1.

Approximately what percentage of the world's gross domestic product is spent on projects?

a)

10 percent

b)

25 percent

c)

50 percent

d)

75 percent

2.

Which of the following is not a potential advantage of using good project management?

a)

Shorter development times

b)

higher worker morale

c)

lower cost of capital

d)

higher profit margins

3.

____ is a temporary endeavor undertaken to create a unique product, service or result.

a)

program

b)

process

c)

project

d)

portfolio

4.

which of the following is not an at attribute of a project

a)

project are unique

b)

project are developed using progressive elaboration

c)

projects have a primary customer or sponsor

d)

projects involve little uncertainty

5.

Which of the following is not part of the triple constraint of project management?

a)

meeting scope goals

b)

meeting time goals

c)

meeting communications goals

d)

meeting cost goals

6.

______ is the application of knowledge, skills, tools and techniques to project activities to meet project requirements.

a)

Project management

b)

Program management

c)

Project portfolio management

d)

Requirements management

7.

Project portfolio management addresses ______ goals of an organization, while project management addresses ______ goals.

a)

strategic, tactical

b)

tactical, strategic

c)

internal, external

d)

external, internal

8.

Several application development projects done for the same functional group might best be managed as part of a ______.

a)

portfolio

b)

program

c)

investment

d)

collaborative

9.

Which of the following is not one of the top ten skills or competencies of an effective project manager?

a)

people skills

b)

leadership

c)

integrity

d)

technical skills

10.

What is the certification program called that the Project Management Institute provides?

a)

Certified Project Manager (CPM)

b)

Project Management Professional (PMP)

c)

Project Management Expert (PME)

d)

Project Management Mentor (PMM)

11.

A ______ is a series of actions directed toward a particular result.

a)

goal

b)

process

c)

plan

d)

project

12.

______ processes include coordinating people and other resources to carry out the project plans and produce the products, services, or results of the project or phase.

a)

Initiating

b)

planning

c)

executing

d)

monitoring and controlling

e)

Closing

13.

Which process group normally requires the most resources and time?

a)

Initiating

b)

Planning

c)

Executing

d)

Monitoring and controlling

e)

Closing

14.

What methodology was developed in the U.K., defines 45 separate subprocesses, and organizes these into eight process groups?

a)

Six Sigma

b)

RUP

c)

PMBOK® Guide

d)

PRINCE2

15.

Which of the following outputs is often completed before initiating a project?

a)

stakeholder register

b)

business case

c)

project charter

d)

kick-off meeting

16.

A work breakdown structure, project schedule, and cost estimates are outputs of the ______ process.

a)

initiating

b)

planning

c)

executing

d)

monitoring and controlling

e)

closing

17.

Initiating involves developing a project charter, which is part of the project ______ management knowledge area.

a)

integration

b)

scope

c)

communications

d)

risk

18.

______ involves measuring progress toward project objectives and taking corrective actions.

a)

Initiating

b)

Planning

c)

Executing

d)

Monitoring and controlling

e)

Closing

19.

What type of report do project teams create to reflect on what went right and what went wrong with the project?

a)

lessons-learned report

b)

progress report

c)

final project report

d)

business case

20.

Many people use ______ to have a standard format for preparing various project management documents.

a)

methodologies

b)

templates

c)

project management software

d)

standards

21.

________________ refer(s) to all the work involved in creating the products of the project and the processes used to create them.

a)

Deliverables

b)

Milestones

c)

Scope

d)

Product development

22.

Which tool or technique for collecting requirements is often the most expensive and time consuming?

a)

interviews

b)

focus groups

c)

surveys

d)

observation

23.

A ___________ is a deliverable-oriented grouping of the work involved in a project that defines the total scope of the project.

a)

scope statement

b)

WBS

c)

WBS dictionary

d)

work package

24.

What approach to developing a WBS involves writing down or drawing ideas in a nonlinear format?

a)

top-down

b)

bottom-up

c)

analogy

d)

mind mapping

25.

Assume you have a project with major categories called planning, analysis, design, and testing. What level of the WBS would these items fall under?

a)

0

b)

1

c)

2

d)

3

26.

Which of the following is not a best practice that can help in avoiding scope problems on information technology projects?

a)

Keep the scope realistic

b)

Use off-the-shelf hardware and software whenever possible

c)

Follow good project management processes

d)

Don t involve too many users in scope management

27.

