1.

Lean production aims to reduce :

a)

waist

b)

weights

c)

waste

d)

waits

2.

TBM (part of lean production) =

a)

training based management

b)

time based management

c)

truck based management

d)

tea based management

3.

JIT (part of lean production) =

a)

Just in transport

b)

Just in training

c)

Just in time

d)

Justin timberlake

4.

Kaizen (part of lean production) =

a)

continuous improvement

b)

contingency improvement

c)

contigious improvement

d)

competitor improvement

5.

Just-in-time aims for

a)

maximum buffer (spare) stock

b)

zero buffer (spare) stock

c)

very large infrequent deliveries from supplier

6.

Kaizen ideas come from :

a)

customers

b)

workers

c)

top managers

d)

local community

7.

Compared to Mass production, Lean production has :

a)

longer production runs (making the same item before switching)

b)

shorter production runs (making the same item before switching)

c)

same length of production runs (making the same item before switching)

8.

Just-in-time may fail due to :

a)

flexible, motivated workers

b)

accurate predictions of demand

c)

unreliable suppliers

9.

Quality assurance =

a)

inspection at the end of the production process

b)

checking quality at each stage of the production process

10.

A key indicator of quality :

a)

uncertain reliability

b)

numerous defects

c)

repeat purchases (loyalty)

d)

very low price

11.

Another word for stock (eg. in a warehouse)

a)

invention

b)

inventory

c)

investment

d)

investiture

12.

Flexible machines (in lean production) =

a)

Able to be changed easily to make a variety of products

b)

Able to be moved about the factory easily

13.

Which capacity utilisation % results in lowest fixed costs per unit ? :

a)

12%

b)

90%

c)

55%

d)

86%

14.

Current output = 12,000 units, maximum capacity = 48,000 units, therefore :

a)

Capacity utilisation = 20%

b)

Capacity utilisation = 24%

c)

Capacity utilisation = 25%

d)

Capacity utilisation = 52%

15.

Saving time in new product design (development) gives a firm :

a)

less sales

b)

first-mover advantage

c)

last-mover advantage

d)

home-mover advantage