1.

Civil engineers shall uphold paramount the ___, ___, and ___ of the public and shall strive to comply with the principles of sustainable development in the performance of their duties.

a)

welfare, health, safety

b)

safety, welfare, health

c)

safety, health, welfare

d)

health, safety, welfare

2.

The RA 544 consists of how many sections?

(a)  

3.

The RA 544 consists of how many articles?

(a)  

4.

PCAB stands fpr?

a)

Philippine Contractor Accreditation Board

b)

Philippine Contractors Accreditation Board

c)

Philippine Contractor Accreditor Board

d)

Philippine Contractor Accreditors Boards

5.

It is a systematic, organized approach to providing necessary functions in a project at the lowest cost

a)

Cost Estimate

b)

Value Engineering

c)

Appraisal

d)

Engineering Economics

6.

Who is the executive officer of the board?

a)

CE Board Chairman

b)

PRC Commissioner

c)

Director of Public Works

d)

President of the Philippines

7.

This means an expert estimate of the value of something.

(a)  

8.

It is It is determining the relative locations of points on the earth's surface by measuring horizontal distances, difference in elevations, and directions.

a)

Quantity Survey

b)

Cadastral Survey

c)

Photogrammetry

d)

Topographic Survey

9.

It is a branch of civil engineering that involves the planning, design, construction, operation, and maintenance of roads, bridges, and tunnels.

a)

Transportation Engineering

b)

Traffic Engineering

c)

Railroad Engineering

d)

Highway Engineering

10.

What is the minimum compensation for a CE with loft projects costing 10 million or less?

(a)  

11.

What is the minimum compensation for a CE with piers projects costing 10 million or less?

(a)  

12.

What is the minimum compensation for a CE with projects of complex structures costing over 30 million?

(a)  

13.

How much is the compensation for the board for each applicant examined? (in Php)

(a)  

14.

What is the hourly compensation for a Civil Engineer who is teaching having doctorate degree?

a)

150 php

b)

350 php

c)

200 php

d)

500 php

15.

What is the hourly compensation for a Civil Engineer who is teaching having Master Degree?

(a)  

16.

What is the hourly compensation for a Civil Engineer who is conducting tutorials/refresher courses?

(a)  

17.

What is the hourly compensation for a Civil Engineer who is serving as lecturer?

(a)  

18.

When a CE serves as an expert witness, how much he/she be compensated? (per appearance)

(a)  

19.

Engineers should encourage their engineering employees to become registered at the earliest possible date. What Canon does this guideline fall under?

a)

Canon 7

b)

Canon 3

c)

Canon 5

d)

Canon 1

20.

There are how many Fundamental Canons of CE Ethics?

(a)  

21.

Civil Engineers shall uphold and advance the ___, ___, and ___ of the Civil Engineering profession.

a)

integrity, honor, dignity

b)

honor, dignity, integrity

c)

dignity, honor, integrity

d)

integrity, dignity, honor

22.

What are the six typical phases of construction project? (in order)

(a)  

23.

This is a requirement after successfully passing the CE board exam

(a)  

24.

The complete date RA 544 was approved.

(a)  

25.

What must be included in the design of an engineer's dry seal?

(a)  

26.

What is the term when a CE assumes overall coordination including architectural, and other engineering services?

(a)  

27.

It is a development that meets the needs of the present, without compromising the ability of the future generation to meet their own needs.

(a)  

28.

This is a term that means a person duly registered with the Board of Examiners for Civil Engineers.

(a)  

29.

This CE service involves full or part time teaching or training of prospective professionals.

(a)  

30.

This phase of construction includes fumishing the client specified number of copies of drawings, specifications, and other contract documents.

(a)  

31.

Who appoints the members of the Board?

a)

President of the Philippines

b)

PRC Commisioner

c)

Regional Director

d)

Secretary of Public Works

32.

The roster of civil engineers is being prepared by the (a)   .

33.

A person may be appointed as the member of the Board if he practiced Civil engineering for a period of not less than (a)   years.

34.

Who are the current chairman and members of the CE board?