What major restaurant chain terminated a large project after spending $170 million on it, primarily because they realized the project scope was too much to handle?

a)

Burger King

b)

Pizza Hut

c)

McDonald s

d)

Taco Bell

28.

Scope ____________ is often achieved by a customer inspection and then sign-off on key deliverables.

a)

verification

b)

validation

c)

completion

d)

close-out

29.

Which of the following is not a suggestion for improving user input?

a)

Develop a good project selection process for information technology projects

b)

Have users on the project team

c)

Co-locate users with developers

d)

Only have meetings as needed, not on a regular basis

30.

Project management software helps you develop a ___________, which serves as a basis for creating Gantt charts, assigning resources, and allocating costs.

a)

project plan

b)

schedule

c)

WBS

d)

deliverable

31.

What is the first process in planning a project schedule?

a)

defining milestones

b)

defining activities

c)

estimating activity resources

d)

sequencing activity sequencing

32.

Predecessors, successors, logical relationships, leads and lags, resource requirements, constraints, imposed dates, and assumptions are all examples of _______ .

a)

items in an activity list

b)

items on a Gantt chart

c)

milestone attributes

d)

activity attributes

33.

As the project manager for a software development project, you are helping to develop the project schedule. You decide that writing code for a system should not start until users sign off on the analysis work. What type of dependency is this?

a)

technical

b)

mandatory

c)

discretionary

d)

externa

34.

You cannot start editing a technical report until someone else completes the first draft. What type of dependency does this represent?

a)

finish-to-start

b)

start-to-start

c)

finish-to-finish

d)

start-to-finish

35.

Which of the following statements is false?

a)

A resource breakdown structure is a hierarchical structure that identifies the project s resources by category and type.

b)

Duration and effort are synonymous terms.

c)

A three-point estimate is an estimate that includes an optimistic, most likely, and pessimistic estimate

d)

A Gantt chart is a common tool for displaying project schedule information.

36.

What symbol on a Gantt chart represents a slipped milestone?

a)

a black arrow

b)

a white arrow

c)

a black diamond

d)

a white diamond

37.

What type of diagram shows planned and actual project schedule information?

a)

a network diagram

b)

a Gantt chart

c)

a Tracking Gantt chart

d)

a milestone chart

38.

___________ is a network diagramming technique used to predict total project duration.

a)

PERT

b)

A Gantt chart

c)

. Critical path method

d)

Crashing

39.

Which of the following statements is false?

a)

Growing grass was on the critical path for a large theme park project.

b)

The critical path is the series of activities that determine the earliest time by which a project can be completed.

c)

A forward pass through a project network diagram determines the early start and early finish dates for each activity.

d)

Fast tracking is a technique for making cost and schedule trade-offs to obtain the greatest amount of schedule compression for the least incremental cost.

40.

___________ is a method of scheduling that considers limited resources when creating a project schedule and includes buffers to protect the project completion date

a)

Parkinson s Law

b)

Murphy s Law

c)

Critical path analysis

d)

Critical chain scheduling

41.

_________________ is a resource sacrificed or foregone to achieve a specific objective or something given up in exchange.

a)

Money

b)

Liability

c)

Trade

d)

Cost

42.

What is the main goal of project cost management?

a)

to complete a project for as little cost as possible

b)

to complete a project within an approved budget

c)

to provide truthful and accurate cost information on projects

d)

to ensure that an organization s money is used wisely

43.

Which of the following is not a key output of project cost management?

a)

activity cost estimates

b)

a cost management plan

c)

updates to the project management plan

d)

a cost performance baseline

44.

If a company loses $5 for every $100 in revenue for a certain product, what is the profit margin for that product?

a)

-5 percent

b)

5 percent

c)

- $5

d)

$5

45.

_________________ reserves allow for future situations that are unpredictable.

a)

Contingency

b)

Financial

c)

Management

d)

Baseline

46.

You are preparing a cost estimate for a building based on its location, purpose, number of square feet, and other characteristics. What cost estimating technique are you using?

a)

parametric

b)

analogous

c)

bottom-up

d)

top-down

47.

_________________ involves allocating the project cost estimate to individual work items over time.

a)

Reserve analysis

b)

Life cycle costing

c)

Project cost budgeting

d)

Earned value analysis

48.

