
Railway airport docks and harbour ENGINEERING
Authored by BACKIYARAJ B
Education
University
Used 5+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
15 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Minimum gradient in station yards is generally limited to
1 in 1000
1 in 750
1 in 500
0
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Indian Railway Nationalized in which year?
1955
1952
1950
1953
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Rail section is generally designated by its
Area of its cross-section
Total weight
Total length
Weight per metre length
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Conical surface of the approach area rises outwards
1 in 10
1 in 15
1 in 20
1 in 25
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The yards in which wagons are stored and new trains are formed are called
Station yards
Goods yards
Marshalling yards
Junction yards
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The FAA classification of the airport is based on:
Length of Runway
Function
Airport approach speed
Geometric design
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The minimum width of clearway is
200m
50m
100m
150m
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?