Plumbing level 2 - PP6 - Common Processes

Plumbing level 2 - PP6 - Common Processes

University

10 Qs

quiz-placeholder

Similar activities

Teaching Strategies

Teaching Strategies

University

11 Qs

T Level BSE plumbing systems

T Level BSE plumbing systems

University - Professional Development

15 Qs

PB Color Psychology

PB Color Psychology

KG - Professional Development

12 Qs

Understanding Construction Drawings - Nr 4

Understanding Construction Drawings - Nr 4

12th Grade - University

15 Qs

SOLIDWORKS

SOLIDWORKS

University

11 Qs

Blooms/Costas/DOK

Blooms/Costas/DOK

University

15 Qs

Hydraulics week 7 2.0

Hydraulics week 7 2.0

University

15 Qs

1- Introduction to Counseling

1- Introduction to Counseling

University - Professional Development

11 Qs

Plumbing level 2 - PP6 - Common Processes

Plumbing level 2 - PP6 - Common Processes

Assessment

Quiz

Professional Development

University

Medium

Created by

Byron Morris

Used 27+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should you do before drilling to avoid hitting buried pipes or cables?

Use a magnet

Use a stud finder

Use a cable or pipe detector

Use a metal detector

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum depth of a notch in a joist?

1/2 of the joist depth

1/8 of the joist depth

1/3 of the joist depth

1/4 of the joist depth

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum permissible size for a drilled hole in a joist?

1/8 of the joist depth

1/3 of the joist depth

1/2 of the joist depth

1/4 of the joist depth

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where should a drilled hole be placed in a joist?

On the edge of the joist

Near the top of the joist

On the centre line of the joist

Anywhere in the joist

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum depth for a vertical chase in a wall?

1/6 of the wall thickness

1/3 of the wall thickness

1/4 of the wall thickness

1/2 of the wall thickness

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum depth for a horizontal chase in a wall?

1/8 of the wall thickness

1/3 of the wall thickness

1/4 of the wall thickness

1/6 of the wall thickness

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to pipework going through a masonry fabric?

It should be painted

It should be sleeved

It should be insulated

It should be glued

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?