__________________ is a project performance measurement technique that integrates scope, time, and cost data.

a)

Reserve analysis

b)

Life cycle costing

c)

Project cost budgeting

d)

Earned value analysis

49.

If the actual cost for a WBS item is $1500 and its earned value was $2000, what is its cost variance, and is it under or over budget?

a)

the cost variance is -$500, which is over budget

b)

the cost variance is -$500, which is under budget

c)

the cost variance is $500, which is over budget

d)

the cost variance is $500, which is under budget

50.

If a project is halfway completed and its schedule performance index is 110 percent and its cost performance index is 95 percent, how is it progressing?

a)

it is ahead of schedule and under budget

b)

it is ahead of schedule and over budget

c)

it is behind schedule and under budget

d)

it is behind schedule and over budget

51.

___________ is the degree to which a set of inherent characteristics fulfils requirements.

a)

Quality

b)

Conformance to requirements

c)

Fitness for use

d)

Reliability

52.

What is the purpose of project quality management?

a)

to produce the highest quality products and services possible

b)

to ensure that appropriate quality standards are met

c)

to ensure that the project will satisfy the needs for which it was undertaken

d)

All of the above

53.

____________ generates ideas for quality improvements by comparing specific project practices or product characteristics to those of other projects or products within or outside the performing organization.

a)

Quality audits

b)

Design of experiments

c)

Six Sigma

d)

Benchmarking

54.

What tool could you use to see if there is a relationship between two variables?

a)

a cause-and-effect diagram

b)

a control chart

c)

a run chart

d)

a scatter diagram

55.

What tool can you use to determine whether a process is in control or out of control?

a)

a cause-and-effect diagram

b)

a control chart

c)

a run chart

d)

a scatter diagram

56.

Six Sigma s target for perfection is the achievement of no more than ________ defects, errors, or mistakes per million opportunities.

a)

6

b)

9

c)

3.4

d)

1

57.

The seven run rule states that if seven data points in a row on a control chart are all below the mean, above the means, or all increasing or decreasing, then the process needs to be examined for ___________ problems.

a)

random

b)

non-random

c)

Six Sigma

d)

quality

58.

What is the preferred order for performing testing on information technology projects?

a)

unit testing, integration testing, system testing, user acceptance testing

b)

unit testing, system testing, integration testing, user acceptance testing

c)

unit testing, system testing, user acceptance testing, integration testing

d)

unit testing, integration testing, user acceptance testing, system testing

59.

______________is known for his work on quality control in Japan and developed the 14 Points for Management in his text Out of the Crisis.

a)

Juran

b)

Deming

c)

Crosby

d)

Ishikawa

60.

PMI s OPM3 is an example of a model or framework for helping organizations improve their processes and systems.

a)

benchmarking

b)

Six Sigma

c)

maturity

d)

quality

61.

Which of the following is not part of project human resource management?

a)

Resource estimating

b)

Acquiring the project team

c)

Developing the project team

d)

Managing the project team

62.

___________ causes people to participate in an activity for their own enjoyment.

a)

Intrinsic motivation

b)

Extrinsic motivation

c)

Self motivation

d)

Social motivation

63.

At the bottom of Maslow s pyramid or hierarchy of needs are ___________ needs.

a)

self-actualization

b)

esteem

c)

safety

d)

physiological

64.

According to McClelland s acquired needs theory, people who desire harmonious relations with other people and need to feel accepted have a high __________ need.

a)

social

b)

achievement

c)

affiliation

d)

extrinsic

65.

___________ power is based on a person s individual charisma.

a)

Affiliation

b)

Referent

c)

Personality

d)

Legitimate

66.

A ___________ maps the work of a project as described in the WBS to the people responsible for performing the work.

a)

project organizational chart

b)

work definition and assignment process

c)

resource histogram

d)

responsibility assignment matrix

67.

A staffing management plan often includes a resource __________, which is a column chart that shows the number of resources assigned to the project over time.

a)

chart

b)

graph

c)

histogram

d)

timeline

68.

What technique can you use to resolve resource conflicts by delaying tasks?

a)

resource loading

b)

resource leveling

c)

critical path analysis

d)

overallocation

69.

What are the five stages in Tuckman s model of team development, in chronological order?

a)

forming, storming, norming, performing, and adjourning

b)

storming, forming, norming, performing, and adjourning

c)

norming, forming, storming, performing, and adjourning

d)

forming, storming, performing, norming, and adjourning

70.

