1.
At the end of the project, the PM determines that the project will add 4 functional areas and 3 performance areas. Customers expressed satisfaction with the project. Project success means:
a)
A. The project does not qualify for success
b)
B. The project was not successful because it did more than the customer wanted without getting paid (gold plating)
c)
C. The project was unsuccessful because the customer was satisfied which meant they had to pay more for the work
d)
D. The project was successful because the team had the opportunity to learn new functional areas and the customer was satisfied
2.
PM has managed 4 projects for the company and is being considered to join the project management department. Here's what was learned after the process of evaluating his capabilities: this PM's first project had a cost fluctuation of CV = -500, used 2 key resources, and needed to redo the principles. The project is in the implementation phase and is ranked 14th priority in the company. The second project ended up with a schedule variation of +100, was completed on a vast compressed schedule, and received a letter of recommendation from the sponsor, but the project's product was not used. The third project had 23% more changes than expected, had an SPI=0.90 and 35 issues log entries when the project was completed. Each project has a cost budget of $1,000 and is about 20 to 28% more variable than other projects of the same scale. The project management department decided not to consider this PM person in the room anymore. Which of the following best describes why the PM was not allowed in?
a)
A. The PM only manages low-priority projects and he has to compress the schedule, showing that he is not skilled enough to work in a project management department
b)
B. Error logs should not be used in projects of this size, indicating that the PM does not have enough knowledge to work in the project management department
c)
C. The PM does not effectively engage stakeholders, indicating that he does not have enough knowledge to work in the project management department
d)
D. The PM has 2 key resources on his team and still needs to redo the project charter, showing that he is not disciplined enough to work in the project management department
3.
The new project excites both the PM and the project team. This is the first time a PM person has been assigned the role of PM. The team felt like they were capable of completing work that had never been done before. A team of 29 people contributes to product description and a team of 9 experts with extensive professional experience. During the planning process, three highly specialized employees disagreed on the scope of the two products. one ng indicates that the draft WBS should add 2 work packages. one person said that the work package involved should not have been implemented. The third person agrees with the above two people. How should PM resolve this conflict?
a)
A. PMs should listen to differences in opinion, determine the best option, and implement it
b)
B. The PM should defer discussions, meet individually, and determine the best approach.
c)
C. PM should listen to differences in opinion, encourage logical discussions, and facilitate agreement
d)
D. The PM should help the project team focus on the relevant aspects of their ideas and build consensus using techniques
4.
The PM is expecting a product to be submitted by email from an employee today. At the end of the day, the PM contacts the employee to inform them that the PM has not received the email. The employee apologized and said he could not email about the product, and it would be sent via mail instead of email. The employee went on to explain that he informed the PM this would happen during a phone call while the PM was traveling. PM said: "Are we going to talk when I told you I couldn't hear you because the signal was weak?" The employee replied, “Yes.” What will prevent this problem?
a)
A. Use paralingual communication
b)
B. Add to error log after that call
c)
C. Pay more attention to deciding communication requirements
d)
D. Respond during the communication process.
5.
Working on a project in progress when the PM suddenly heard two employees arguing about a set of instructions. PM investigated and discovered that the instructions for the construction of the concrete foundation being poured were mistranslated between the two different languages being used on the project. Which of the following is best for the PM to do first?
a)
A. Get the instructions translated by a trusted and experienced party
b)
B. Search for quality effects of mistranslation of foundation pouring instructions
c)
C. Bring this issue to the project team's attention and ask them to look for other translation errors
d)
D. Inform the sponsor about the problem in the next project report.
6.
While planning a project, which will typically have the most priority, quality, cost or schedule?
a)
A. Cost is the most important, then quality, then schedule
b)
B. Quality is more important than schedule and cost
c)
C. Schedule is most important, then quality, then cost
d)
D. This should be decided on a project-by-project basis
7.
Quality is
a)
A. Satisfy and exceed customer expectations
b)
B. Add something to satisfy customers
c)
C. Is the unit of measurement to see if the project meets the requirements.
d)
D. Follow management's goals
8.
Common causes of project conflict are schedules, project priorities, and:
a)
A. Personal characteristics
b)
B. Resources
c)
C. Cost
d)
D. Management
9.
In what situations can a WBS be an effective aid to communications?
a)
A. Within the project team
b)
B. Within the organization
c)
C. Externally internally with customers
d)
D. Inside and outside the project
10.
