WorksheetsInitial assessment 301 part 2
Total questions: 19
Worksheet time: 10mins
Which of the following information is not required for an isometric drawing?
Location of building
Room dimensions
Positions of walls
Window specifications
Which of the following is a benefit of isometric drawings?
Provides a pictorial view of the finished product
Helps the customer understand what the product will look like
Provides a pictorial view of the design concept
All of the above
Which of the following is not required to produce isometric projection drawings?
Isometric axis
Customer details
Scale
Object dimensions
Which construction method is used to ensure heat loss is at a minimum?
Location of insulation
Selection of workforce
Following HASAWA 1974
Location of services
What does EPC stand for?
Energy Presence Critical
Energy Presence Certificate
Energy Performance Critical
Energy Performance Certificate
What insulation material is abbreviated to PIR?
Polyisurate
Polyisocyanurate
Polyisocyan
Polyisorate
What insulation material is abbreviated to EP?
Excellent polystyrene
Expanding polystyrene
Energy polystyrene
Expanded polystyrene
Which sustainable product is sourced by FSC?
Timber
Bricks
Stone
Cement
Which of the following is not a sustainable insulation installation?
Sheep’s wool
Denim wool
Hemp wool
Fibreglass wool
FSC stands for what?
Forest Stewardship Commission
Forest Standards Commission
Forest Standards Council
Forest Stewardship Council
Which of the following is not a renewable energy technology?
Wind turbines
Photovoltaic panels
Wall-sourced heat pump
Rain water harvesting
U-values measures how quickly what happens?
Heat escapes through a structure
Light escapes through a structure
Sound escapes through a structure
Air escapes through a structure
The higher the U-value, the:
Lower the thermal resistance?
Higher the thermal resistance?
Lower the thermal value?
Higher the thermal value?
An estimate is a what?
Set cost of materials
Variable cost of materials and labour
Set cost of materials and labour
Set cost of labour
A quote is a what?
Set cost of materials and labour
Variable cost of labour
Variable cost of materials
Variable coat of labour and materials
Which of the following is not required when preparing a quote?
Labour costs
VAT
Material costs
Set cost of materials and labour
What is the origin of the word GANTT?
An acronym
A person’s name
A company name
A town name
Which of the following is not site documentation?
Personal details
Organisation chart
Method statement
Risk assessment
Which of the following is not a defect identified via a site survey?
Poor standard of work
Poor quality of materials
Lack of workforce
Damaged materials