Which of the following is not a tool or technique for managing project teams?

a)

observation and conversation

b)

project performance appraisals

c)

issue logs

d)

Social Styles Profile

71.

What do many experts agree is the greatest threat to the success of any project?

a)

lack of proper funding

b)

a failure to communicate

c)

poor listening skills

d)

inadequate staffing

72.

Which communication skill is most important for information technology professionals for career advancement?

a)

writing

b)

listening

c)

speaking

d)

using communication technologies

73.

Which of the following is not a process in project communications management?

a)

information planning

b)

information distribution

c)

performance reporting

d)

managing stakeholders

74.

What popular book illustrates the concept that people are not interchangeable parts and uses the analogy that you cannot take nine women and produce a baby in one month?

a)

Covey s 7 Habits of Highly Effective People

b)

Goldratt s Critical Chain

c)

Gates s Business @ the Speed of Thought

d)

Brooks s The Mythical Man-Month

75.

If you add three more people to a project team of five, how many more communications channels will you add?

a)

2

b)

12

c)

15

d)

18

76.

A ________________ report describes where the project stands at a specific point in time.

a)

status

b)

performance

c)

forecast

d)

earned value

77.

What tool can you use to help manage stakeholders by ranking scope, time, and cost goals in order of importance and provide guidelines on balancing these constraints?

a)

triple constraint matrix

b)

expectations matrix

c)

issue log

d)

priority log

78.

You have two project stakeholders who do not get along at all. You know they both enjoy traveling, so you discuss great travel destinations when they are both in the room together to distract them from arguing with each other. What conflict-handling mode are you using?

a)

confrontation

b)

compromise

c)

smoothing

d)

withdrawal

79.

Which of the following is not a guideline to help improve time spent at meetings?

a)

Determine if a meeting can be avoided.

b)

Invite extra people who support your project to make it run more smoothly.

c)

Define the purpose and intended outcome of the meeting.

d)

Build relationships.

80.

A ________________ report is a reflective statement documenting important things that people learned from working on the project.

a)

final project

b)

lessons-learned

c)

project archive

d)

progress

81.

_____________ is an uncertainty that can have a negative or positive effect on meeting project objectives.

a)

Risk utility

b)

Risk tolerance

c)

Risk management

d)

Risk

82.

A person who is risk-_____________ receives greater satisfaction when more payoff is at stake and is willing to pay a penalty to take risks.

a)

averse

b)

seeking

c)

neutral

d)

aware

83.

Which risk management process involves prioritizing risks based on their probability and impact of occurrence?

a)

planning risk management

b)

identifying risks

c)

identifying risks

d)

performing quantitative risk analysis

84.

Your project involves using a new release of a common software application, but if that release is not available, your team has _____________ plans to use the current release.

a)

contingency

b)

fallback

c)

reserve

d)

mitigation

85.

Which risk identification tool involves deriving a consensus among a panel of experts by using anonymous input regarding future events?

a)

risk breakdown structure

b)

brainstorming

c)

interviewing

d)

Delphi technique

86.

A risk _____________ is a document that contains results of various risk management processes, often displayed in a table or spreadsheet format.

a)

management plan

b)

register

c)

breakdown structure

d)

probability/impact matrix

87.

_____________ are indicators or symptoms of actual risk events, such as a cost overrun on early activities being a symptom of poor cost estimates.

a)

Probabilities

b)

Impacts

c)

Watch list items

d)

Triggers

88.

Suppose there is a 30 percent chance that you will lose $10,000 and a 70 percent chance that you will earn $100,000 on a particular project. What is the project s estimated monetary value?

a)

-$30,000

b)

$70,000

c)

$67,000

d)

-$67,000

89.

_____________ is a quantitative risk analysis tool that uses a model of a system to analyze the expected behavior or performance of the system.

a)

Simulation

b)

Sensitivity analysis

c)

Monte Carlo analysis

d)

EMV

90.

Your project team has decided not to use an upcoming release of software because it might cause your schedule to slip. Which negative risk response strategy are you using?

a)

avoidance

b)

acceptance

c)

transference

d)

mitigation

91.

Understanding the culture, policies, and procedures of the organization in which the project is being performed is most challenging in

a)

Global organi'tations

b)

Manufacturing organizations

c)

Small organizations

d)

Agile organ1zat1ons

92.