A project has several teams. Team C once missed a deadline in the past. This caused team D to cancel the critical path a few times. As the leader of team D, you receive information that the next deadline may not be met. You should meet and discuss with:
a)
A. Team manager D
b)
B. PM only
c)
C. PM and management
d)
D. PM and team C captain
11.
Pareto diagram helps PM
a)
A. Focus on key issues to improve quality
b)
B. Focus on stimulating thinking
c)
C. Explore desired future outcomes
d)
D. Determine if a process is out of control
12.
Which factor has the greatest influence on the estimated per unit labor cost for the project?
a)
Historical information
b)
Use external suppliers.
c)
Change control processes.
d)
Human resource skill level requirements
13.
You are managing a project and are in a deadline-driven environment. This will require more attention, since the inventory in this environment is:
a)
A. 45%
b)
B. 10%
c)
C. 12%
d)
D. 0%
14.
An employee is touring the manufacturing plant of one of the suppliers. Which of the following is the most important thing to do in any call the PM makes?
a)
A. Ask the employee to repeat what the PM said
b)
B. Review the list of contact information for all relevant parties
c)
C. Ask employees to look for change requests
d)
D. Review the upcoming meeting schedule
15.
A PM has a project team consisting of employees from 4 countries. The project is important to the company, and the PM is involved in the project's success. Project duration is acceptable. What type of communication method should he use?
a)
A. Informal speech
b)
B. Official documents
c)
C. Formal speech
d)
D. Informal documents
16.
Project information was distributed according to the communications management plan. Some project deliverables have changed in accordance with the project management plan. A stakeholder expressed surprise to the PM when he heard the announced changes to the project product. All relevant parties receive notification of the change. What should PM do?
a)
A. Determine why the relevant party did not receive the information and let him know when it was released
b)
B. Ask the functional manager why the relevant party does not understand his or her responsibilities
c)
C. Review the communications management plan and make revisions if necessary
d)
D. Determine the situation at the next guidance committee meeting so that others do not miss any announced changes.
17.
You are on a project to build new equipment. The structures are in place and the heat pipes are in place, when the senior manager informs you that he is worried the project will not meet quality standards. What should you do in this situation?
a)
A. Reassure senior management that during quality planning it was determined that the project will meet quality standards
b)
B. Similar estimates will result in the future
c)
C. Train the quality assurance team
d)
D. Check results from past quality management plans
18.
team is using a fishbone diagram to help determine which quality standards will be used in a project. What quality management process are they in?
a)
A. Implementation quality control
b)
B. Ensuring implementation quality
c)
C. Make a management plan
d)
D. Volatility analysis
19.
Evaluating project performance differs from evaluating project team performance in that project performance evaluation focuses on:
a)
A. How does each employee perform work on the project
b)
B. An estimate of the team's effectiveness on the project
c)
C. Efforts to build the project team
d)
D. Reduce employee turnover rate
20.
PM must publish the project schedule. Activities, start and end dates and resources have been identified. What should the PM do next?
a)
A. Distribute project schedules based on the communications management plan
b)
B. Confirm availability of resources
c)
C. Refine the project management plan to reflect more accurate cost information
d)
D. Publish a diagram explaining the timeline.
21.
270. Lessons learned, best accomplished by:
a)
A. PM
b)
B. Project team
c)
C. Sponsor
d)
D. Related parties
22.
Two employees are arguing about what needs to be done to complete a work package. If the PM wants to know what's going on, she should pay most attention to:
a)
A. What was said and when
b)
B. What was said, who said it, and when it was said
c)
C. Each person's own way of speaking and what was said
d)
D. The level and tone of each person's voice (speaking slowly or shouting at each other J) ) and each person's own way of speaking.
23.
The PM notices that the project activities being completed by a department are not working significantly according to plan. By the deadline, no activity or work package is on the critical path, and it affects the critical chain plan. PM is upset about this problem. When 4/5 activities in the critical path must be performed by this department. after making 3 calls, the PM finally decided to go against the leader of this department and determine what was going on. This conversation was long because they both spoke two different languages and they tried to communicate in French (a common language). To make communication simpler, the PM regularly asks the leader of this department to repeat what was said. He told his employees to follow company policy and required two levels of testing. During the course of the conversation, he also made a comment that led the PM to believe that the policy covered too much work. This is the 4th time PM has heard comments like that. What should the PM do best?
a)
Delay time in other paths
b)
The appearance of a new deadline.
c)
Resources are assigned to other tasks on the critical path
d)
Longest task remaining in the plan
24.