(a)  

35.

What are the four qualifications for examination?

4 lines
36.

It is described as the income generated through business operations.

(a)  

37.

Making recommendations to the client on corrective actions or contractual measures that may be exercised by the owner. What phase of construction project is this?

(a)  

38.

This includes the provision of a general economic analysis of the client's requirements applicable to various alternatives. What phase of construction project is this?

(a)  

39.

This phase includes assisting the client in determining the qualifications and acceptability of prospective contractors, subcontractors, and materials suppliers.

(a)  

40.

The phase includes the preparation of manual for operation and maintenance requirements.

(a)  

41.

Branch of civil engineering that uses engineering techniques to achieve the safe and efficient movement of people and goods on roadways.

a)

Traffic Engineering

b)

Safety Engineering

c)

Pavement Engineering

d)

Highway Engineering

42.

These are expenses a business incur to stay in business but can't be linked to creating or producing a product/service.

a)
overhead costs
b)

fixed costs

c)

variable costs

d)

addendum

43.

It is the application of engineering principles and science used in the investigation of failure, more specifically, the failure of a machine. Component. Material, or structure.

a)
Forensic engineering
b)

Safety engineering

c)

Pavement engineering

d)

Highway Engineering

44.

It is the process of designing workplaces to prevent accidents

a)
Safety Engineering
b)

Pavement Engineering

c)

Forensic Engineering

d)

Civil Engineering

45.

It is a fixed income investment that represents a loan made by an investor to a borrower, usually corporate or governmental

a)
bond
b)

fixed cost

c)

addendum

d)

overhead costs

46.

What are the seven classifications of CE Services?

4 lines
47.

CPD stands for?

a)

Continuing Professional Development

b)

Continuous Prime Development

c)

Continuous Professional Development

d)

Continuing Prime Development

48.

The Civil Engineer shall perform Scope of the Services as stated in what section?

(a)  

49.

The Civil Engineer shall exercise reasonable ___, ___, and ___ in the performance of his obligations

a)

skill, care, diligence

b)

care, skill, diligence

c)

skill, diligence, care

d)

diligence, care, skill

50.

Enumerate the seven different specialization considered by the PICE.

4 lines
51.

What are required between the clients and the civil engineer to fulfill their responsibilities?

(a)  

52.

The Civil Engineer has the obligations as _____ to the public interest as well as _____ to the private interest of the Client

(a)  

53.

As Civil Engineers, we are given responsibility for? Give the 5 Engineering Works.

(a)  

54.

SETTLEMENT OF DISPUTES. If dispute arises on either party, then the party shall by notice of writing served on the other party of the details of the dispute and request that the dispute be resolved by _____.

a)

Conciliation

b)

Arbitration

c)

Negotiating

d)

Bidding

55.

If the dispute is not resolved by conciliation, then the dispute shall be referred to _____.

a)

Arbitration

b)

Negotiation

c)

Appraisals

56.

The Client may suspend all or part of the services or terminate the Agreement by written notice of NOT LESS THAN (a)   days to the Civil Engineer.

57.

The civil engineer, by written notice of no less than (a)   days, may terminate or suspend all or part of the services.

58.

Under what conditions can the civil engineer terminate their services?

4 lines
59.

CANON _ . Civil Engineer shall issue public statements only in an _____ and _____ manner.

(a)  

60.

CANON _ . Civil Engineers shall perform services only in the areas of their (a)   .

61.

Civil Engineers shall build their professional reputation on the merit of their services and shall not compete unfairly with others. What CANON is this?

a)

Canon 5

b)

Canon 1

c)

Canon 7

d)

Canon 2

62.

Civil Engineers shall continue their professional development throughout their careers, and shall provide opportunities for the professional development of those civil engineers under their supervision. What CANON is this?

a)

Canon 7

b)

Canon 5

c)

Canon 6

d)

Canon 4

63.

Civil Engineers shall act in such a manner as to uphold and enhance the honor, integrity, and dignity of the civil engineering profession. What CANON is this?

a)

Canon 6

b)

Canon 2

c)

Canon 4

d)

Canon 1

64.

