as needed
1 day
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which is the first thing does the development team do during the first Sprint
Deliver an increment of potentially releasable software
Determine the complete architecture and infrastructure for the product
Create the complete product backlog to be developed in subsequent Sprints
Develop a plan for the rest of the release
3.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
When is a Sprint over?
When all product backlog items meet their definition of done
When the product owner says it is done
When all the tasks are completed
When the time-box expires
4.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
What is the major challenge when multiple feature teams work on the same product backlog
Making sure there’s enough work for everyone in the team
Minimizing dependencies between teams
Meeting original scope projections
None of the Above
5.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
What does technical debt mean in software development
It reflects the sloppy code, dirty hacks, and unreadable code
It reflects the implied cost of additional rework caused by choosing an easy solution now instead of using a better approach that would take longer.
All of the above
None of the Above
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Test Driven Development (TDD) involves creating tests and code almost simultaneously, while constantly improving the design.
Many Agile developers believe TDD helps ensure correct implementation while reducing the cost of change. Is TDD part of Scrum?
Yes - Scrum is a complete methodology containing everything you need to succeed
No - Scrum is only a feedback framework. It does not specify particular technical practices
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Some Scrum teams fully embrace Agile technical practices. How often do these teams typically should integrate their work and re-run their regression tests?
Only at the end of each sprint
Once per day
Once per night
Continuously as things change, potentially many times per day
Create a free account and access millions of resources
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
15 questions
5S Concepts Quiz
Quiz
•
Professional Development
15 questions
Accepting Change Quiz
Quiz
•
Professional Development
15 questions
Breakthrough Performance
Quiz
•
Professional Development
17 questions
Differentiate between LO and LE
Quiz
•
Professional Development
20 questions
Vocabulary: Housekeeping
Quiz
•
University - Professi...
10 questions
AWS Amazon VPC
Quiz
•
Professional Development
10 questions
Activism : Be Seen Be Heard
Quiz
•
Professional Development
15 questions
ENGLISH GRAMMAR
Quiz
•
5th Grade - Professio...
Popular Resources on Wayground
5 questions
This is not a...winter edition (Drawing game)
Quiz
•
1st - 5th Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
10 questions
Identify Iconic Christmas Movie Scenes
Interactive video
•
6th - 10th Grade
20 questions
Christmas Trivia
Quiz
•
6th - 8th Grade
18 questions
Kids Christmas Trivia
Quiz
•
KG - 5th Grade
11 questions
How well do you know your Christmas Characters?
Lesson
•
3rd Grade
14 questions
Christmas Trivia
Quiz
•
5th Grade
20 questions
How the Grinch Stole Christmas
Quiz
•
5th Grade