Conflict resolution techniques that may be used in the project include: confrontation, smoothing, force and:
a)
A. Withdrawing
b)
B. Directly
c)
C. Organizing
d)
D. Control
25.
Testing the entire population would: (testing the entire population would)
a)
A. It takes a lot of time
b)
B. Provide more information than desired
c)
C. Mutually exclusive
d)
D. Point out many shortcomings
26.
You have just found out that a major subcontractor for your project has delivered goods behind schedule. This subcontractor approaches you and asks to continue accepting the goods, which will be delayed but will receive a partial price reduction. This offer is an example of:
a)
A. Confrontation
b)
B. Compromise
c)
C. Smoothing
d)
D. Force
27.
manager notices a PM who is holding a meeting with several project team members and several project stakeholders to discuss project quality. The project schedule will be compressed and the CPI is 1.1. They worked hard on the project, the project team was rewarded according to the PM's bonus system, and this was a solid team. The manager hypothesized that the PM did not have enough time to hold quality meetings when the schedule was not compressed. Which of the following best describes what this manager did wrong?
a)
A. Improved quality leads to increased performance, increased cost efficiency, and reduced cost of risk.
b)
B. Improved quality leads to increased performance, reduced cost effectiveness, and increased cost of risk
c)
C. Improved quality leads to increased performance, increased cost efficiency, and increased cost of risk
d)
D. Improved quality leads to increased performance, reduced cost effectiveness, and reduced risk costs
28.
Communication is the key to project success. As PM, you have three stakeholders that need to communicate. You have 6 communication channels. A new stakeholder is added and you also have to communicate with him. So how many communication channels do you have?
a)
A. 7
b)
B. 10
c)
C. 12
d)
D. 16
29.
One obstacle facing a project team in a matrix-oriented organization is:
a)
A. Project team organization is focused on expertise
b)
B. Team members are on borrowed resources and difficult to motivate
c)
C. The team is too focused
d)
D. The team is too large and difficult to control
30.
There were several work packages that were successfully completed in the project and the sponsor had some appreciation for the improvements. The project was on schedule to meet the aggressive schedule when the next action of the critical path activity encountered a major setback. This activity has 14 days of float and takes 4 days to complete. There are 2 other skilled staff members to assist with this activity, if necessary. The PM received a call that 3 other employees were trying to leave the project because they did not feel that the project could be successful. As the PM continued to pursue the issue, she discovered that these employees had problems that had not been previously identified. Which of the following is best for improving the project?
a)
A. Project staff immediately try to resolve the problem activity
b)
B. Investigate why the project schedule is rushed
c)
C. Find out who can replace those 3 employees
d)
D. Create error log
31.
Your project is having a difficult time getting formal approval of the project management plan because there are many unapproved stakeholder requests to be involved in the project. Stakeholders bicker and slow down the project as they hold meeting after meeting about their demands. The project was finally approved and started 6 months ago. All of the following would be good preventive actions except:
a)
A. Keep a file of what requirements are not included in the project
b)
B. Make sure the change control process is not used as a means to add requirements to the project
c)
C. Maintain an error log
d)
D. Organize meetings with relevant parties to go over work that has not been added to the project
32.
A PM is overwhelmed with problems on his project. He identifies the root cause of the problem in order to determine where to focus. Which of the following tools is best for him to use?
a)
A. Pareto chart
b)
B. Conflict resolution techniques
c)
C. Fishbone diagram
d)
D. Trend analysis
33.
Everything is working well in the middle of a project. The work authorization system allowed everyone to know when work started, and error logs helped track stakeholder requests. The beneficial cost ratio improved and the sponsor expressed his appreciation for the project team's efforts by hosting a milestone party for the team. PM received a call from a project member saying that the results from the completion of the previous activity were delayed by 2 days. Which of the following reasons best explains why this occurs?
a)
A. PM focuses on sponsor requirements
b)
B. Functional leadership is not included in the communications management plan
c)
C. Subsequent activities should be tracked, not previous activities
d)
D. Necessary people are not invited to important parties
34.