Ciivil Engineers shall act in professional matters for each employer or client as faithful agents or trustees, and shall avoid conflicts of interest. What CANON is this?

a)

Canon 4

b)

Canon 5

c)

Canon 3

d)

Canon 1

65.

These services deal primarily with collecting, interpreting, and reporting information, together with formulating conclusions and making recommendations.

(a)  

66.

These services may include the broad areas of developing the engineering requirements of master plans for long-range capital improvement programs.

a)

Preliminary and Feasibilty Investigations and Reports

b)

Planning Studies

c)

Appraisals, Valuations and Rate studies

d)

Assistance in financial matters

67.

These services may include investigations and analyses of existing conditions.

a)

Preliminary and Feasibilty Investigations and Reports

b)

Planning Studies

c)

Appraisals, Valuations and Rate studies

d)

Assistance in financial matters

68.

These services usually precede the authorization of a capital project and may involve extensive investigations, analyses of conditions and comparison of several possible plans.

a)

Preliminary and Feasibilty Investigations and Reports

b)

Planning Studies

c)

Appraisals, Valuations and Rate studies

d)

Assistance in financial matters

69.

These includes services such as assistance in preparation for legal proceedings.

a)

Direct Personal Services

b)

Material Engineering and Equipment Tests

c)

Special Services

d)

Research and Development

70.

These services include test of materials and equipment under established codes and standards.

a)

Direct Personal Services

b)

Material Engineering and Equipment Tests

c)

Special Services

d)

Research and Development

71.

It is a specialized investigation and gathering of data from existing resources or through laboratory works.

(a)  

72.

This is a condition when a CE engages to perform work or fulfill duties regularly for wages or salary being paid by an employer.

(a)  

73.

What is the content of Section 1 of RA 544?

(a)  

74.

What is the title of Article 2 of RA 544?

(a)  

75.

What is the title of Article 1 of RA 544?

(a)  

76.

What is the title of Article 3 of RA 544?

(a)  

77.

What is the title of Article 4 of RA 544?

(a)  

78.

What is the title of Article 5 of RA 544?

(a)  

79.

What is the title of Section 23 of RA 544?

(a)  

80.

What is the title of Section 20 of RA 544?

(a)  

81.

What is the title of Section 3 of RA 544?

(a)  

82.

What is the title of Section 4 of RA 544?

(a)  

83.

What is the title of Section 5 of RA 544?

(a)  

84.

What is the title of Section 6 of RA 544?

(a)  

85.

What is the title of Section 7 of RA 544?

(a)  

86.

What is the title of Section 8 of RA 544?

(a)  

87.

What is the title of Section 9 of RA 544?

(a)  

88.

What is the title of Section 10 of RA 544?

(a)  

89.

What is the title of Section 11 of RA 544?

(a)  

90.

What is the title of Section 12 of RA 544?

(a)  

91.

What is the title of Section 13 of RA 544?

(a)  

92.

What is the title of Section 14 of RA 544?

(a)  

93.

What is the title of Section 15 of RA 544?

(a)  

94.

What is the title of Section 16 of RA 544?

(a)  

95.

What is the title of Section 17 of RA 544?

(a)  

96.

What is the title of Section 18 of RA 544?

(a)  

97.

What is the title of Section 19 of RA 544?

(a)  

98.

What is the title of Section 21 of RA 544?

(a)  

99.

What is the title of Section 22 of RA 544?

(a)  

100.

What is the title of Section 24 of RA 544?

(a)  

101.

What is the title of Section 25 of RA 544?

(a)  

102.

What is the title of Section 26 of RA 544?

(a)  

103.

What is the title of Section 27 of RA 544?

(a)  

104.

What is the title of Section 28 of RA 544?

(a)  

105.

What is the title of Section 29 of RA 544?

(a)  

106.

What is the content of Section 29 of RA 544?

(a)  

107.

What are the 4 classes of work that shall not be undertaken by Maestro de Obras in making plans supervision?

4 lines