A project team is discussing the benefits and drawbacks of working on projects within their organization now that it has become project oriented. they can agree on many advantages for the team and for the organization, but also agree there are some drawbacks relative to the strong matrix structure the organization used to have, ln a project-oriented organization, the project team:

a)

Reports to many bosses

b)

Has no loyalty to the project

c)

Reports to the functional manager

d)

Will not always have a uhomer

93.

A project manager is trying to complete a software development project, but cannot get enough attention for the project. Resources are focused on completing process-related work, and the project manager has little authority to assign resources. What form of organization must the project manager be working in ?

a)

Functional

b)

matrix

c)

expediter

d)

coordinator

94.

A project manager has little project experience, but she has been assigned as the project manager of a new project. Because she will be working in a matrix organization to complete her project, she can

expect communications to be:

a)

Simple

b)

Open and accurate

c)

Complex

d)

Hard to au tomate

95.

A project team member is talking to another team member and complaining that many people are asking him to do things. If he works in a functional organization, who has the power to give direction

to the team member?

a)

the project manager

b)

The functional manager

c)

The team

d)

The PMO

96.

Two project managers have just realized that they are in a weak matrix organization and that their power as project managers is quite limited. One figures uut that he is really a project expediter, and the other realizes she is really a project coordinator. How is a project expediter different from a project coordinator?

a)

The project expediter cannot make decisions

b)

The project expediter can make more decisions.

c)

The project expediter reports to a higher-level manager.

d)

The project expediter bas some authority.

97.

Who has the most power in a project-oriented organization?

a)

the project manager

b)

the functional manager

c)

The team

d)

they all share power

98.

All the following are characteristics of a project except:

a)

It is temporary.

b)

It has a definite beginning and end.

c)

lt has interrelated activities.

d)

it repeats itself every month.

99.

A framework for keeping an organization focused on its overall strategy is:

a)

Organizational project management

b)

the PM BOK Guide

c)

Project governance

d)

Portfolio management

100.

A project manager's primary responsibility is to deliver the product of the project within project constraints. Actions taken and changes made to the benefit of one constraint could negatively affect another. which of the following best describes the major constraints on a project?

a)

Scope, number of resources, and cost

b)

Scope, cost, and schedule

c)

Scope, schedule, cost, quality, risk,resources and customer satisfaction

d)

Schedule, cost, and number of changes

101.

If a project manager is concerned with gathering, integrating, and disseminating the outputs of all project management processes, she should concentrate on improving the:

a)

Work breakdown structure (WBS)

b)

Commumcations management plan

c)

Project management information system (PM IS)

d)

Scope management plan

102.

A project manager is managing his second project. lt started one month after the first one did, and both projects are still in process. Though his first project is small, the new project seems to be quickly growing in size. As each day passes, the project manager is feeling more and more in need of help. The project manager has recently heard that there was another project in the company last year that was similar to his second project. What should he do?

a)

Contact the project manager for the other project, and ask for assistance.

b)

Obtain historical records and guidance from the project management office (PMO)

c)

Wait to see if the project is impacted by the growth in scope.

d)

Make sure the scope of the project is agreed to by all the stakeholders.

103.

To obtain support for the project throughout the performing organization, it's best if the project manager:

a)

Ensures there is a communications management plan

b)

Correlates the need for the project to the organization's strategic plan

c)

Connects the project to the personal objectives of the sponsor

d)

Confirms that the management plan includes the management of team members

104.

Your management team has decided that all orders will be treated as projects and that project managers will be used to update orders daily, to resolve issues, and to ensure the customer formally accepts the product within 30 days of completion. Revenue from the individual orders can vary from $100 to $150,000. the project manager will not be required to perform planning or provide documentation other than daily status. How would you define this situation !

a)

Because each individual order is a "temporary endeavor," each order is a project.

b)

This is program management since there are multiple projects involved.

c)

this is a recurring process.

d)

Orders incurring revenue over $ 100,000 would be considered projects and would involve project management.

105.

As a project manager, you have had to develop skills to help plan and manage projects successfully.

Which skills would best help you encourage project teams to reach levels of high cooperation and

achievement, promote a positive relationship with sellers on a project, and involve stakeholders

appropriately through all aspects of the project?

a)

Active listening. negotiating, and political awareness

b)

Networking, communication models, and SWOT

c)

Sensitmty analysts, active listening. and leadership

d)

Communication methods. team building. and claims administration

106.