The project team has just created a plan that describes how they will implement the quality policy. It addresses the organizational structure, responsibilities, procedures and other information about the plan for quality. If this changes during project implementation, which of the following plans will change accordingly?
a)
A. Quality assurance
b)
B. Quality management
c)
C. Project management
d)
D. Quality control
35.
During project team meetings, the project team adds specific scope of additional work because they determine that it will benefit the customer. What is wrong in this situation?
a)
A. The project team is creating additional benefits for the customer but is not paid more (gold plating)
b)
B. These efforts should not be completed during a meeting
c)
C. There's nothing wrong. This is the way to satisfy and exceed customer requirements
d)
D. There's nothing wrong. PM is in control of this situation
36.
A control scheme helps PM
a)
A. Focus on the most critical issues to improve quality
b)
B. Focus on stimulating thinking
c)
C. Explore desired future outcomes
d)
D. Determine if a process is operating within a set of constraints
37.
Halo effect related to trends:
a)
A. Promote from within
b)
B. Hide the best (hide the best)
c)
C. Transfer employees to the project management department because they do well in their profession
d)
D. Transfer employees to the project management department because they are trained in project management
38.
Communications below the contract should be directed toward:
a)
A. Official communication documents
b)
B. Official communication (verbal).
c)
C. Unofficial communication documents
d)
D. Informal communication speech
39.
During each project team meeting, the PM asks each project team member to describe the work they are doing, and the PM assigns new tasks to each member. The duration of the meeting increases due to the many different tasks assigned. This can happen for all of the following reasons except:
a)
A. Missing WBS sheet
b)
B. Lack of responsibility assignment matrix
c)
C. Imbalance of resources
d)
D. Lack of involvement of the project team during project planning
40.
Which of the following is most similar to the results of block communication?
a)
A. The project is behind schedule
b)
B. Increased level of trust
c)
C. Conflicts occur
d)
D. Middle managers are dissatisfied
41.
The project you are working on has increased cost efficiency, increased efficiency and increased morale. What could be the cause for these changes?
a)
A. Project objectives are met upon implementation
b)
B. Increase quality
c)
C. Management focuses on containment policy
d)
D. Reward for the efforts of individuals
42.
CPI=1.02, the benefit-cost ratio was 1.7 and the last round of performance review determined that some further adjustments were needed. The project team relocated to the new building when the project began. each person commented on how excited they were to get to use the new device. The sponsor provided adequate support to the project and some unknown risks occurred. In an effort to improve performance, PM spends part of the project budget on new chairs for the team members and advertises the term “senior” to each team member's job title. Which of the following is true about PM's project?
a)
A. PM does not understand Herzberg's principle
b)
B. The project is spending less than it should, the PM should start tracking costs carefully
c)
C. Review the expected performance to find additional adjustments
d)
D. PM should use good judgment to identify significant changes
43.
The project has just begun and includes personnel from 14 different departments. The project charter is signed by one person and includes more than 30 key requirements that must be met in the project. The sponsor informs the PM that the SPI must be kept between 0.95 and 1.1. A few minutes of investigation led to the identification of 34 interested parties, and the target schedule was binding. PM has just been hired. Which of the following types of project management authority is best to help the PM gain cooperation from others?
a)
A. Formal law
b)
B. Consulting and reference (referent)
c)
C. Penalty law
d)
Specialize
44.
The project had 13 employees and was influenced by 15 departments within the organization. Because the project had completed 20% of the project deadline and had successful performance reports from 5 departments, the PM organized a party. The PM invites stakeholders from all departments, providing good reviews for an informal communication opportunity to spread the word to departments not yet involved in the project. At the party, the PM went around to explore and find information related to one of the departments that was talking about setting up more formal meetings in the project. The best thing the PM should do first is:
a)
A. Record the profound impressions of the party into the lessons learned from the project
b)
B. Review the method of distributing information within the project
c)
C. Hold a meeting with all relevant parties to discuss their concerns
d)
D. Make sure management has a copy of the communications management plan so he can remember these concerns should be sent to the PM
45.
A PM is in the execution phase of a project when a stakeholder requests a major change. This change will result in the project's third major overhaul. At the same time, the PM discovered a large work package was completed because a manager had transferred his employee to another project with a higher priority. Who is the best person for the PM to identify these issues with?
a)
A. Project team
b)
B. Senior manager
c)
C. Customers
d)
D. Sponsor
46.
