Plumbing Revision

Plumbing Revision

10th Grade

15 Qs

quiz-placeholder

Similar activities

ES EOC Review 2

ES EOC Review 2

9th - 12th Grade

20 Qs

กฎของโอห์ม

กฎของโอห์ม

7th - 10th Grade

15 Qs

กฎของโอห์ม

กฎของโอห์ม

7th - 10th Grade

15 Qs

Chromatography Exam

Chromatography Exam

9th - 12th Grade

20 Qs

PLTW POE EoC Review Part 2

PLTW POE EoC Review Part 2

9th - 12th Grade

20 Qs

ALAT UKUR JANGKA SORONG DAN MICROMETER

ALAT UKUR JANGKA SORONG DAN MICROMETER

10th Grade

15 Qs

Cold Water PowerPoint 1 Worksheet

Cold Water PowerPoint 1 Worksheet

10th Grade - University

13 Qs

MUARA TIRTA - MBKM

MUARA TIRTA - MBKM

10th Grade

10 Qs

Plumbing Revision

Plumbing Revision

Assessment

Quiz

Other

10th Grade

Hard

Created by

Debra Jones

Used 70+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the abbreviation for the regulation that ensures that electrical work equipment is suitable, well maintained, and used correctly?

PUWER

POWER

POWDER

PURGE

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which organisation provides information and advice about work-related health, safety and illness? .

Health and Social Executive

Health and Safety Executive

Health and Safety Expert

Health and Social Expert

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who is responsible for providing PPE when working on site?

Employer

Main contractor

Site foreman

Client

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the correct cable colour coding used for 110 V construction site equipment?

Red

Yellow

Blue

White

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum recommended voltage for drills on site when battery powered tools are not available?

414 volts

230 volts

315 volts

110 volts

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When should ladders be considered for use on site?

Access or light work of short and if it is safe

Heavy work for long durations and if it is safe

If they are long enough to reach the access point

If they are erected at an angle 1:6.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Trenches should be excavated to what maximum depth before supports are required?

1.2 m

1.6 m

2.0 m

2.4 m

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?