A pmject team is working on manufacturing a new product, but they are having difficulty creating a

project charter. What is the best description of the real problem?

a)

They have not identified the project objectives.

b)

They are working on a process and not a project.

c)

The end date has not been set

d)

They have not identified the product of the project.

107.

One of your team members informs you that he does not know which of the many projects he is

working on is the most important. Who should determine the priorities between projects in a

company?

a)

The project manager

b)

The project management team

c)

The project management office ( PMO)

d)

The project team

108.

The difference between a project, program, and portfolio is:

a)

A project is a temporary endeavor with a beginning and an end. a program may include other nonproject work. and a portfolio is all the projects in a given department or division.

b)

A project is a lengthy endeavor with a beginning and an end, a program combines two or more unrelated projects, and a portfolio combines two or more programs.

c)

A project is a temporary endeavor with .1 beginning and an end. a program is a group of related projects, and a portfolio is a group of projects and programs related to a specific strategic /

organizational objective.

d)

A project is a contracted endeavor with a beginning and an end, a portfolio is a group of projects with more open-ended completion dates, and a program combines two or more portfolios.

109.

Operational work is difierent from project work in that operational work is:

a)

Unique

b)

Temporary

c)

Ongoing and repetitive

d)

A part of every project activity

110.

Company procedures require the creation of a lessons learned register. Which of the followmg is the best use of lessons learned?

a)

Historical records for future proiects

b)

Planning record for the current project

c)

informing the team about what the project manager has done

d)

Informing the team about the project management plan

111.

A complex aerospace engineering project is nearing completion. Because the workwas highly technical and new to the organization. the product of the project was released two months later than planned. Despite the late delivery, management is appreciative of the effort expended and believes that this product will generate additional opportunitim for the organiution. Management also thinks that the experience of this team will provide great value for teams working on similar projects in the future. The sponsor requests that lessons learned be thoroughly documented. Lessons learned are best completed by:

a)

The project manager

b)

The team

c)

The sponsor

d)

The stakeholders

112.

Consideration of ongoing operations and maintenance is crucially important to products of projects.

Ongoing operations and maintenance should:

a)

Be included as activities to be performed during project closure

b)

Be a separate phase in the project life cycle because a large portion oflife cycle costs is devoted to maintenance and operations

c)

Not be viewed as part of a project

d)

Be viewed as a separate project

113.

What is a program?

a)

An initiative set up by management

b)

A means to gain benefits and control of related projects

c)

A group of unrelated projects managed in a coordinated way

d)

A government regulation

114.

company is making an effort to improve its project performance and create historical records of past

projects. What is the best way to accomplish this?

a)

Create project management plans.

b)

Create lessons learned

c)

Create network diagrams

d)

Create status reports

115.

A project manager has received some help from the team, and she needs help from them again so that she can create a detailed project budget. Which project management process group is she in?

a)

Initiating

b)

Before the project management process

c)

Planning

d)

Executing

116.

The project charter is created in which project management process group?

a)

Executing

b)

Planning

c)

Closing

d)

Initiating

117.

project team has just completed the initial project schedule and budget. The next thing to do is to:

a)

Identify risks.

b)

Begin iterations.

c)

Determine communications requirements.

d)

Create a bar (Gantt) chart

118.

A detailed project schedule can he created only after creating the:

a)

Project budget

b)

W'ork breakdown structure

c)

Project management plan

d)

Detailed risk assessment

119.

The person who should be in control of the project during project planning is the:

a)

Project manager

b)

Team member

c)

Functional manager

d)

Sponsor

120.

Which of the following is not an input to the initiating process group?

a)

Company processes

b)

Company culture

c)

Historical WBSs

d)

Project scope statement

121.

The project sponsor has just signed the project charter. What is the next thing to do?

a)

Begin to complete work packages

b)

Validate scope

c)

Start integrated change control

d)

Start to create management plans

122.

The high-level project schedule constraints have just been determined. What project management

process group are you in?

a)

initiating

b)

Planning

c)

Executing

d)

Monitoring and controlling

123.

The WBS and WBS dictionary have been completed, and the project team has begun working on identifying risks. The sponsor contacts the project manager, requesting that the respl)nsibilit)' assignment matrix be issued. 'The project has a budget of$ I 00,000 and is taking place in three countries using 14 human resources. There is little risk expected for the project, and the project manager has managed many projects similar to this one. What is the next thing to do?

a)

Understand the experience of the sponsor on similar projects.

b)

Create an activity list.

c)

Make sure the project scope is defined.

d)

Complete risk management and issue the responsibility assignment matrix.