During the project execution phase, a project team employee informs the PM that a work package does not meet quality standards, and she believes the work package cannot be met. PM meets with relevant parties to analyze the situation. What quality management process is this PM in?
a)
A. Perform quality assurance
b)
B. Project control
c)
C. Perform quality control
d)
D. Quality planning
47.
During the project planning phase in a matrix-oriented organization, the PM determines that additional human resources will be needed. PM will request these resources from:
a)
A. PM
b)
B. Functional director
c)
C. Project team
d)
D. Project sponsor
48.
The project is challenging to manage. Each person is pushed to complete the project on time. Unfortunately, the tension increased to the point that every project team meeting became a battleground and little work was accomplished during the meeting. An employee asked to be absent from the next meeting because he was making him angry. Meanwhile, the sponsor requested to attend to better understand how the project was being implemented and the issues involved in completing the project, and the client began discussing adding scope to the project. In this situation, what is the best PM to do?
a)
A. Ask the sponsor if the necessary information should be submitted in the report rather than the sponsor participating in the meeting
b)
B. Inform the team who wants to be absent from the meeting about media guidelines for meetings like this
c)
C. Create a new rule for meetings and notify the project team
d)
D. Prepare a team building exercise that involves all team members
49.
Which of the following is not a component of quality control?
a)
A. Determine whether project activities comply with organizational policies
b)
B. Identify inefficiencies and ineffective policies
c)
C. Repair identified defects
d)
D. Verify implementation of approved change requests
50.
Ishikawa diagrams help:
a)
A. Put information in the right priority order
b)
B. Explore past outcomes
c)
C. Indicate project team responsibilities
d)
D. Indicate functional responsibilities
51.
New software installation project is underway. The PM is working with the quality assurance department to improve everyone's confidence that the project will meet quality standards. Which of the following must they have before starting this process?
a)
A. Quality issues
b)
B. Quality improvement
c)
C. Quality control measurement system
d)
D. Rework
52.
Which of the following is not an example of inappropriate costing?
a)
A. Rework
b)
B. Quality training
c)
C. Scrap
d)
D. Warranty costs
53.
You're a PM for a large information systems project when someone from the quality department comes in and talks about starting to quality check your project. The project team, already under pressure to complete the project as quickly as possible, felt uneasy about this inspection. You should explain to the team that the purpose of quality testing is:
a)
A. Part of ISO 9000 inspection
b)
B. To check if the customer is following the quality process closely.
c)
C. To identify inappropriate policies
d)
D. To check the accuracy if costs are reviewed by the project team
54.
Which of the following is not quality assurance?
a)
A. Inspection
b)
B. Process analysis
c)
C. Pareto diagram
d)
D. Fishbone diagram
55.
Compliance of official documents with customers is required when:
a)
A. Hazards are eliminated
b)
B. The customer requests additional work that is not included in the contract
c)
C. The project has a schedule that is on time and includes critical path changes
d)
D. Project exceeds budget
56.
large project is underway when a project team member reviews the project status report. He sees that the current project is running behind schedule. Upon further investigation, he noticed that the delay was the cause of his activity being rescheduled while he was abroad and unable to carry out the activity. This was a major concern since he was committed to the project's success and he did not want to be the cause of further project delays. What's the best thing to do?
a)
A. Contact PM immediately to provide PM with schedule
b)
B. Add this information to his next report
c)
C. Request that this issue be added to the project's error log
d)
D. Recommended corrective action
57.
The highest point in Maslow's hierarchy of necessity is:
a)
A. Physiological satisfaction
b)
B. Achieve survival
c)
C. Combination
d)
D. Self-esteem
58.
A large 1-year telecommunications project is halfway through when you take over the PM position from another person. The project entailed 3 different vendors and a project team of 30 people. You want to see project communication requirements and what techniques are used to help with communication. Where will you find it?
a)
A. Project management plan
b)
B. Information distribution plan
c)
C. Bar chart
d)
D. Communication management plan
59.
230. A PM just found out that the project's main subcontractor is always behind schedule. The project staff responsible for this part of the project is not progressing well with this subcontractor. To solve the problem, the PM said: "Both of you have to give up something to solve this problem". What problem solving method is the PM using?
a)
A. Confrontation
b)
B. Compromise
c)
C. Smoothness makes things smooth.
d)
D. Communication
60.
