Building Information Modeling Quiz 2

Building Information Modeling Quiz 2

12th Grade

35 Qs

quiz-placeholder

Similar activities

Intro to Autodesk Inventor

Intro to Autodesk Inventor

9th - 12th Grade

30 Qs

Sem 1 Engineering Final

Sem 1 Engineering Final

12th Grade

30 Qs

Computer and Control Systems

Computer and Control Systems

9th - 12th Grade

30 Qs

CNC 9-28 fun

CNC 9-28 fun

9th - 12th Grade

38 Qs

2.04 POBF Review

2.04 POBF Review

9th - 12th Grade

35 Qs

Test 1.01

Test 1.01

9th Grade - University

34 Qs

AutoCAD сұрақтары

AutoCAD сұрақтары

12th Grade

34 Qs

ACCT II REVIEW GUIDE – 1.01-1.02 GAAP & AICPA Code of Ethics

ACCT II REVIEW GUIDE – 1.01-1.02 GAAP & AICPA Code of Ethics

9th - 12th Grade

30 Qs

Building Information Modeling Quiz 2

Building Information Modeling Quiz 2

Assessment

Quiz

Other

12th Grade

Medium

Created by

Miles Tarplee

Used 9+ times

FREE Resource

35 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does Level 0 BIM represent in Building Information Modeling?

Collaboration using 3D CAD models

No collaboration, using 2D CAD working with drawings

All parties using a common 3D model in a central environment

2D CAD for drafting production information

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which level of BIM involves 2D CAD for drafting production information?

Level 0 BIM

Level 1 BIM

Level 2 BIM

Level 3D BIM

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At what level do all parties use 3D CAD models and share information through a common file format in BIM?

Level 0 BIM

Level 1 BIM

Level 2 BIM

Level 3D BIM

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the characteristic of Level 3D BIM?

No collaboration, using 2D CAD working with drawings

2D CAD for drafting production information

All parties use 3D CAD models and share information through a common file format

All parties use one shared 3D model in a central environment, editable by everyone

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

As of April 2016, what became a mandatory requirement for all publicly tendered projects in the UK?

Level 1 BIM

Level 2 BIM

Level 3 BIM

Level 4 BIM

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a stage in the BIM process according to the diagram?

Renovation

Programming

Initial Planning

Fabrication

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of scanners are used to give access to difficult locations and capture aerial imagery to generate 3D data?

Terrestrial scanners

Static reality scanners

Mobile mapping scanners

Small portable imaging scanners or drones

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?