124.

In A project manager does not have much time to spend on planning before the mandatory start date r

arrives. He therefore wants to move through planning as efl'ectively as possible. What advice would '

you other?

a)

Make sure you have a signed project charter and then start the WBS

b)

Create an activity list before creating a network diagram.

c)

Document all the known risks before you document the high-level assumptions.

d)

Finalize the quality management plan before you determine quality metrics.

125.

The best time to assign a project manager to a project is during:

a)

integration

b)

Project selection

c)

Initiating

d)

Planning

126.

A project manager gets a call from a team member notifying him that there is a variance between the speed of a system on the project and the desired or planned speed. The project manager is surprised because that perfornmnce measurement was not identified in planning. If the project manager then evaluates whether the variance warrants a response, he is in which part of the project management process?

a)

initiating

b)

Executing

c)

Monitoring and controlling

d)

Closing

127.

A team member notifies the project manager that the activities comprising a work package are no longer appropriate. It would be best for the project manager to be in what part of the project management process?

a)

Corrective action

b)

Integrated change control

c)

Monitoring and controlling

d)

Project closing

128.

During a team meeting, a team member asks about the measurements that will be used on the project

to assess perfomiance. The team member feels that some of the measures related to activities assigned

to him are not valid measurements. The project is most likely in what part of the project manage-

ment process?

a)

Closing

b)

Monitoring and controlling

c)

Executing

d)

Initiating

129.

Which ofthe following is the most appropriate thing to do during the initiating process group?

a)

Create a detailed description ot'thc project deliverables.

b)

Get familiar with the company culture and structure as they relate to the project.

c)

identify the root cause of problems

d)

Ensure all project management processes are complete.

130.

Which of the following is a characteristic of project management processes?

a)

iterative

b)

Unique

c)

Unnecessary

d)

Standardized

131.

Which project management process group generally takes the most project time and resources?

a)

Planning

b)

Design

c)

Integration

d)

Executing

132.

You are managing two projects and have been assigned to a third project that has just been approved. You begin the new project, and are able to manage it well along with the others you are managing. During initiating, you are focused on accomplishing a number of activities. Which of the following are you not concerned with at this time?

a)

Identifying and documenting business needs

b)

Creating a project scope statement

c)

Dividing a large project into phases

d)

Accumulating and evaluating historical information

133.

The software development project has progressed according to plan. The team is very enthusiastic about the product they have created. Now they are looking ahead to finding new projects to work on. You caution them that the current project cannot be considered complete until after the closing process group. Closure includes all the following except:

a)

Determining performance measures

b)

Turning over the product of the project

c)

Documenting the degree to which each project phase was properly closed after its completion

d)

Updating the company's organizational process assets

134.

The first phase of your project has come to an end. what is the most important thing to ensure is done before beginning the next phase?

a)

Verify that the resources are available for the next phase.

b)

Check the project's progress compared to its baselines.

c)

Confirm that the phase has reached its objectives, and have its deliverables formally accepted.

d)

Recommend corrective action to bring the project results in line with project expectations.

135.

During which process group does the team measure and analyze the work being done on the project?

a)

initiating

b)

Executing

c)

Monitoring and controlling

d)

Closing

136.

Which process groups must be included in every project?

a)

Planning, executing, and closing

b)

Initiating, planning. and executing

c)

Planning, executing, and monitoring and controlling

d)

Initiating, planning, executing, monitoring and controlling, and closing

137.

Which of the following is the most appropriate thing to do in project closing?

a)

Work with the customer to determine acceptance criteria.

b)

Confirm all the requirements in the project have been met.

c)

Collect historical information from previous projects.

d)

Gain formal approval of the management plans.

138.

Which process group focuses on completing the requirements of the project?

a)

initiating

b)

Planning

c)

Executing

d)

Closing

139.

All the following occur during the planning process group except:

a)

Develop Project Charter

b)

Create WBS

c)

Estimate Costs

d)

Sequence Activities

140.

A market demand, a business need, and a legal requirement are examples of:

a)

Reasons to hire a project manager

b)

Reasons projects are initiated

c)

Reasons people or businesses become stakeholders

d)

Reasons to sponsor a project