Project implementation has CPI=1.03 and SPI=1. There are 14 employees and each employee has input into the final project management plan. The customer agreed to 3 completed deliverables to date with no complaints and the responsibility assignment matrix has not changed since the project started. The project is being completed in a matrix environment and there are no contracts added to the project. The sponsor is satisfied with the status of the project, an employee always complains about his project work being quite time consuming. Which of the following is best for the PM to do?
a)
A. Review the project's reward system
b)
B. Try to improve the project's schedule performance
c)
C. Meet with the customer to try to extend the schedule
d)
D. Obtain formal written acceptance from the customer
61.
You are a PM leading a cross-functional project in a weakly matrixed environment. No project team members report to you in a meaningful way, and you don't have the ability to directly reward their work. Difficult projects, entailing strict time constraints and challenges in quality management. Which of the following types of project management strengths would be most effective in this situation?
a)
A. Referent
b)
B. Expertise
c)
C. Penalty
d)
D. Formal law (formal)
62.
You have just been assigned as PM for a large production project. This 1 year project is half done. it entailed 5 sellers and 20 company members joining the project team. You want to quickly review how the project is progressing. Which of the following reports is most useful for finding such information?
a)
A. Work status
b)
B. Progress
c)
C. Forecast
d)
D. Communication
63.
A PM has a complex problem to solve and makes a decision about what needs to be done. A few months later, the problem appeared again. What did PM NOT do before?
a)
A. Analyze risks properly
b)
B. Confirm that the decision resolves the problem
c)
C. There is project sponsor approval in that decision
d)
D. Use Ishikawa diagram
64.
The project progress meeting did not go well. People talk all the time, many people don't participate, and many topics are discussed randomly. Which of the following rules for effective meetings was not followed?
a)
A. The polite and deliberate focus of each individual, controlling who gets to speak
b)
B. Meeting schedule
c)
C. Meeting with a purpose, with the right people participating in the meeting
d)
D. Create and announce an issue and a set of rules to govern the meeting
65.
Corporate procedures include documenting lessons learned. Which of the following is the best way to use the lessons learned?
a)
A. Historical information for future projects
b)
B. Plan a historical record for the current project
c)
C. Inform the project team about what the PM has done
d)
D. Inform the project team about the project management plan
66.
A project status report is an example of what type of communication?
a)
A. Official communication documentst.
b)
B. Official communication (verbal).
c)
C. Unofficial communication documents
d)
D. Unofficial communication speech
67.
A project employee does not work well on the project because she lacks experience in systems development work. There is no one available who is qualified to do this. For PM, which solution is best?
a)
A. Consult with functional managers to determine project team members' motivation to complete the project
b)
B. Replace new people with more skills to develop the job.
c)
C. Arrange for this employee to receive training
d)
D. Allocate some reserve schedule resources
68.
When a PM is busy negotiating, nonverbal communication skills are
a)
A. Less important
b)
B. Very important
c)
C. Important only if cost and schedule goals are entailed
d)
D. Important only if you are sure you want to negotiate successfully
69.
A PM has problems with the project team's performance. What type of communication will help the PM identify the problem?
a)
A. Official communication documents
b)
B. Official communication (verbal).
c)
C. Unofficial communication documents
d)
D. Informal communication speech
70.
Most uses of communication ……………… are largely like helping in solving complex problems
a)
A. Language and speech (verbal)
b)
B. Document (written)
c)
C. Formal (formal)
d)
D. Nonverbal (nonverbal)
71.
What conflict resolution technique is the PM using when he says: “I can't solve the problem right now”?
a)
A. Problem solving
b)
B. Force
c)
C. Withdrawal.
d)
D. Compromise
72.
A PM overhears a conversation between two stakeholders talking about their dissatisfaction with the project's impact on their departments. Stakeholder A asks if the project is on schedule and party B answers 1.05. Party A asked PM if he knew how this was related to Party B, Party B replied he was not sure. What is the best thing for a PM to do?
a)
A. Make sure the relevant parties see the PM overhearing and ask them to refer questions to the PM in writing
b)
B. Present to all relevant parties the status of the project
c)
C. Send these two relevant parties a copy of the issue log and ask if there are any further comments
d)
D. Arrange a meeting with both of these stakeholders to hear from them about any related issues they have.
73.
The engineering department wants the project target to improve by 10%. The IT department wants the department's resources to not be used more than 5% on the project. The board of directors, also your boss, wants the project team to reduce tax liability. The best thing to do is:
a)
A. Develop a plan that meets all of the above goals
b)
B. Everyone discusses and agrees on one goal
c)
C. Takes into account the goals of the technical department and IT department but meets little of the management board's goals (holding a further meeting)
d)
D. Only takes into account management's goals.
74.
You have just been assigned as PM for a new communications project and are starting the second phase of the project. There are quite a few risks present in the project, but no one estimates them to assess the range of possible outcomes. What needs to be accomplished?
a)
Risk management plan
b)
Risk quantification plan
c)
Risk response plan
d)
Risk control
75.
When checking an employee's calendar to schedule a meeting, you see that she scheduled a meeting with a key stakeholder but you were not notified. The best way to explore is:
a)
A. Refuse to mention the matter to the employee but continue to monitor her actions.
b)
B. Inform your supervisor about this problem
c)
C. Talk about this with her boss
d)
D. Talk about this with her
76.
While testing the durability of concrete poured on your project, you discover that more than 35% of the concrete does not meet your company's quality standards. You feel certain that the concrete will perform well, and you don't think the concrete needs to meet quality standards. what should you do?
a)
A. Change quality standards to the extent possible
b)
B. List in the report that the concrete simply “meets our requirements”
c)
C. Make sure the remaining concrete will meet standards
d)
D. Report poor quality and try to find a solution
77.
Purchase insurance is best considered as an example of what type of risk?
a)
Project book
b)
Statement of work (SOW)
c)
Document roles and responsibilities.
d)
A guide to company policies and procedures
78.
A seller is implementing a CR cost reimbursement contract when the buyer decides to expand the scope of services and change to a fixed price (FP) contract. All of the following are at the seller's option, except
a)
Complete the initial work within the base cost and then negotiate a set price for additional work
b)
Complete the initial work and refuse additional work
c)
Negotiate a fixed price contract that covers all work
d)
Start a new contract
79.
You are the PM for a new multinational project and your project team includes employees from 4 countries. Most employees had never worked on a project like this, but the project had great support from senior management. The best way to make sure that cultural differences do not affect the project is to:
a)
A. Spend some extra time creating the WBS and make sure it's complete
b)
B. As a PM, make sure you choose your words carefully when you communicate
c)
C. Ask one person in each meeting to describe what is unique about their culture
d)
D. Carefully encrypt all PM communications
80.
The main goals of contract negotiation are:
a)
There's more from the other side
b)
Protect the relationship
c)
Get the highest monetary return.
d)
Identify a goal and stick to it
81.
The output of risk response planning is:
a)
Risk Balance
b)
Risks are identified
c)
Priority list of risks
d)
The effects are determined
82.
With an express contract, a seller completes the specified work, but the buyer is not satisfied with the results. Contracts will be reviewed to:
a)
Void (null and void)
b)
Not completed.
c)
Complete
d)
Give up
83.
A PM is quantifying the risk for her project. She has a lot of outside expertise, but if only she could use it inside the project. How can this be done?
a)
Use Monte Carlo analysis using the Internet as a tool
b)
Apply the critical path method
c)
Identify options for recommended corrective actions
d)
Apply the Delphi technique
84.
A PM has just completed a risk response plan for a technical project with a budget of $387,000. Which of the following should he do next?
a)
Determine the overall risk ratio for the entire project
b)
Start risk analysis and address it in the project drawing.
c)
Add work packages to the WBS table
d)
Organize a reassessment of project risks
85.
Once signed, the contract is legally binding unless otherwise stated
a)
One party cannot perform
b)
One party cannot afford their portion of the work
c)
Violating the law
d)
The contract is declared invalid through the lawyer of one of the two parties
86.
Which of the following risk events most hinders achieving the project's schedule goals?
a)
A. Delay in obtaining required approvals
b)
B. Significant increase in raw material purchasing costs
c)
C. Contract disputes generate claims for increased payments
d)
D. The meeting was scheduled to review the implementation of k on time
87.
A PM discovers a defect in a product that must be delivered to the customer today. The PM knows that the customer does not have the technical knowledge to notice this defect. The product meets the contract requirements, but does not meet PM's quality standards. What should PM do in this situation?
a)
A. Launch the product and get formal approval from customers
b)
B. Document the problem in lessons learned so future projects won't encounter that problem again
c)
C. Discuss the problem with the customer
d)
D. Notify customers that the product will be delayed
88.
In a fixed price contract, the fee or profit is
a)
. Unknown
b)
As part of the negotiation regarding payment of all bills
c)
Applies as a line item on every invoice
d)
Determined with other parties at the end of the project
89.
You have just discovered an error in the installation schedule that will prevent an important meeting (milestone date). the best thing you should do is:
a)
A. Develop options to get to the important date
b)
B. Change important dates
c)
C. Delete some discussions about timing according to the project status report
d)
D. Coach the team on the need to get to the important date
90.
Given that the two ends of the range of average estimates are +/-3sigma, which of the following range of estimates includes the least risk?
a)
A. 30 days, plus or minus 5 days
b)
B. From 22-30 days
c)
C. Optimistic=26days, most likely=30days, pessimistic=33days
d)
D. 28 days
91.
Management told a PM to subcontract part of the project to a company that management had worked with many times. In this situation, the PM should be most concerned about:
a)
A. Surely the company has enough capacity to complete the project
b)
B. Meet management's time requirements
c)
C. Cost of subcontracted work
d)
D. Contract terms and conditions
92.
The PM is having a difficult time keeping the development project on schedule. The project required 220 people to complete. All project problems have been resolved and PM is satisfied, SPI=0.67, CPI=1.26, there are 23 activities in the critical path and the project PERT length is 26. In this condition, the report Monthly status should report that:
a)
A. The project is still running well
b)
B. The project will be behind schedule
c)
C. Project cost is lower than budget
d)
D. Issues and options
93.
Which of the following is an advantage of centralized contracting?
a)
Allows easier access to professional contracting
b)
Increase the company's expertise in signing contracts
c)
More loyal to the project.
d)
Allow a contract person to work on a single project (allow a contracts person to work on a single project)
94.
During the project execution phase, a major problem occurred that was not in the risk register. What should you do first?
a)
Create a workaround for unplanned risks
b)
Re-estimate the risk identification process
c)
Search for unintended consequences of this problem
d)
Talk to management
95.
The sponsor is worried about the seller incurring additional profits in a cost plus fixed fee (CPFF) contract. Each month the seller asks the PM to submit CPI calculations and an analysis of costs to completion. The PM explains to the sponsor that additional profits should not be a concern in this project because:
a)
The project team made sure the seller did not cut corners
b)
All invoiced charges will be audited
c)
A maximum increase of 10% is possible only if there are unexpected cost overruns
d)
Costs are only received from the seller when the project is completed
96.
All of the following are a common result of risk management, except:
a)
The terms and conditions of the contract are created
b)
The project management plan is changed
c)
The communication management plan is changed
d)
The project's motto has been changed
97.
If a risk has a 20% chance of occurring in a given month, and the project is expected to last 5 months, what is the probability that this risk event will occur in the 4th month of the project?
a)
A. Less than 1%
b)
B. 20%
c)
C. 60%
d)
D. 80%
98.
The sponsor and the PM are discussing what type of contract the PM plans to use in the project. The seller pointed out that the implementing organization had spent a lot of money to hire a design team to come up with the design. PM is concerned that the risk from the buyer will be as little as possible. One advantage of fixed price contracts for sellers is:
a)
. Lower cost of risk
b)
Higher cost of risk.
c)
There are only few risks.
d)
Risks are divided equally between all parties.
99.
You are the PM for a large project in a government contract. The 2-year, multi-million dollar contract was signed 6 months ago. You are not involved in negotiating contracts or establishing procedures for managing changes, but you are inundated with changes from customers and from people within your organization. Typically, who will be responsible for the formal review of major project/contract changes?
a)
A. Change Control Board
b)
B. Contracting/legal department
c)
C.PM
d)
D. Senior leaders
100.
manager responsible for a project has support from senior leadership. From the start, you disagreed with this manager about how the project should proceed and what the deliverables should be. You and she have disagreed on many issues in the past. Your department is tasked with delivering several important work packages for the project. What should you do?
a)
A. Give her what she needs
b)
B. Inform your manager of your concerns about her support
c)
C. Talk to her at the beginning of the project and try to describe why you object and find a way to resolve the problem
d)
D. Ask to be released from the project